publicité
-
Compteur de contenus
1 144 -
Inscription
-
Dernière visite
-
Jours gagnés
2
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par Alexcaban
-
Concordia GM Building - 11 étages
Alexcaban a répondu à un sujet de Alexcaban dans Projets oubliés et/ou en suspens
Well now that the winter is over and most of the inside work is done, today they where installing the last row of windows on the 11th floor and on the ground level. I can't wait to see it all finished. I'll have some photos tomorrow. -
I was waiting for the 24 earlier today, and the ground level is being renovated into a sales office.
-
Putting it on Jarry would be a big mistake!!!???? It needs to run under Jean-Talon, just look at the 141 bus route, that shows how busy the corridor is.
-
The ongoing escalator replacement is going well, the top floors have new ones (12, 11, 10, 9) and now there are working on the bottom levels. Some shots from this evening, GOODBYE old ones!!
-
I wonder how long it will take for the side wall to get graffiti on it.
- 2 363 réponses
-
- altitude
- architecte
-
(et 14 en plus)
Étiqueté avec :
-
WOW my new favorite project if only it was a little higher and but in the lot next to place des festival.
-
-
April 2
- 2 658 réponses
-
- architecte
- architex
- (et 14 en plus)
-
April 2
- 2 363 réponses
-
- altitude
- architecte
-
(et 14 en plus)
Étiqueté avec :
-
From the 15th floor of Concordia.
- 284 réponses
-
- architecte
- corporation
-
(et 11 en plus)
Étiqueté avec :
-
montréal STM - Discussion générale
Alexcaban a répondu à un sujet de mtlurb dans Transports en commun
http://www.stm.info/english/info/a-4expressouest.htm- 945 réponses
-
- actualités
- discussion
-
(et 2 en plus)
Étiqueté avec :
-
News on the tunnel to the metro.
-
STM : Station Guy-Concordia (rénovations majeures)
Alexcaban a répondu à un sujet de monctezuma dans Complétés
New turnstiles on the Concordia side. -
Montreal, nos photos pêle-mêle
Alexcaban a répondu à un sujet de Philippe dans Photographie urbaine
Station Peel...- 1 490 réponses
-
STM : Station Guy-Concordia (rénovations majeures)
Alexcaban a répondu à un sujet de monctezuma dans Complétés
As of March 5th the St-Mathieu will be closing for renovations, Work on adding more turnstiles on the Concordia side has begun. -
montréal STM - Discussion générale
Alexcaban a répondu à un sujet de mtlurb dans Transports en commun
4 new bus routes starting April 2, just as the STM promised. 1. 475 Express Dollard-des-Ormeaux 2. 405 Express Bord-du-Lac 3. 425 Express Anse-à-l'Orme 4. 485 Express Antoine-Faucon- 945 réponses
-
- actualités
- discussion
-
(et 2 en plus)
Étiqueté avec :
-
February 7 Almost done. I wonder what will take over the ground floor.
-
February 7
- 2 658 réponses
-
- architecte
- architex
- (et 14 en plus)
-
montréal STM - Discussion générale
Alexcaban a répondu à un sujet de mtlurb dans Transports en commun
Ok I have some news on a new bus route that will start in April, just as the STM promised. It should please the west island folks living in DDO. http://m.stm.info/bus/arrets/475- 945 réponses
-
- actualités
- discussion
-
(et 2 en plus)
Étiqueté avec :
-
Concordia GM Building - 11 étages
Alexcaban a répondu à un sujet de Alexcaban dans Projets oubliés et/ou en suspens
December 21 -
Concordia GM Building - 11 étages
Alexcaban a répondu à un sujet de Alexcaban dans Projets oubliés et/ou en suspens
That would be impossible cause that building has very few windows. -
STM : Station Guy-Concordia (rénovations majeures)
Alexcaban a répondu à un sujet de monctezuma dans Complétés
Good to hear, when classes end its almost impossible to move or get into the metro cause there's only like 7 turnstiles to get in and out. -
Concordia GM Building - 11 étages
Alexcaban a répondu à un sujet de Alexcaban dans Projets oubliés et/ou en suspens
One last building left to reclad and that is the Hall building but Concordia has no plan yet to do anything with the outside of the building. However the inside is starting to look amazing, New escalators!!!