Gilbert

Tour Quartier des spectacles (Spectrum) - 14, 33 étages (2018)

Recommended Posts

Pinned posts

TOURQDS.jpg

Projet en train d'être repensé: https://renx.ca/montreal-tour-des-canadiens-3-condo-tower-launches/
NOUVEAU PROJET: 

Citation

Nom: Tours Quartier des spectacles
Hauteur en étages: 14, 33
Hauteur en mètres: 65, 145
Coût du projet: 150 000 000,00$
Promoteur: Canderel et Fonds immobilier de solidarité FTQ
Architecte:
Entrepreneur général:
Emplacement: Ancien Spectrum
Début de construction:
Fin de construction:
Site internet:
Lien webcam:
Autres informations:  phase 1 : tour de 14 étages (13+1 mécanique), phase 1 : 35 000 m2 de bureaux, phase 2 : tour de 33 étages (30+3 mécaniques). phase 2 : 2 400 m2 de commerces, 96 600 m2 de bureaux, 286 places de stationnement, 7 quais de chargement
Rumeurs: VISA serait potentiellement locataire de la phase 2, le promoteur tente d'intégrer les petites maisons en front sur Sainte-Catherine
Aperçu artistique du projet: 
Maquette:

Autres images:
Vidéo promotionnelle:

 

Partager ce message


Lien à poster
Partager sur d’autres sites

Pauline could base her new Banque du Quebec in there. Alternatively she can create a new bureaucratic entity and base it there as well.. at no cost to taxpayers of course!

Partager ce message


Lien à poster
Partager sur d’autres sites

Rares sont les projets qui se sont réalisés du premier coup. Quand on regarde l'historique de la plupart des immeubles importants de Montréal, (et sûrement ailleurs au pays et dans d'autres pays) les changements, les délais et autres modifications font pratiquement partie de la nature des choses. Alors pourquoi se surprendre ici et surtout sauter si vite aux conclusions. Le site demeure un endroit de choix, son potentiel n'a pas diminué, et une autre construction, peut-être supérieure, viendra remplacer éventuellement ce qui était planifié.

 

Il faut voir l'évolution des villes sur des décennies. Une mesure beaucoup plus longue que notre petit temps individuel et trop souvent accompagné de l'impatience qui caractérise certains d'entre nous. On comprendra que la réalisation d'un gros projet nécessite des années de préparation, de négociations et de recherches de locataires ou occupants. Aussi de longues démarches de financement et une quantité de professionnels de tous genres, travaillant de l'élaboration des besoins jusqu'à la finalisation des plans. Sans compter les conseillers juridiques et les multiples démarches pour les permis, la réglementation et les politiques municipales. Bien sûr aussi les contrats de construction proprement dit, signés avant même de lever la première pelletée.

 

A tout cela il faut ajouter le contexte du marché qui évolue constamment et qui peut retarder ou faire avancer un projet en fonction d'une foule d'impondérables. Les facteurs internes et externes sont donc nombreux et seul un alignement de toutes les conditions mèneront à la concrétisation d'un projet donné.

 

Alors laissons donc le temps au temps, et cessons les stupides spéculations et les sarcasmes qui n'apportent absolument rien de constructif dans ce fil. Pauline Marois n'a rien à voir dans ce dossier et n'a pas à être mêlée à la basse politique que certains entretiennent. Ce forum est un outil d'échanges constructifs et de partages honnêtes et de bonne foi. Il n'a pas à subir les abus de ceux qui ne savent pas s'en servir intelligemment, tout en manquant de respect de manière constante vis à vis des autres membres.

Partager ce message


Lien à poster
Partager sur d’autres sites
Pauline could base her new Banque du Quebec in there. Alternatively she can create a new bureaucratic entity and base it there as well.. at no cost to taxpayers of course!

 

Can't create a bank with no money...... ;)

Partager ce message


Lien à poster
Partager sur d’autres sites
Can't create a bank with no money...... ;)

 

Ce que le PQ proposait (La Banque du Qc) serait faite de la fusion de Investissement Qc et d'autres entités.

Il n'y a pas création d'une nouvelle banque comme tel et ca n'a jamais été le cas.

 

Au sujet de l'Argent, ne crée pas une banque avec aucun argent, surtout pas au Canada.

Pour que la banque du Canada accepte de prêter des fonds (ce qui est le cas avec les grandes banques de ce pays), tu dois avoir des ratios de capital, une crédibilité, etc. (Banque de l'Annexe 1)

Combien de nouvelles banques ont été créée au Canada dans les 50 dernière années?

Des banques privés ok, mais ces banques fonctionnent avec leur propre capitaux (et ca leur en prend beaucoup) et non ceux de la banque du Canada. C'est très différent.

 

L'observation plus haut (et en citation) est tellement stupide...

Partager ce message


Lien à poster
Partager sur d’autres sites

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !

Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.

Connectez-vous maintenant

  • Contenu similaire

    • Par IluvMTL
      Proposition:  
      A feasibility study to consider the addition of a tramway line or bus route on McTavish Street to facilitate access to the Belvedere Kondiaronk/Chalet and other areas up the hill from downtown, especially for seniors and the mobility/physically challenged, but also to serve other users.
      Objective
      Making the Mont-Royal and other points up the hill more accessible 
      As it now stands, as far as reaching the lookout or chalet is concerned, the Peel steps and various inclines encountered are out of the question for many, including families. The closest alternate route by public transit is via Guy, plus 2 buses and a walk. That is not very convenient for many. Another important consideration is that there are no elevators in the Guy metro for people who need them.  The McTavish tramway could let people off in the Allan Memorial Institute parking lot, a few steps from the  Route Olmstead which has a much gentler slope for going the rest of the way to the lookout. If a bus route is the option selected, the service could be seasonal, or only in service on week-ends, holidays and special events. Advantages
      A tramway would be an enticement to visit the mountain, and more often, since it would be much simpler and quicker for tourists and montrealers to reach the lookout. It would also ensure that the chalet be better utilized since it would be so much easier to get to, no matter the season. More concerts and special events could be held there throughout the seasons. Since the McTavish line tramway would run though the McGill Campus, it would also be a N-S shuttle of sorts, getting McGill students and employees between the various campus buildings and the REM/Metro/downtown. This line could also be used for residents in the Square Mille, McGill Ghetto as well people going to games at Molson stadium or the other McGill athletic facilities. Being part of the Fleuve-Montagne makes it an natural draw for tourists and this line is only steps away from the main tourist office on Square Dorchester as well as Sainte-Catherine and may major hotels. People could also transfer to the ave des Pins bus for other points east and west. The line is a short hop from McGill Metro, the REM and Central Station, making it part of the hub. The route could be extended further southward to the Tourist office at Dorchester or  widened to cover a broader area if need be. This line would be an alternative to the bus lines that run north, on Guy and du Parc. Easier public access means fewer private cars and tour busses traveling to the mountain, and fewer vehicles on the road. The Kondiaronk summit on Mont-Royal is a major tourist attraction, Let's facilitate access for all groups.
      McTavish Tramway Route (in orange)

    • Par Gilbert
      Bonjour à tous et bienvenue dans cette nouvelle section du forum!
       
      Une section qui vous est entièrement destiné. En effet, vous pouvez nous montrer ici VOS propres projets pour la grande ville de Montréal.
      Comment voyez-vous le Montréal du futur? Quels projets voudriez-vous qu’il y ait?
      Simplement quelques petites restrictions (plus «recommandations» que «restrictions», pour que la section soit tout simplement plus amusante à regarder;) ) :
       
      1- Les projets devront être accompagné d'un appui visuelle
       
      Tout simplement que ce soit plus agréable. Un projet avec un rendu est toujours plus attirant à la critique.
      Exemple: Prenez comme exemple une des propositions de tour pour le Silo no5, même si elle aurait 50 étages, personnes n'en parle vraiment, parce que nous ne savons pas de quoi elle aurait l'air.
      Autre exemple : La tour d'Aluminium, dont tout le monde connaissait comme n'étant qu'une vision, mais qui a tout de même réussi à remplir 4 pages de son fil en deux jours! Si j'avais seulement parlé d'une vision de tour de 240 mètres sans rendus, personnes n'aurait répondu à mon fil!
       
       
      2- Les projets doivent venir de vous
       
      Simplement pour ne pas se retrouver avec des projets annulés. Ce fil n’est pas un fil nostalgique de projet abandonné.
      Aussi, simplement pas prendre de projets existant ailleurs et simplement le mettre, juste pour que Montréal reste la ville unique qu’elle est.
       
       
      Instrument conseillé pour l’appui visuel :
       
      Google sketchup
      Le logiciel est juste…INCROYABLE!
      Il est gratuit, complet (pour les débutant) et surtout…facile à utilisé.
      Je l’ai téléchargé pendant le temps des fêtes et j’ai déjà créé quelques petites choses pour ce fil!
      Vous pouvez le télécharger ici : https://www.sketchup.com/fr
       
       
      Logiciels Adobe
      (Photoshop, illustrator, etc.)
      Quand on les connaît bien, c’est quand même assez facile de travailler avec eux.
       
      ------------------------------------------------------------------------------------------------
       
      Maintenant, à vous de créer vos propres projets! Comment voulez vous que Montréal ressemble?
      P.S. Ce fil est pour les commentaires, les annonces, etc.
    • Par IluvMTL
      http://plus.lapresse.ca/screens/6ae8dd35-0e0b-48e3-b1cb-dec9a5e92473%7CHFo3prp1wfb0.html
       
      Édition du 8 août 2015,
       
      UNE NOUVELLE BRASSERIE À MONTRÉAL
       
      À titre de président du conseil de Molson Coors, Geoff Molson aura une fin d’année bien remplie alors qu’il confirme que l’entreprise brassicole est à compléter une étude qui déterminera si elle construira une nouvelle usine ou rénovera ses installations de la rue Notre-Dame.
       
      Une chose est certaine : le statu quo n’est plus possible et, selon Geoff Molson, la brasserie bicentenaire devrait normalement déménager dans des installations le plus modernes possible. On parle d’investissements qui pourraient dépasser les 300 millions.
       
      « Il faut moderniser notre production et surtout augmenter notre capacité d’embouteillage. Notre brasserie de Montréal ne peut pas produire de la bière en cannettes, et c’est une tendance lourde du marché que l’on observe aux États-Unis. »
       
      — Geoff Molson
       
      « On pourrait construire une nouvelle usine sur nos terrains à proximité de notre centre de distribution de la rue Dickson et vendre nos installations de la rue Notre-Dame à une tierce partie, à la condition que l’on ouvre le site sur le fleuve.
       
      « Ce serait une façon extraordinaire de faire exploser le Vieux-Port de Montréal et de donner, à partir du pont Jacques-Cartier, une belle vitrine sur le fleuve à la population de Montréal », évoque Geoff Molson.
       
      Chose certaine, il n’est pas question que Molson Coors quitte le site qui a vu naître les activités du groupe il y a 230 ans sans y laisser une marque commémorative indélébile.
       
      « On pourrait y construire une microbrasserie, ce qui laisserait l’empreinte de Molson sur le site et perpétuerait l’activité qu’on y pratique depuis plus de deux siècles », propose le président du conseil de Molson Coors.
       
      On saura au début de 2016 si le conseil d’administration disposera de la proposition et de la vision que vient de partager avec nous son président.
       
      sent via Tapatalk
    • Par IluvMTL
      http://ville.montreal.qc.ca/portal/page?_pageid=7317,79867570&_dad=portal&_schema=PORTAL

      COMITE CONSULTATIF D'URBANISME
      13 septembre 2018
      3001459117 et 3001431020
      4.6.39

      DEMANDE  DE CERTIFICAT  D'AUTORISATION DE  DEMOLITION ET DEMANDE DE PERMIS DE CONSTRUCTION
      639-643,rue Notre-Dame Ouest
      La demande  vise a autoriser Ia demolition du batiment ainsi que Ia construction  d'un  hotel de  5  etages  comprenant   21  chambres   et  un restaurant au rez-de-chaussee.
      Le toil,  les  planchers  ainsi que  toute Ia structure  du batiment  existant seront  demolis.    
      Les fac;ades avant  et  arriere  seront  conservees, mais plus de 40% du volume hors-sol sera demoli, done le projet doit etre traite comme   une   demolition   et  une   nouvelle   
      construction.   II  s'agit   d'un immeuble  de 3 etages hors sol, avec une fac;ade de pierre grise, construit en 1891.  Les 2e et 3e etages ainsi que son couronnement  ant conserve leur integrite.  La vitrine commerciale  du rez-de-chaussee ainsi que Ia fac;ade arriere ant ete largement modifiees.

       
    • Par monctezuma
      400 René-Lévesque Ouest
      (Aucun rendu pour le moment)