mcgill101
Membre-
Compteur de contenus
182 -
Inscription
-
Dernière visite
-
Jours gagnés
1
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par mcgill101
-
ville-marie Finale - 950 rue Saint-Antoine Ouest - 26 étages
mcgill101 a répondu à un sujet de GDS dans En Construction
At the street level, this one is actually quite nice. I hope the surrounding area is spruced up a bit as it becomes more populated. -
ville-marie 900, rue Saint-Jacques – 62 étages
mcgill101 a répondu à un sujet de Feanaro dans En Construction
I really like this tower compared to most of the projects being built in the city. The prefab has an interesting design, and the copper-coloured accents are quite unique amongst a sea of blue-tinted glass. It's a great addition to an otherwise barren part of downtown. -
ville-marie Le George - 45 étages
mcgill101 a répondu à un sujet de Boosterfire dans En Construction
so it's rental apartments now? How odd Missed the previous comment that mentioned this. This building has some bad juju -
Would love to see something go up on top of Hotel Espresso now
- 1 648 réponses
-
- 1
-
- 1500
- rene-levesque ouest
-
(et 2 en plus)
Étiqueté avec :
-
I have to disagree. I find these two to be absolutely hideous. Driving into Griffintown from the east, you’re confronted with a massive black wall with hodgepodge windows. At the street level, the siding on the podium is as cheap as can be and the units above the sidewalk look like prison cells. The empty space between the two towers is also very awkward, and the “art installation” on the balconies looks like something you’d find on the side of a daycare. overall, an epic failure imo.
-
montréal Infrastructures municipales - Discussion générale
mcgill101 a répondu à un sujet de IluvMTL dans Infrastructures
Oh I wasn't aware! Thanks- 400 réponses
-
- actualités
- discussion
-
(et 2 en plus)
Étiqueté avec :
-
montréal Infrastructures municipales - Discussion générale
mcgill101 a répondu à un sujet de IluvMTL dans Infrastructures
A crew was removing graffiti this morning in the tunnel that runs beneath the Ville-Marie, along Fort Street. Hopefully we start to see these teams around the city, but I won't hold my breath!- 400 réponses
-
- 4
-
- actualités
- discussion
-
(et 2 en plus)
Étiqueté avec :
-
Very Toronto-esque
- 1 215 réponses
-
- bleury
- gwl realty advisors
-
(et 1 en plus)
Étiqueté avec :
-
ville-marie Esplanade Cartier - Îlot 1 - Phase 1 & 2 - 14, 7 étages
mcgill101 a répondu à un sujet de Fortier dans En Construction
Ce quartier me rappelle Dumbo à Brooklyn. Beaucoup de potentiel dans les prochaines années !- 1 038 réponses
-
- 4
-
- pied-du-courant
- pont jacques-cartier
- (et 4 en plus)
-
FYI: Une séance d'information aura lieu le 18 mai sur le réaménagement de la place Henri-Dunant et du parc Hector-Toe-Blake Vous pouvez vous enregistrer ici: https://docs.google.com/forms/d/e/1FAIpQLSczFiWNUlre2GStS0ZTlXuiweDdED8X00N7R4YaMfQsOXn5Ew/viewform
- 1 240 réponses
-
- children’s
- hospital
-
(et 1 en plus)
Étiqueté avec :
-
ville-marie 600, De La Gauchetière (ancien siège social de la BN)
mcgill101 a répondu à un sujet de Julpyz dans Rénovations
J'ai visité les étages redessinés et ouverts avant la pandémie. Ils sont vraiment bien faits. Je suis sûr que le résultat de ce réaménagement sera à la hauteur. -
Ça ressemble à une prison avec des fenêtres
-
100% agree - not to mention.. GRAFFITI EVERYWHERE
-
The street is now ~7 lanes (the center lanes are about 1.5 wide) with fairly narrow sidewalks and a narrow median. Given this quote: “On Rene-Levesque, were giving back the equivalent of four lanes to pedestrians and cyclists. Everyone will be able to completely enjoy this new space. We will be installing a brand new transportation system. It will make the downtown core more attractive than today,” Ducharme said. I find it hard to believe that there will be space for 4 lanes of traffic, which would not be sufficient given how much traffic passes along Rene Levesque during rush hour. We should also be prepared to see every single concrete pillar covered in graffiti. The fact that they will be sealed to allow easy removal doesn't negate the fact that taggers will have a field day on these structures, and the city's and province's lack of initiative to tackle graffiti issues in other parts of the city (see the new Turcot structures) should be a major red flag to anyone who concerned with the cleanliness and appearance of our downtown core.
-
How can we fathom eliminating 4 lanes of traffic on one of the city's main thoroughfares? The impact on traffic will be disastrous. The more we focus on the architectural elements and urban integration of this project, the further away we get from (what I see as) one of the main issues with this project: we are allowing the private sector to completely disfigure a significant portion of our downtown core without any reliable data showing that it will improve mobility or reduce greenhouse gas emissions (and I would argue that even if it were to achieve those goals in any meaningful way, a 20m high concrete structure passing through downtown is hardly an acceptable reality).
-
Maybe he’s counting the underground parking 🤣🤣
-
griffintown Wellington sur le bassin - 25 étages
mcgill101 a répondu à un sujet de Fortier dans En Construction
I'm optimistic that some of the less fortunate (aka Devimco-sponsored) projects in Griffintown will look nicer once the roads are refurbished and more greenery is added to the neighborhood. I'm hoping to see more streets looking like the northern stretch of Shannon. -
Is this the area slated to be turned into a park?
-
ville-marie Le Sherbrooke - 25 étages
mcgill101 a répondu à un sujet de SonnyT31 dans En Construction
It's all family and friends who have already bought.. including Brocco themselves -
ville-marie Le Sherbrooke - 25 étages
mcgill101 a répondu à un sujet de SonnyT31 dans En Construction
FYI -
ville-marie Le Sherbrooke - 25 étages
mcgill101 a répondu à un sujet de SonnyT31 dans En Construction
The penthouse units start at 1,800+tax, plus parking. The sales launch is around Sept 22 -
griffintown Wellington sur le bassin - 25 étages
mcgill101 a répondu à un sujet de Fortier dans En Construction
A replica of the Alexander appartement buildings. Nothing but originality from Devimco 😑 -
ville-marie Le Sherbrooke - 25 étages
mcgill101 a répondu à un sujet de SonnyT31 dans En Construction
Broccolini sells a lot of their units before the pre-sale to "friends and family". It happened at L'Avenue, 628 St Jacques, and VsP... I'm curious to see how quickly the larger units are sold here as well -
Not sure if this was brought up, but it seems like a big portion of the REM extension covers areas that are already served by the green line. It's too bad that denser neighbourhoods like the Plateau and Rosemont are ignored in this plan.
-
Réfection de l’autoroute Ville-Marie
mcgill101 a répondu à un sujet de yarabundi dans Infrastructures
Ce serait géniale s'ils en profitaient pour couvrir une autre section de la Ville-Marie