il y a 1 minute, twix a dit :

De ce que j'ai compris hier, cette opération est automatisée, delà la nécessitée de faire des test poussées    

Car ils ont pas eu assez de 2 ans de tests au préalable. De la grosse boulechite.

Lien vers le commentaire
Partager sur d’autres sites

publicité
37 minutes ago, twix said:

Just for understading , what advantages we get by running shorter trains ?

I could think of :

1- Save energie

2- Less noise for neighbors

3- Save in vehicle maintenance

 

 

The OC Transpo LRT is now mostly running half trains, every now and again they will double up. The principal reason was the savings on maintenance, while accepting the odd train will be overpacked, the cost of running full train only in a deficit riddled, lower user volume transit system like ours was too onerous! 

  • Like 3
Lien vers le commentaire
Partager sur d’autres sites

Il y a 13 heures, KOOL a dit :

 

Et sérieusement j'ai de la difficulté à concevoir comment quelques bâtons de dynamite oubliés en 1918 dans le tunnel Mont-Royal, probablement rendus inutilisables par 100 ans d'exposition à l'humidité, ont bien pu retarder les travaux d'une année. 

Pas d'une année....de deux années!!

Initialement c'était 2020-2022 !!

Lien vers le commentaire
Partager sur d’autres sites

il y a 16 minutes, Chris1989 a dit :

You guys can nitpick and complain all you want, but we have our first phase (16.6km) up and running after only 5 years of construction with a 99% service reliability rate. Meanwhile in Toronto... Eglinton Line 5 is a 19km project, under construction since 2011 and now nearing $13 billion (up from the original $5 billion budget) and as of yesterday, officially delayed indefinitely😂  If things keep going the way they are, Montreal will have ~60km of light metro rapid transit built in half the time it took Toronto to build a 19km tram line. 

 

CDPQi. Our Blue Line will take forever and is built by the governement. REM de l'Est is overtaken by the government and will take forever. Same old. Who in his right mind thinks the blue line will open in 2030?

  • Like 1
  • Sad 1
Lien vers le commentaire
Partager sur d’autres sites

If someone has a Wayback Machine slice of stm.info from a year or so ago, I don't believe the "Train Control System" page mentioned more detailed timelines before, or Blue line service cuts in "late evenings or weekends" beginning in 2026.

IMG_1894.thumb.jpeg.e10c38fb95b8aa082086b21bbba94e2c.jpeg

Lien vers le commentaire
Partager sur d’autres sites

Il y a 11 heures, Rocco a dit :

CDPQi. Our Blue Line will take forever and is built by the governement. REM de l'Est is overtaken by the government and will take forever. Same old. Who in his right mind thinks the blue line will open in 2030?

Le privé (ou "privé" dans ce cas) est plus efficace que le public.

Modifié par Corbeau
Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.


publicité


×
×
  • Créer...