publicité
wellz
Membre-
Compteur de contenus
560 -
Inscription
-
Dernière visite
-
Jours gagnés
3
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par wellz
-
Yep. Service was delivered!! Sent from my SM-G920W8 using Tapatalk
-
They complain when its too short and now they complain when its too tall. Smh Sent from my SM-G920W8 using Tapatalk
- 1 297 réponses
-
- cadillac-fairview
- peel
-
(et 1 en plus)
Étiqueté avec :
-
Beautiful picture. Tellement mal placer le crystal! Sent from my SM-G920W8 using Tapatalk
-
If they say it will be 49 floors then thats what it will be. Not 44. The mechanical floors will push this to the 170m mark. Sent from my SM-G920W8 using Tapatalk
-
Ben oui on a de la fierté. Pour la langue Francaise!! Le reste en sen fou!!!
-
This render clearly shows a height more similar to 34 floors. Sent from my SM-G920W8 using Tapatalk
-
34 incluant les etages de stationements. Sent from my SM-G920W8 using Tapatalk
-
They would have to begin construction immediately for it to be ready for July 2017. Sent from my SM-G920W8 using Tapatalk
- 655 réponses
-
- maisonneuve
- mondev
-
(et 1 en plus)
Étiqueté avec :
-
Passed by yesterday and it has reached ground level. I guess we will see this one rise at roughly the same pace as YUL!
-
So we can assume that they will go ahead with the original plan of 2 170m towers. Sent from my SM-G920W8 using Tapatalk
-
Now we're talking!! Sent from my SM-G920W8 using Tapatalk
-
Looks like the project at 47 floors will be approved or has been approved. Someone has some inside information that we of course do not have.
-
ville-marie Tour Quartier des spectacles (Spectrum) - 14, 33 étages (2018)
wellz a répondu à un sujet de mtlurb dans Projets Annulés
I thought April fools was in April??!! What a joke- 1 230 réponses
-
- bureaux
- spectacles
-
(et 1 en plus)
Étiqueté avec :
-
verdun Plage de Verdun
wellz a répondu à un sujet de mtlurb dans Lieux de culture, sport et divertissement
With the 8 billion liters of sewage dumped in that river, who would dare swim in that thing??? -
Impressive. Look for construction to start spring 2016!
- 297 réponses
-
- le-sud-ouest
- résidentiel
-
(et 1 en plus)
Étiqueté avec :
-
Since January?? Jesus Christ!! How long does it take to get anything approved in this city??!!?! Ridiculous!
-
So if this tower sells out within a couple weeks, they will most likely add units and increase the height (hopefully to at least 40 floors if the height increase is approved of course), subsequently launching the second tower shortly thereafter!
-
37 stories?? Give me a break. Bump it to 40 at least!
-
Remember, they could've built to 200m on this lot. Respectable height nonetheless!
-
I agree. But whats equally absurd is how out of place the pre-fab TDC1 will look surrounded by more modern looking glass towers. Cadillac Fairview dropped the ball big time with this one!
-
My estimate is that sales will begin this fall with construction beginning spring 2016
-
July 19, 2015
- 1 652 réponses
-
Why is everybody complaining??? Are you guys kidding me?? The design is not that much different then the previous proposal aside from the CH logos. More height and more glass is what Montreal needs and all i hear is a bunch of cry babies!!! Would you have preferred another pre-fab 120m proposal??? Pathetic!!!
-
Nous temoignons Louis Boheme 2.0 sur steroides!!!
-
Le design exterieur est horrible, digne des annees '80. Pas surpris que ca se vende pas trop vite!