-
Compteur de contenus
493 -
Inscription
-
Dernière visite
-
Jours gagnés
3
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par Kotar
-
Ouvrages d'art - Antenne Rive-Sud
Kotar a répondu à un sujet de mtlurb dans Réseau express métropolitain
Agreed, from this picture, it's obvious the bridge will not be able to turn now.- 2 001 réponses
-
- brossard
- griffintown
-
(et 4 en plus)
Étiqueté avec :
-
It used to stink a lot more! It is apparently from an underground creek that runs under the site. Until the basement floors get built and the permanent equipment installed, they will have to continue to pump it out of the site. I believe someone in a previous post had mentioned that the project had to add an extra basement floor to deal with it. Can someone more in the know explain if they use weeping tile and sub pumps on skyscrapers? I imagine they must have something.
- 124 réponses
-
- le-sud-ouest
- résidentiel
-
(et 1 en plus)
Étiqueté avec :
-
PDC would be smart to open their own hotel on the site, with direct connection to the palais.
-
I was thinking the exact same thing. One more block would have been a 10/10. I still love it though!
- 681 réponses
-
- 1
-
- 1471 rene-levesque ouest
- résidentiel
-
(et 1 en plus)
Étiqueté avec :
-
ville-marie 1025, rue Lucien-L’Allier - ?? étages (128 mètres)
Kotar a répondu à un sujet de IluvMTL dans Propositions
I could have sworn I saw it was potentially office space. I feel like I'm taking crazy pills! Maybe they can all work from home- 135 réponses
-
- béïque- legault-thuot
- de la montagne
- (et 5 en plus)
-
ville-marie 1025, rue Lucien-L’Allier - ?? étages (128 mètres)
Kotar a répondu à un sujet de IluvMTL dans Propositions
Take it all with a grain of salt though.- 135 réponses
-
- 1
-
- béïque- legault-thuot
- de la montagne
- (et 5 en plus)
-
ville-marie 1025, rue Lucien-L’Allier - ?? étages (128 mètres)
Kotar a répondu à un sujet de IluvMTL dans Propositions
Hopefully this building and the rumored 1600 employees of a British It firm come together.- 135 réponses
-
- béïque- legault-thuot
- de la montagne
- (et 5 en plus)
-
Interesting to see there is a Loblaws on the first floor...
- 159 réponses
-
- 4
-
- 970 saint-laurent
- commercial
-
(et 2 en plus)
Étiqueté avec :
-
Ahh, I believe that is the VVIP list. for very very important people.
- 681 réponses
-
- 2
-
- 1471 rene-levesque ouest
- résidentiel
-
(et 1 en plus)
Étiqueté avec :
-
Ouvrages d'art - Antenne Rive-Sud
Kotar a répondu à un sujet de mtlurb dans Réseau express métropolitain
Probably a staging area for the work on the bridge.- 2 001 réponses
-
- 1
-
- brossard
- griffintown
-
(et 4 en plus)
Étiqueté avec :
-
ville-marie District des Brasseurs: Molson (Vision globale)
Kotar a répondu à un sujet de IluvMTL dans Propositions
LOL Dinu is off his rocker. Most of the site is 60s industrial building that most people have only seen from Notre-Dame anyway. The only part worth keeping, they are actually keeping. How can a non-profit NGO staffed mostly by retired volunteers, demand explanations from a land owner who can do what they want with the land they own. It's embarrassing that these people have a voice at all about development in this city. They should stick to tours.- 557 réponses
-
- 4
-
- acces aux berges
- faubourg molson
- (et 8 en plus)
-
That's a great price.
- 3 381 réponses
-
- brivia
- maisons de ville
-
(et 2 en plus)
Étiqueté avec :
-
Actual human scale means how the building integrates into its surroundings, and the impression that it gives on pedestrians. Is it dark and imposing, giving off a sense of impending doom, or is it set back slightly with an open atrium that makes it feel welcoming and smaller than it actually is. Human scale to developers means $50,000 more per unit. Human scale to Project Montreal means 4 floors.
-
They can call the project Americano
- 1 650 réponses
-
- 1500
- rene-levesque ouest
-
(et 2 en plus)
Étiqueté avec :
-
Support for the Habs logo would be my guess,
-
Well if this random photographer says so, it must be true!
-
Construction has been ongoing for a few weeks on the site.
- 14 réponses
-
- abords
- bois-franc
- (et 13 en plus)
-
The last section is being installed today.
-
ville-marie 151-157 rue Sainte-Catherine est - 7 étages
Kotar a répondu à un sujet de IluvMTL dans Propositions
As well, most of the reviews on google are 5 stars, but from people who have only ever reviewed one place. Likely they are fake accounts, or people are asked to leave a 5-star review for a discount on their dinner. -
It is this project.
- 3 381 réponses
-
- brivia
- maisons de ville
-
(et 2 en plus)
Étiqueté avec :
-
I think this project might start going up sooner rather than later. There are already marks all around the site where the pile driving will be.
- 1 650 réponses
-
- 1500
- rene-levesque ouest
-
(et 2 en plus)
Étiqueté avec :
-
montréal REM (ligne A) - Discussion générale
Kotar a répondu à un sujet de ChrisDVD dans Réseau express métropolitain
Just put cameras on the buses. If you're in front of them in the bus lane, $150 ticket in the mail. -
I would have been nice if they had closed Dalhousie and tried to extended the park all the way to the tracks. That would have been the perfect area to have a couple shops under the tracks.
-
It is an eyesore, but they have a great youtube ad.
- 1 650 réponses
-
- 3
-
- 1500
- rene-levesque ouest
-
(et 2 en plus)
Étiqueté avec :
-
For the project on the corner of R-L and Bleury, the thread is in the Renovation section. And no, we don't have any information on what it is.
- 1 361 réponses
-
- bleury
- de maisonneuve
- (et 6 en plus)