publicité
-
Compteur de contenus
1 696 -
Inscription
-
Dernière visite
-
Jours gagnés
3
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par budgebandit
-
ville-marie 444 de Maisonneuve Ouest - 11 étages
budgebandit a répondu à un sujet de GDS dans Complétés
Those look like prefab concrete panels The reason why they haven't installed the edge panels is simply because they are the hardest to install given the fact that all the other panels have already been installed and they won't "fit" as easily. Normally, these panels have to be cut to the exact on-site dimensions of the remaining opening rather than using the dimensions listed on the architectural drawings. If every other panel installed is even 2mm too big, it adds up when you get to that final panel. In extreme cases, every single panel has to be adjusted and re-installed for the final panel to fit. The same principle applies to curtain wall installations. Hope that helps -
ville-marie Tour Deloitte - 26 étages (2015)
budgebandit a répondu à un sujet de mtlurb dans Complétés
I went on a tour of the Deloitte building here a couple of weeks ago (with someone I know) and while the building may not be as "green" as the one in Amsterdam, the office concept of "no set workspace" is exactly the same. You have to reserve your spot via an app and no one has precedence over anyone else (a junior auditor and the VP's have to battle it out on an even playing field haha). They also have MANY different types of working spaces, including a few treadmill desks! Most importantly though, the bathroom doors open with a wave of your hand so you never have to touch them -
montréal STM - Discussion générale
budgebandit a répondu à un sujet de mtlurb dans Transports en commun
Renovation work at Laurier metro from June 6th to December 22nd Deadline for submissions is March 10th- 945 réponses
-
- actualités
- discussion
-
(et 2 en plus)
Étiqueté avec :
-
ville-marie CHUM - 17, 20 étages (2021)
budgebandit a répondu à un sujet de monctezuma dans Complétés
Si c'est bien le cas, mes excuses Rocco! Tu as raison et je suis entièrement du même avis -
ville-marie CHUM - 17, 20 étages (2021)
budgebandit a répondu à un sujet de monctezuma dans Complétés
L'expertise du Québec??? The CHUM was built by a consortium led primarily by OHL (Spain) and Laing O'Rourke (England) whereas the MUHC was built by SNC-Lavalin.... -
ville-marie QUAD Windsor (Projet global)
budgebandit a répondu à un sujet de WestAust dans Propositions
Because it wasn't raining when Noah built the Ark- 1 297 réponses
-
- cadillac-fairview
- peel
-
(et 1 en plus)
Étiqueté avec :
-
30th floor will be completed by this Thursday 20 more to go (or is it 23...or is it 27 ) !!!
-
Fiorellino is actually already open, I was there last Friday night. The pizza was OK (good dough and toppings, bland sauce) but the ambiance really leaves something to desired (lighting was too bright and the space just felt cold) Would I go back? Probably not given how many excellent pizza places we have in this city. PS Prices were actually not too bad and the menu isn't very extravagant (4-5 antipasti's, about a dozen pizza choices, 4-5 pastas and dessert)
- 562 réponses
-
- autorise
- commerciales
- (et 15 en plus)
-
ville-marie Îlot Balmoral (ONF) - 13 étages (2020)
budgebandit a répondu à un sujet de CFurtado dans Complétés
In english it's called a "slurry wall" -
Sorry! The pictures didn't upload properly and I was too lazy to edit haha
-
Une institution internationale déménage son siège social de Paris à Montréal
budgebandit a répondu à un sujet de ChrisDVD dans L'actualité
I have also noticed A LOT more French accents in recent months. -
ville-marie Tour des Canadiens - 50 étages
budgebandit a répondu à un sujet de mtlurb dans Complétés
December 18th 2015 -
ville-marie Hôtel Mount Stephen - 12 étages
budgebandit a répondu à un sujet de mtlurb dans Complétés
December 18th 2015 -
December 18th 2015 - not really YUL but this thread needs some love
- 3 381 réponses
-
- brivia
- maisons de ville
-
(et 2 en plus)
Étiqueté avec :
-
ville-marie Le Roccabella - 40, 40 étages (2018)
budgebandit a répondu à un sujet de IluvMTL dans Complétés
December 18th 2015 Lots of action in the new Bombardier store! They had a full bar setup inside the store and lots of table settings towards the back. I'm guessing it's for the official launch either tonight or tomorrow night. -
December 18th 2015
-
Renaissance Hotel by Marriott
budgebandit a répondu à un sujet de WestAust dans Projets oubliés et/ou en suspens
-
Développement immobilier du secteur Pierrefonds-Ouest
budgebandit a répondu à un sujet de ScarletCoral dans Projets oubliés et/ou en suspens
I've lived in the area my entire life and used to ride my bike through those fields all the time. As long as they stay away from the wooded area bordering Timberlea, losing this "green space" is really not a big deal (it's mostly just tall grass and swampy areas). I can also tell you, from personal experience, that the proposed north-south boulevard urbain is MUCH needed. If this development gets it built, I'm all for it.- 28 réponses
-
- boulevard
- conservation
-
(et 13 en plus)
Étiqueté avec :
-
Like I said back in August, I was told the final height would be 187m... Not 183.8m I guess we'll have to wait and see
-
ville-marie S sur le Square - 14 étages
budgebandit a répondu à un sujet de blue_dragon dans Complétés
December 6th 2015 -
Your cousin is right Marty. There are quite a few renovation/upgrade projects currently in the pipeline for PET
-
Marty... does your cousin work for Groupe Lessard?
-
ville-marie Holiday Inn Montréal Centre-Ville - 37 étages (2017)
budgebandit a répondu à un sujet de mtlurb dans Complétés
November 15th 2015 -
ville-marie TOM Condos - 42 étages (2019)
budgebandit a répondu à un sujet de monctezuma dans Complétés
November 15th 2015 -
That's the Roccabella webcam. You can find the link in the description for that project