Aller au contenu
publicité

budgebandit

Membre
  • Compteur de contenus

    1 693
  • Inscription

  • Dernière visite

  • Jours gagnés

    3

Tout ce qui a été posté par budgebandit

  1. https://www.nytimes.com/2019/05/12/science/5g-phone-safety-health-russia.html Not going to post the entire article here because it's quite long but this is a very good read
  2. Very possible that they didn't properly protect the ventilation conduits during construction. Now that all the equipment is up and running, the dust is being blown out through the ducts
  3. Carbonleo already has many commercial tenants lined up (including anchor tenants and some that do not yet have a presence in Montreal). There’s a reason they’re starting with the commercial component; the demand is there.
  4. 2nd location for Tacos Frida (the first one is on Notre-Dame in St-Henri)
  5. Mixed projects are actually a very good idea. They act as a catalyst for street-level activity with different types of people (owners, renters and tourists). The number of tourists is increasing every year (and China/Japan are just starting to discover our city) and vacancy rates continue to decrease. Just because there is a small hotel nearby doesn't mean that there isn't a need to increase the offer.
  6. 3 towers: 14, 20 and 61 Not quite Haut! Haut! Haut! but we'll take it!
  7. In general, slurry walls are used when the water table is too high or when the excavation is near a water source (past or present)
  8. Exactly. A slurry wall is simply to protect the excavation. It is has no structural purpose once the actual foundations are poured
  9. There is already a thread for this project in the Cancelled Projects section. Regardless of what they are advertising, I highly doubt this will be a luxury project lol FYI, construction is moving forward; they are about 2-3 floors above ground.
  10. The rust is coming from the painted chevetres, not from the rebar in the concrete (which is entirely in stainless steel as @DravasQc mentioned)
  11. Est-ce qu'un mod peut mettre ce lien dans l'entete? C'est tres pertinent! Merci
  12. Can you please explain to me why it's a language issue? Two unnecessary comments...
  13. I just received some info via e-mail! - The project is already on sale via appointment only. Official public launch will take place on April 16th. - Studios starting at $230K + tax (for a 282 sqft condo! ) - Condo fees: $0.41/sqft, Parking: $58,000.00, Locker: included ($5,000 value) - OCCUPANCY DATE: SUMMER 2022 - SPRING 2023 - LINK FOR PRICE LIST AND FLOOR PLANS: https://drive.google.com/drive/folders/114_tObkm05_GrrjRxhTEqHmcVve4p6-v
  14. budgebandit

    Expos de Montréal

    Stephen Bronfman just did an impromptu interview on CTV News live from ExposFest. Didn't give many details but he did stress that things are moving forward. Keep the faith!
×
×
  • Créer...