Can't we just level the elevated part (to improve the aesthetics & lower maintenance costs) & keep the boulevard as it is?

 

Which boulevard, you mean pave the land under the viaduct or Duke / Nazareth on either side?

 

In any event the project seems nuts because it would totally fuck the buses, even with the "couloir" they are still going to have traffic lights and a poor capacity while right now they have a straight freeway shot... and selling land in a linear transport ROW seems insane, even if they tore down the freeway and put a LRT in the middle or anything would seem better, considering how re-acquiring ROW would basically be impossible once large buildings are established... and with all the space around it, it isn't like there is a lack of developable space...

Lien vers le commentaire
Partager sur d’autres sites

I'm no expert on traffic configuration by a long shot, but I'm talking about tearing down the elevated part between de la Commune and St-Paul.

 

Is there a simpler (and more economical) way to configure this section (along with Duke & Nazareth St)? Can more of the expressway be sunken? Can it be done in such a way to free up land (or increase the value of the existing properties) and encourage development on either side, but preserving the wide central boulevard?

 

The view of downtown coming into view is great now, but the effect will be a lot less impressive if they divide the roadway and put buildings in between.

Lien vers le commentaire
Partager sur d’autres sites

The basic idea of the elevated freeway is to preserve the streets below so pedestrians are unaffected and it is easy to cross the road. You could basically build it in a trench with overpasses like Decarie or even with a cut-and-cover lid on top like the Ville-Marie is set up. You could run it at-grade but then there would be space issues and it would be hard to cross the area on foot...

 

Having the highway coming in below-grade would make an interesting effect when it ends and becomes University, currently it is interesting since the highway is elevated and drops down but there is a hill, the other way you'd have like this big hole that is shooting cars out of it (kind of like the 720 West -> 10 East ramp but bigger)

Lien vers le commentaire
Partager sur d’autres sites

I understand ensuring and preserving fluidity for the cars taking the Ville-Marie, so it makes sense having it below grade for that section (preferably starting before it hits the Lachine Canal) , and couldn't you have a René-Lévesque type boulevard (built right over this tunnel) for the cars travelling at a lower speed at street level (those exiting in Old-Montreal and points north to downtown)? That wouldn't hamper pedestrian or east-west vehicle crossings, as those speeding to the V-M would be in the tunnel underneath.

 

I have to admit I didn't really study their proposal to see how they dismantle the overpass and still make it a people-friendly hood as they say it will become...they had to overcome this very issue.

Modifié par IluvMTL
Lien vers le commentaire
Partager sur d’autres sites

For once I totally and completely agree with Harel.

 

That's magical thinking. The city needs to prioritize the development of downtown's many parking lots instead of fantasizing about squeezing buildings into a no-man's land between two streams of heavy traffic.

 

Hallelujah! AMEN!

Modifié par SKYMTL
Lien vers le commentaire
Partager sur d’autres sites

ASSEMBLÉE ORDINAIRE DU CONSEIL MUNICIPAL VERSION 2 Le lundi 22 août 2011 à 14 h

Assemblée ordinaire du conseil municipal du lundi 22 août 2011

Comme d'habiude vous pouvez regarder l'assemblée en webdiffusion.

 

 

ORDRE DU JOUR

Version du 18 août 2011

http://ville.montreal.qc.ca/document...2_14h00_FR.pdf

 

 

Quelques items sur l'ordre du jour:

 

65.03 Direction générale , Direction du greffe

Motion de l'opposition officielle pour l'émission d'un moratoire sur la réalisation des travaux entourant le « Quartier Bonaventure », la cessation de tout aide financière et contrats avec la Société du Havre de Montréal et le rapatriement de ces mandats au sein des services municipaux

 

 

42.04 Direction générale , Cabinet du directeur général - 1111009001

Adoption - Règlement autorisant un emprunt de 70 996 000 $ afin de financer la réalisation d'une nouvelle tranche du projet Bonaventure (phase 1)

Compétence d’agglomération : Annexe du décret - Aménagement et réaménagement du domaine public, y compris les travaux d'infrastructures, dans un secteur de l'agglomération désigné comme le centre-ville

Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.


Countup


×
×
  • Créer...