Recommended Posts

It's not the most beautiful project but it is going to start this week. I work with Magri's daughter and they are having the official launch and blessing of construction tomorrow May 4th. There are already 2 mechanical shovels on the sight. Great for St-Leo. 14 floors is pretty good!!

Partager ce message


Lien à poster
Partager sur d’autres sites

Dommage qu'il n'y a pas d'habitation au dessus de l'Immeuble commercial. Ça aurait une bonne façon de densifier davantage. Ne serait-ce que 4, 5 ou 6 étages supplémentaires. Et pourquoi des loyers à prix modiques pour familles ou pour personnes agées, juste au dessus d'une pharmacie...c'est idéal !

Partager ce message


Lien à poster
Partager sur d’autres sites

En effet. Ça ne fait vraiment plus de sens, ce genre de bâtisse de centre commercial de banlieue et de région éloignée. Pas à Montréal!

Partager ce message


Lien à poster
Partager sur d’autres sites

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !

Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.

Connectez-vous maintenant

  • Contenu similaire

    • Par UrbMtl
      Je ne sais pas si quelqu'un a plus d'infos, mais ce projet de Provencher Roy est fort intéressant! Un stationnement en surface de moins sur le Parc Olympique!
       
       

       

       

       

       

    • Par ErickMontreal
      *VIDÉO* La transformation du Stade Saputo
       
      (CKAC Sports) – Le début de la saison de la MLS demain à Seattle m'a donné le goût de vous mettre l'eau à la bouche pour 2012.
       
      Si l'on se fie aux propos de Don Garber hier en conférence de presse et à ceux de Richard Legendre sur nos ondes la semaine dernière, la MLS et l'Impact confirmeront l'arrivée du club dans le grand circuit d'ici peu.
       
      Dans un monde idéal, Joey Saputo aurait aimé entamer la première phase d'agrandissement du Stade Saputo cet hiver, pour ensuite pouvoir compléter avec la deuxième étape l'an prochain. Mais la bureaucratie gouvernementale a fait en sorte que le projet a été décalé d'un an.
       
      Sans avoir de confirmation que les paliers de gouvernements ont accepté de se joindre au projet de l'Impact, l'enthousiasme qui se ressent dans le discours de tous et chacun nous permet de croire que ce dossier est réglé.
       
      Après les deux phases d'agrandissements, le Stade Saputo deviendra en effet un réel stade de soccer dont le terrain de jeu sera entouré à 100% d'estrades. Ça permettra à l'Impact de pouvoir accueillir plus de 20,000 spectateurs par match, un pré requis pour la MLS.
       
      Par ailleurs, vous pouvez voir sur le vidéo que l'équipe a aussi l'intention de faire ajouter un petit abri qui viendrait couvrir les quelques rangées les plus hautes des sections extérieures du stade.
      http://www.youtube.com/watch?v=UAHIOVOOcCU&feature=player_embedded#

    • Par UrbMtl
      10 décembre 2013
       
      Merci à MTLskyline pour cette découverte :
       
      http://forum.skyscraperpage.com/showthread.php?t=146803&page=120
       
    • Par ProposMontréal
      Je ne savais pas trop où mettre ce sujet, il y a un fil sur les rénovation, mais je crois qu'il devrait avoir une catégorie complète la dessus. Alors je lance cette proposition au admin.
       
      faire revivre le Cinema V sur la rue Sherbrooke en centre culutrel.
       
      The Gazette Source
       
      There's new hope for old building, Empress Cultural Centre executive says
       
      Will we ever see a sequel to landmark movie house?
       
      Its exterior is adorned with the faces of Egyptian nobility, enshrining a grandiose Hollywood pedigree, yet the former Cinema V movie house on Sherbrooke St. and Old Orchard Ave. in Notre Dame de Grâce seems unloved these days, and even more entombed in snow that the rest of us. The art deco building, first opened in 1927 as the Empress Theatre, was last used as a cinema in 1992. Following last month's $225,000 grant from the Côte des Neiges/Notre Dame de Grâce borough, the Empress Cultural Centre, as it is now called, might become the new home to the Black Theatre Workshop and the McGill Conservatory's Community Program, part of the Schulich School of Music at McGill University. The $6.5-million project includes a 300-seat theatre, rehearsal space and two medium-size halls for music, dance and theatre lessons. If Quebec kicks in the rest of the funding, the grand reopening could be in 2010. But will it actually happen? Businessperson and microbrewer Peter McAuslan is on the board of the Empress Cultural Centre.
       
      Gazette: Why should this plan succeed any more than previous ones?
       
      McAuslan: Because we finally have credible partners like the Black Theatre Workshop and the McGill Conservatory of Music. Until now, we had raised between $200,000 and $300,000 ourselves, but that was pretty much it. Now, the city has matched it (and a technical plan for the project has been agreed upon). The Black Theatre Workshop (as a performance production company) can apply for the grant from Quebec.
       
      Gazette: Some board members really went out on a limb (at one point cashing in their RRSPs to pay some back taxes on the property). Why was it so important to them?
       
      McAuslan: It's an elegant building and it's important to Montreal. The architects (Alcide Chaussé and Emmanuel Briffa) really reflected the public's fascination with art deco and with Egypt after King Tut's tomb was discovered in the 1920s. People came there to see movies and escape the blues of the Depression. It really became part of the fabric of the N.D.G. community, even more so later with the Cinema V. It's a place in time.
       
      Gazette: Why go to so much
       
      trouble relocating cultural groups? Aren't they just fine where they are?
       
      McAuslan: There is a huge synergy when you move several cultural groups, like music and theatre, into a shared space. The crossover between the disciplines is a benefit to everyone. This is the way of the future for the arts, trying to integrate instead of staying separate. In a shared space, other (smaller) arts groups also get access they wouldn't have otherwise. There will be vernissages and spinoffs. The centre will become part of the lifeblood of the local community, and not be shaped by a massive bureaucracy. N.D.G. is a very grassroots-oriented place.
       
      Gazette: Why is it taking so long?
       
      McAuslan: There has always been money available from governments, but there is a Byzantine application process and I don't really understand it. Now, we have people (involved in the project) who do understand how the machine works. You know, the Empress has never been designated as a heritage building. It's just had some good people, including the city (which bought it in 1999 for $571,000, and granted ownership to the corporation that became the Empress Cultural Centre) looking out for it. It's taking a long time, like many other arts projects in the city. But it is grinding its way to reality.