Aller au contenu

Kotar

Membre
  • Compteur de contenus

    493
  • Inscription

  • Dernière visite

  • Jours gagnés

    3

Tout ce qui a été posté par Kotar

  1. https://ici.radio-canada.ca/nouvelle/1900820/metro-montreal-nfc-tourniquets-stm
  2. Old people don't like change, and young people don't vote.
  3. You know what they say. Measure zero times, cut zero times.
  4. Nonsense, it'll be completed right after Icône phase 2.
  5. If they excavate during the winter, they'll be ready to start pouring concrete as soon as it starts warming up again. Perfect timing.
  6. If I had to guess why it took so long, based on the history of all travaux in Montreal, this pillar was built on top of a collector-sewer or a high-pressure aqueduct, and once construction started they found that the pipe was in a worse condition than they expect, so they had to fix that first, then build the pillar.
  7. They are more or less finished the pile driving.
  8. https://en.m.wikipedia.org/wiki/Maternity_package https://www.gov.scot/news/baby-boxes-begin/
  9. Kotar

    REM de l'Est

    That makes no sense from a fleet management perspective. Why would they want to have two different sets everything. Parts, mechanics, facilities. Even if the two lines don't connect, having the same design is a benefit on almost every front. The way that the CDPQI pinches pennies, I would be flabbergasted if they were different trains.
  10. Pretty much everything east of Lapierre can/should be replaced with a higher density multi-use development.
  11. Nope, no movement as of 10 minutes ago.
  12. You can see it from the highway. Last time I passed by in May they were finishing the exterior walls
  13. From the second picture it looks like only de Maisonneuve will be closed. IMO, if they close this section on De Maisonneuve, they should close it from Clark to J-M as well.
  14. This is great densification in a mature neighborhood. Up next, Plaza Cote-Des-Neiges 🤞
×
×
  • Créer...