publicité
SKYMTL
Membre-
Compteur de contenus
1 394 -
Inscription
-
Dernière visite
-
Jours gagnés
4
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par SKYMTL
-
Well, I am definitely crossing my fingers. Not only is this a perfect location (walking distance to the downtown core + Old Port + Ste Catherine) but the building could really stand out on the skyline. Unfortunately, we have seen far too many projects fall by the wayside over the lat few years...
- 2 658 réponses
-
- architecte
- architex
- (et 14 en plus)
-
Nobody finds it odd that there hasn't been any placard, etc posted at the site? I was just going through the borough's website and there isn't a single mention of a permit for this block. Unless I am missing something...
- 2 658 réponses
-
- architecte
- architex
- (et 14 en plus)
-
griffintown Gallery sur le Canal - 14, 14, 14 étages
SKYMTL a répondu à un sujet de monctezuma dans Complétés
4 Phases? Why?- 951 réponses
-
- le-sud-ouest
- résidentiel
-
(et 1 en plus)
Étiqueté avec :
-
Supposedly pre-sales have stalled on this one. I have been told they didn't receive a new reservation in the last 4 weeks.
-
I agree. Interesting choice of crane.
- 2 363 réponses
-
- altitude
- architecte
-
(et 14 en plus)
Étiqueté avec :
-
14 étages bureau = 20-22 étages résidentiel
- 372 réponses
-
- architecte
- béïque
-
(et 14 en plus)
Étiqueté avec :
-
I have to laugh at the scale of that drawing. There is no way the Triomphe will be that high in relation to the building next to it.
- 372 réponses
-
- architecte
- béïque
-
(et 14 en plus)
Étiqueté avec :
-
Why should they install a helipad when Quebec is the only major province to not have an emergency helicopter service?
- 775 réponses
-
- ancienne
- architectes
-
(et 15 en plus)
Étiqueté avec :
-
The original proposal had 4 condo towers. I now count 5 + Zuni's new tower. Nice!
- 284 réponses
-
- architecte
- corporation
-
(et 11 en plus)
Étiqueté avec :
-
This makes literally every other condo project look like a joke IMO. Good on them!
- 284 réponses
-
- architecte
- corporation
-
(et 11 en plus)
Étiqueté avec :
-
Quartier Dix30, phase 4
SKYMTL a répondu à un sujet de WestAust dans Projets oubliés et/ou en suspens
Yup. SkySpa. -
Wow. Either those floor plates are the slimmest in the world or the entire construction is nothing but scaffolding at this point.
-
I really like the layouts of some of those units!
-
Funny you should mention this. A friend told me this morning that the APCHQ was investigating something to do with sub-standard construction and some other complaints in this general area. I wonder if the NDG borough had launched their own investigation and this is the result?
-
From what I see, they removed. Latest press releases have it at 18 residential and 12 hotel floors for Phase I. The Gazette was reporting these heights when the project was first announced.
-
Absolutely idiotic IMO. What Gary "The Mouse" Bettman has done is the good old carrot / stick routine. Tempt them with some off-the-cuff remarks that don't hold one iota of promise and then follow up after hundreds of millions are invested by saying "nothing was ever promised". This is a massive waste of taxpayer's money. I am trying to find it but supposedly there is already a petition online to stop this from happening. I'll sign it the second I find it.
-
Why is this suddenly in the Griffintown section? "Griffintown" by definition is bordered in the east by the Bonaventure which makes M9 complex outside of Griffintown.
- 209 réponses
-
- carrés
- copropriété
-
(et 13 en plus)
Étiqueté avec :
-
I still say they need to increase the height of the whole project.
-
Transport Quebec launching radio station with traffic updates in Montreal
SKYMTL a répondu à un sujet de MTLskyline dans L'actualité
Doesn't seem to be all that accurate though. -
Transport Quebec launching radio station with traffic updates in Montreal
SKYMTL a répondu à un sujet de MTLskyline dans L'actualité
After loosing 940AM's excellent traffic reporting, I have had to make due with (shudder) CJAD for the last few years. Let's hope this gets off the ground ASAP. One other request for Transports Quebec: how about "unlocking" all of the traffic webcams? As it stands now, their site only gives access to a fraction of the webcams they have installed. The others are only accessible for the press. -
Same architects as 1009 Bleury so it should look good but retain the usual bland design.
-
With the popularity of this project, I am sure we will be seeing many more like it in the coming months.
- 234 réponses
-
- architectes
- carré
- (et 15 en plus)
-
I really don't understand why they made some of the buildings look so different from one another but this will definitely help the area. It is just too bad they are keeping that one horribly ugly building. I wonder why...
- 256 réponses
-
- logements
- résidentiel
-
(et 1 en plus)
Étiqueté avec :