publicité
-
Compteur de contenus
1 144 -
Inscription
-
Dernière visite
-
Jours gagnés
2
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par Alexcaban
-
Is all this still happening?
-
This building will finally complete Square Victoria. All that is missing is Place de la Cite II and is a perfect area. I can't wait to see this tower and Altitude going up.
-
École des métiers du tourisme de Montréal (2012)
Alexcaban a répondu à un sujet de monctezuma dans Complétés
From the JMSB -
Tunnel from Guy Metro. Inside the Tunnel. Still not really. Haven't seen any workers doing anything in the passed weeks.
-
École des métiers du tourisme de Montréal (2012)
Alexcaban a répondu à un sujet de monctezuma dans Complétés
I think we can move this into under construction. I was on the 6th floor of the JMSB and I could see them re-doing the roof. -
Passed by this week-end and it's 60% sold
- 25 réponses
-
- antonio-dagenais
- coin
- (et 10 en plus)
-
ville-marie Esplanade Tranquille
Alexcaban a répondu à un sujet de Atze dans Lieux de culture, sport et divertissement
I forgot what is going to be there?- 1 373 réponses
-
- équipement sportif
- parc
-
(et 1 en plus)
Étiqueté avec :
-
Will anything start this coming week?
- 2 363 réponses
-
- altitude
- architecte
-
(et 14 en plus)
Étiqueté avec :
-
Thank god Guy-Concordia really worries me!! They have also been adding a few MetroVision's to some stations over the passed weeks. Place-des-Arts Vendome Square-Victoria Place-D'Armes Université-de-Montréal Honoré-Beaugrand I'm surprised that Peel still does not have!
-
Place du SPECTRUM / Complexe SIDEV - 26 étages (2011)
Alexcaban a répondu à un sujet de mtlurb dans Projets Annulés
It will be great. All they need to do now is fix up the area of Saint Catherine between Guy and Atwater and is the most perfect street in the world. -
Place du SPECTRUM / Complexe SIDEV - 26 étages (2011)
Alexcaban a répondu à un sujet de mtlurb dans Projets Annulés
I knew it!!! enfin!!!! -
Is that what Sainte-Catherine will look like when there done working on it because it looks amazing!
-
The tunnel that will connect the Hall and LB to the Metro looks to be complete and ready to open soon. I saw them working on the tunnel from the turnstiles next to the Uniprix
-
Place du SPECTRUM / Complexe SIDEV - 26 étages (2011)
Alexcaban a répondu à un sujet de mtlurb dans Projets Annulés
What they are doing now on St.Cat is laying the groundwork for a vacuum waste collection system. Also planned is the necessary electrical work for the lighting superstructures and large screens, as well as the lighting for the streets, fountains, squares and sidewalks. And i'll repeat it again and again that large hole should become a large Best Buy! -
STM : Circuit 747 Centre-ville-aéroport
Alexcaban a répondu à un sujet de jesseps dans Projets oubliés et/ou en suspens
Buses on the 747 route are equipped with three luggage racks for the convenience of travellers. http://www.stm.info/english/info/a-747.htm -
I can't wait until they finish renovating the GM building. It will be nice to see it as an all glass building.
-
Montreal primed for NFL/MLB/MLS franchises
Alexcaban a répondu à un sujet de Philippe dans L'actualité
This photo was taken on a few days before the 11th of February. That week the whole eastern side of the USA were experiencing a massive snow storm. Thats why the area is empty. -
ville-marie Place des Arts : rénovations extérieures
Alexcaban a répondu à un sujet de Hercule dans Lieux de culture, sport et divertissement
Its still being worked on! The new ticket office is built and the outside is getting the make over -
Aéroports de Montréal - Trudeau : Hangar Air Transat (2008)
Alexcaban a répondu à un sujet de MTLskyline dans Complétés
This project finished a long time ago!!- 7 réponses
-
- adm
- administratif
- (et 17 en plus)
-
ville-marie Waldorf Astoria Montréal - 35 étages (2007)
Alexcaban a répondu à un sujet de mtlurb dans Projets Annulés
With all the new Concordia additions this will really complete the Guy area!! -
those street sign on young st are just really tacky!!
-
Is the owner still serious about this project?
-
montréal STM - Discussion générale
Alexcaban a répondu à un sujet de mtlurb dans Transports en commun
WHAT that sould this the best in world. I would rather that sound the then that horribal sound of steel wheels on the tracks like in NY or Toronto- 945 réponses
-
- actualités
- discussion
-
(et 2 en plus)
Étiqueté avec :
-
Look we all judged the Westin and look at the final product, we love it so maybe it will be the same case with this hotel
-
Just passed by about an hour ago and i noticed that the 1st and 2nd floors are gutted and look to be undergoing major renovations inside. I guess the outside in next.