publicité
-
Compteur de contenus
1 144 -
Inscription
-
Dernière visite
-
Jours gagnés
2
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par Alexcaban
-
The starbucks opens April 11th
-
ville-marie Hôtel Hilton Hampton Inn & Suites (1206 et 1208 rue Drummond) - 13 étages (2013)
Alexcaban a répondu à un sujet de IluvMTL dans Projets Annulés
Wtf this looks like something around the Concordia area. -
ville-marie Tour Quartier des spectacles (Spectrum) - 14, 33 étages (2018)
Alexcaban a répondu à un sujet de mtlurb dans Projets Annulés
I'm not sure if Starbucks owns the building but it wouldn't surprise me. As for the sales of the store, yes the winter months are slower but the summer months make up for it. From the last report I read, Jazz festival week the sales were between ~45,000-50,000, Rest of summer ~30,000-40,000 and winter, ~15,000-17,000 with the exception of the montreal en lumiere festival (~20,000) so still does pretty well.- 1 230 réponses
-
- bureaux
- spectacles
-
(et 1 en plus)
Étiqueté avec :
-
yes it does belong to Station des Sports and they are currently expanding into the whole building.
- 210 réponses
-
- commercial
- mixte
-
(et 3 en plus)
Étiqueté avec :
-
ville-marie Tour Quartier des spectacles (Spectrum) - 14, 33 étages (2018)
Alexcaban a répondu à un sujet de mtlurb dans Projets Annulés
Like I said before, I work for starbucks and the one at Jeanne-Mance is to profitable, they will never give it up.- 1 230 réponses
-
- bureaux
- spectacles
-
(et 1 en plus)
Étiqueté avec :
-
montréal STM - Discussion générale
Alexcaban a répondu à un sujet de mtlurb dans Transports en commun
Sued for what!! having garbage in a bus shelter, take a chill pill its winter.- 945 réponses
-
- actualités
- discussion
-
(et 2 en plus)
Étiqueté avec :
-
December 16 The crane is up. BTW the project is 16 floors not 11.
-
http://www.stm.info/info/comm-12/co121113.htm
-
Concordia GM Building - 11 étages
Alexcaban a répondu à un sujet de Alexcaban dans Projets oubliés et/ou en suspens
Its moving slow cause they are working on the inside also. Floor 7 and 9 are completely being redone. -
STM : Station Guy-Concordia (rénovations majeures)
Alexcaban a répondu à un sujet de monctezuma dans Complétés
October 11 Not bad, at least it in the Concordia style. -
October 11
- 28 réponses
-
- contemporain
- jeanne-mance
-
(et 3 en plus)
Étiqueté avec :
-
If anyone get the chance to pass by and get a photo or two, you'll see that the work is coming along quite well. I'll see if I have time tomorrow.
- 28 réponses
-
- contemporain
- jeanne-mance
-
(et 3 en plus)
Étiqueté avec :
-
https://www.dropbox.com/gallery/8423960/1//2012-Mix?h=ca1864&p=1#/
-
anyone notice the Quality Inn's new paint.
-
When does the marche adonis open?
-
STM : Station Guy-Concordia (rénovations majeures)
Alexcaban a répondu à un sujet de monctezuma dans Complétés
Went to have a look at the work that was done, I could tell you that this station still needs a complete overhaul on the platforms and on the Guy side, however the St-Mathieu side looks amazing now!! Still a few things that are being worked on. The before photos are from the stm facebook page. Before: After: New doors Before: After: New lights, new granite stairs Before: After: New floor, new wall tiles -
July 17 I think it looks great!!
-
ville-marie Tour Quartier des spectacles (Spectrum) - 14, 33 étages (2018)
Alexcaban a répondu à un sujet de mtlurb dans Projets Annulés
I hope that complex desjardins comes with a recladding to match the new tower. Wouldn't that be nice- 1 230 réponses
-
- bureaux
- spectacles
-
(et 1 en plus)
Étiqueté avec :
-
July 12 WEST of Guy FB Building
-
Concordia GM Building - 11 étages
Alexcaban a répondu à un sujet de Alexcaban dans Projets oubliés et/ou en suspens
July 12 -
STM : Station Guy-Concordia (rénovations majeures)
Alexcaban a répondu à un sujet de monctezuma dans Complétés
New celling on the Guy side. -
STM 168: http://www2.stm.info/taz/horaire.php?l=168&d=N&t=60700&lng=a STM 12: http://www2.stm.info/taz/horaire.php?l=12&d=N&t=60699&lng=a
-
ville-marie Tour Quartier des spectacles (Spectrum) - 14, 33 étages (2018)
Alexcaban a répondu à un sujet de mtlurb dans Projets Annulés
Hey I work at that starbucks I wouldn't want it to close. It's to valuable to the company and they would never let this location close unless they were to open it in the lobby of this new building.- 1 230 réponses
-
- bureaux
- spectacles
-
(et 1 en plus)
Étiqueté avec :
-
We see the crane for Altoria also.
- 2 363 réponses
-
- altitude
- architecte
-
(et 14 en plus)
Étiqueté avec :