Aller au contenu

Gio22

Membre
  • Compteur de contenus

    128
  • Inscription

  • Dernière visite

  • Jours gagnés

    1

Tout ce qui a été posté par Gio22

  1. Has anyone been on their website? Its terrible. I dont know if they have pictures of the current lobby or if those are renderings but they're absolutely ugly. This project has zero marketing what so ever. The "renovated" part is not fully renovated, from the pictures the floors are old as hell, ugly white appliances, and the windows and doors like so damn cheap! Its better off some developer buy this building, demolish it and build a proper high rise, not a half-fast attempt like this.
  2. The way the metal studs are framed, it seems theyre going to install a door, so there will be balconies.
  3. do we have any news on what this project will be? really hoping for a hotel
  4. YES YES YES!!!!! I am so excited for this and other projects going up. When the high-rises like TDC, avenue. YUL, holiday-inn and other around the bell centre started to go up, I thought to myself this is it, the area is gonna be amazing. Now, there is centra condos that will go up, 1020 de la montagne, enticy condos, Dorchester apartments, quad Windsor, and TDC 2 and 3 going up. This area will truly be amazing, I am beyond excited
  5. Anyone know how many floors? Or what they're building?
  6. does anyone know what will happen to the current CBC building once the new one is complete?
  7. YUL phase 2, TDC 2 and 3 are going up, 1000 de la montagne will begin shortly, and hopefully soon 1175 Mackay and Enticy. Work is being done on streets and sidewalks in the area, the area is getting better and better so for me I hope its 1500RL next.
  8. I think what really bothers me is that CF had a great original design for 750 peel, 150 and 180m resprectively and the overall building was different, curvey and circular, very unique, not like any other in Montreal. They downscaled to 120m, its ok i understand but they changed the design to 2 square boxes. Its not diffrent, it is simply boaring and too generic. Thats what bothers me the most. Hopefullly they can get it right with the 3 towers at 600 peel. If one tower is 200m and the other 180m and the third 150m, i think i can forgive them
  9. I'd imagine theyre waiting for the conpletion of centra condos across the street to begin since the construction reduces mckay to one lane near RL
  10. Dissapointed in the height, they could have built between 30-35 floors on RL. That being said I am happy that RL will be another highrise (even if it is a small one)
  11. Victoria sur le parc, new BN building, centra condos phase 4, TDC 2 and 3, quad Windsor, 1500RL. Montreal is on fire, bring on more high-rises!!!!
  12. Give it time, some developer will see how fast the area has developed and that there is no signs of slowing down
  13. Really sucks that there is still no news on the project. Im so excited to see when this and 1000 de la montage begin construction, the area will be amazing
  14. Past by their sales office today. They just installed windows, also at the centre left of the picture, stairs have been erected, wonder if it is for the future job site?
  15. Work is being done on avenue des canadiens de montreal between de la montagne and stanley. Wonder if it is the proposed pedestrian walkway that was planned.
  16. Whats strange is that if you go on their website (quadwindsor.com), they still show the old design with two office buildings at 150 and 180m each. They also show another condo between TDC2 and TDC3. But when you go on the website of TDC3 it shows the current design. I find it hard to believe that cadillac farview doesnt update their website on a project of this magnitude. Or maybe were in for some sort of suprise, which i believe were all hoping for.
  17. Very surprised how fast they excavated, I wouldn't be surprised if its completed ahead of schedule
  18. Spring ends officially Thursday June 21st, so I guess they have until them to have the launch party
  19. Its a shame this project wont see the light of day, it would have been something special
  20. My idea would be to improve the area around Gare centrale (shown in red). My vision would be to gare centrale on Saint-Antoine and the corner Mansfield and Robert-Bourassa (shown in blue). I think the building should be in the same styles as Toronto's union station and NYC Grand Central (neoclassical and beaux-arts style of architecture). Additionally I am not a fan of Place Bonaventure, I think its really dated and out of place. My vision would be to have two twin towers on the lot (similar to Time Warner center in NYC), connected by a two or three floor atrium that would have restaurants and stores. In doing that it would eliminate that horrible underpass on Saint-Antoine. I know my idea is not perfect but given all the developments near the Bell Centre and on Robert Bourassa near Tour de la Bourse, I think it would really complete our skyline and would be able to add more high-rises where the current Gare Centrale is. Would love to know everyone's vision for the area.
  21. Hopefully the promoters release new information soon. I really hope that the building height surpasses 150m. Having another 170-180m building in that area would have a great visual impact on the skyline.
  22. Hi all, I am new to this site and recently joined. Please forgive me if I'm doing this wrong. New renderings of the tower have been posted on their website and in my opinion it looks amazing. http://www.centracondos.com/ Btw I been navigating this site for a while and I really love it, really cool how you can see proposed and approved projects across Montreal. Hope I'll be able to contribute
×
×
  • Créer...