Aller au contenu
publicité

IluvMTL

Membre
  • Compteur de contenus

    13 162
  • Inscription

  • Dernière visite

  • Jours gagnés

    21

Messages posté(e)s par IluvMTL

  1. http://onsomesite.com/journal/2011/12/20/montreals-most-expensive-apartment.html

     

    Heard this on the news. See the link for all the pics.

     

     

    ''Everyone complains about expensive leases and prices in the Plateau of Montreal, well this listing is no exception. Behind the Sir Mortimer B. Davis YHMA building, on 200-265 Mont-Royal avenue, a 6313 square foot palace stays camouflaged. Heated floors, 14'' high ceilings, view on the Jeanne-Mance park and Mount-Royal, and if those specs weren't enough, the apartment also comes with a 25meter long swimming pool (half Olympic size). The owner has listed the property at a generous price tag of $5.9M. The prestigious firm, Sotheby, holds the listing. What are your thoughts?''

     

    montreal%20most%20expensive%20apartment%2020.png?__SQUARESPACE_CACHEVERSION=1324317542989

  2. http://www.cyberpresse.ca/actualites/regional/montreal/201112/21/01-4480039-quebec-autorise-la-demolition-des-edifices-du-red-light.php

     

    Karim Benessaieh

    La Presse

     

    Les jours sont comptés pour les édifices délabrés du boulevard Saint-Laurent, entre le Monument-National et le Café Cléopâtre: Québec a autorisé leur démolition mercredi matin.

     

    Le ministère de la Culture y met essentiellement deux conditions. Les pierres de la façade devront être démontées une à une, numérotées, entreposées et réutilisées pour un projet futur de leur propriétaire, la Société de développement Angus (SDA). Les travaux ne devront en aucun cas «fragiliser la structure du Monument-National qui, comme vous le savez, est un monument historique», a précisé la porte-parole Annie LeGruiec.

     

    La décision de la ministre Christine Saint-Pierre a été communiquée plus tôt dans la journée à l'arrondissement Ville-Marie, qui en a avisé la SDA.

     

    «Un devis détaillé décrivant clairement la méthode de démolition des bâtiments (...) devra être réalisé par un architecte spécialisé en conservation des bâtiments anciens, appuyé au besoin par un ingénieur en structures», a précisé l'arrondissement par communiqué.

     

    Tous les devis et relevés devront être approuvés avant les travaux. La SDA, devenue Gestion Saint-Laurent Angus, a l'obligation de compléter les travaux d'ici trois mois.

     

    Deux édifices échapperont au pic des démolisseurs. Celui qui est le voisin direct du Monument-National, à l'adresse civique 1186-1188 - qui n'est en fait qu'une façade consolidée par des barres de métal - restera là. L'autre édifice sauvegardé est à l'angle du boulevard Saint-Laurent et Sainte-Catherine, au nord du Café Cléopâtre, à l'adresse 1246-1250. C'est le seul qui ait été entretenu depuis deux ans: il abrite le bureau de chantier du 2-22, construit en face.

     

    Les autres édifices, du 1190 au 1220 Saint-Laurent, avaient été achetés début 2010 par la Société de développement Angus, au coût de 7 millions, dans le cadre d'un projet élaboré par la Ville de Montréal, le Quadrilatère Saint-Laurent. Le projet est tombé à l'eau en mai dernier, devant le refus du propriétaire du Café Cléopâtre d'être exproprié.

     

    Abandonnés depuis deux ans, sans chauffage, les édifices tombaient littéralement en ruine et ont été graduellement condamnés. Le Monument-National, comme la rapportait La Presse ce matin, s'était par ailleurs plaint des problèmes d'humidité au sous-sol, des risques d'infiltration et des désagréments causés à sa clientèle par le périmètre érigé depuis trois semaines.

     

    Ce périmètre, érigé le 2 décembre dernier à la suite de rapports alarmants, sera maintenu «jusqu'à nouvel ordre», précise l'arrondissement. Une partie du trottoir et une voie sur le boulevard Saint-Laurent resteront fermés, tout comme la rue Clark, à l'arrière des édifices délabrés.

  3. http://www.newsinenglish.no/2011/12/19/very-difficult-to-film-in-norway/

     

    A top American film director has advised his fellow director Martin Scorsese against trying to make a new film based on Jo Nesbø’s crime novel Snømannen entirely on location in Norway. Norwegian officials aren’t pleased.

     

    David Fincher, who has won Oscar nominations for his direction of films including The Social Network, told newspaper Aftenposten that he had a difficult and expensive experience trying to film scenes in Norway himself. Fincher has directed the new US version of the Swedish crime novel Menn som hater kvinnor (“Men who hate women,” but called The Girl with the Dragon Tattoo in English) and ran into challenges while filming a scene at Oslo’s main airport at Gardermoen.

     

    “It was incredibly difficult to get permission to set up a camera,” Fincher told Aftenposten. “It was very expensive, too.” He thinks Montreal could be an alternative filming location for Scorsese’s version of “The Snowman.

  4. http://www.cyberpresse.ca/actualites/regional/montreal/201112/20/01-4479788-des-edifices-voisins-en-decrepitude-menacent-le-monument-national.php?utm_categorieinterne=trafficdrivers&utm_contenuinterne=cyberpresse_B4_manchettes_231_accueil_POS2

     

     

    Karim Benessaieh

    La Presse

     

    À l'abandon depuis deux ans, des édifices du Red Light montréalais, boulevard Saint-Laurent, sont devenus de véritables nuisances pour leurs voisins, notamment le Monument-National. Classé monument historique, l'édifice est aux prises avec des problèmes d'humidité dans son sous-sol, des dangers d'infiltration du toit dans un de ses murs, en plus de voir ses spectateurs et employés dérangés par la fermeture d'une partie du boulevard Saint-Laurent.

     

    Le Monument-National appartient depuis 1971 à l'École nationale de théâtre du Canada, qui s'est dite «extrêmement préoccupée par la situation des immeubles» délabrés situés entre son édifice et le Café Cléopâtre, dans une correspondance obtenue par La Presse. Les responsables de l'École se sont plaints à plusieurs reprises des «inconvénients reliés à l'inoccupation» et des «risques de certains [des] immeubles». Le 12 décembre dernier, ils ont reçu l'appui d'Héritage Montréal, qui a souligné le «regrettable état d'abandon dans lequel [le secteur] se trouve actuellement, faute d'entretien», dans une lettre envoyée au maire Gérald Tremblay.

     

    Un monument historique

     

    Ces bâtiments sont dans l'aire de protection du Monument-National et font partie d'un secteur de valeur patrimoniale exceptionnelle, souligne Dinu Bumbaru, directeur des politiques d'Héritage Montréal. De style néo-Renaissance, l'édifice terminé en 1894 a été classé monument historique en 1976. Une aire de protection a été décrétée deux ans plus tard.

     

    Les neuf immeubles compris dans cette aire ont été acquis par la Société de développement Angus (SDA), avec l'appui de la Ville de Montréal, entre janvier et mars 2010 pour 18,6 millions. Un grand édifice de 12 étages, abritant notamment les bureaux d'Hydro-Québec, devait les remplacer dans le cadre du projet Quadrilatère Saint-Laurent. Celui-ci est officiellement tombé à l'eau en mai dernier, devant le refus du propriétaire du Café Cléopâtre d'être exproprié. La SDA compte présenter une deuxième mouture du projet, laquelle fera l'objet d'une nouvelle consultation publique.

     

    Dégradation évidente

     

    En attendant, les immeubles ne sont plus chauffés et subissent une dégradation évidente. Un seul segment abritant le bureau de chantier du 2-22, angle Saint-Laurent et Sainte-Catherine, est encore entretenu. Les fenêtres des édifices ont toutes été condamnées, une structure métallique d'appui a été ajoutée à une des façades et du grillage retient la brique à l'arrière, rue Clark, où une partie du trottoir est fermée.

     

    Le 19 août dernier, dans un courriel, un responsable de Technopôle Angus a pris acte des plaintes de l'École nationale de théâtre, se disant «navré» de cette situation. «Mais la solution pour résoudre ce problème ne relève pas de nos pouvoirs [...], écrit-il. Le sous-sol de notre immeuble n'est plus chauffé ni ventilé, votre mur de fondation subit une différence de température [votre loge étant chauffée] et il y a condensation quelque part à mi-chemin.» Il suggère d'isoler le mur du Monument-National avec de la mousse uréthane afin de le sceller hermétiquement, pour empêcher la condensation. Un joint à la jonction des deux façades aurait par ailleurs été installé à la fin du mois d'août pour empêcher les infiltrations.

     

    Il n'a pas été possible de joindre la direction du Monument-National, dont les bureaux sont fermés durant le temps des Fêtes.

     

    Autorités en alerte

     

    Le 2 décembre dernier, après avoir reçu des rapports d'inspection inquiétants, l'arrondissement de Ville-Marie a ordonné la mise en place d'un périmètre de sécurité devant et derrière les bâtiments, du Monument-National au Café Cléopâtre. Une voie sur deux du boulevard Saint-Laurent a été fermée à la circulation. Lors du passage de La Presse, un employé du Service de sécurité incendie (SSIM) prenait des photos des édifices, qui présentent un risque élevé d'incendie.

     

    Invité à expliquer la situation, le président de la Société de développement Angus, Christian Yaccarini, a décliné l'offre. «Il n'y aura aucun commentaire à qui que ce soit, puisque nous attendons les instructions de l'arrondissement de Ville-Marie», a-t-il déclaré par l'intermédiaire de sa secrétaire.

     

    À l'arrondissement, on explique que trois rapports décrivant l'état des bâtiments - rédigés par le SSIM ainsi que deux firmes d'ingénieurs mandatées par la SDA et l'arrondissement - ont été envoyés à Québec. «Nous attendons les orientations du ministère de la Culture avant de nous prononcer sur le sort réservé aux bâtiments», a déclaré Anik De Repentigny, porte-parole.

     

    Démantèlement des façades

     

    Hier, Radio-Canada a révélé que la Ville de Montréal envisageait de démanteler les façades des immeubles à l'abandon. Les pierres seraient numérotées et pourraient être réutilisées pour un éventuel projet de la SDA. Le ministère de la Culture doit donner son approbation, ce que la responsable du patrimoine au comité exécutif de la Ville, Helen Fotopulos, espère obtenir d'ici à la fin de l'année.

     

    Au Ministère, on se dit préoccupé par la protection du Monument-National et «également sensible à la situation actuelle, qui représente un risque pour la sécurité civile», indique la porte-parole Annie LeGruiec. «Nous étudions présentement la demande et ferons connaître notre position dans les meilleurs délais.»

  5. http://www.ledevoir.com/politique/montreal/338881/la-gare-viger-serait-revendue

     

    Joint par Le Devoir, Phil O'Brien a précisé que le coût d'achat de la gare Viger avoisinerait les 30 millions, mais il n'a pas voulu dévoiler l'identité des investisseurs avec qui il menait des négociations. Il soutient détenir des preuves que 42 millions ont bel et bien ont été dépensés sur le site, notamment pour retirer l'amiante du bâtiment.

     

    Lorsque la transaction sera conclue, un projet hôtelier d'environ 400 millions de même nature que le précédent sera mis sur les rails. Outre l'hôtel, le projet comportera des commerces, des bureaux et de l'habitation répartis dans plusieurs nouveaux bâtiments d'une hauteur maximale de 18 étages, a indiqué M. O'Brien.

     

    Quant à la transaction de 2005, il affirme qu'elle s'est faite dans les règles. «Il n'y a pas de faveur qui a été faite par le maire pour l'achat du terrain. On aurait dû payer moins cher que ça parce le terrain est contaminé avec des huiles souterraines», a soutenu M. O'Brien.

     

    L'homme d'affaires affirme avoir perdu des sommes importantes dans le projet de la gare Viger jusqu'à maintenant. «Je ne fais pas ça pour les récupérer», a-t-il dit.

  6. http://ville.montreal.qc.ca/portal/page?_pageid=7317,80081586&_dad=portal&_schema=PORTAL&id=3179&ret=/pls/portal/url/page/arrond_vma_fr/rep_annonces/rep_actualites/detail_actualite

     

    60 partenaires imaginent une vision d'aménagement pour le pôle du Quartier latin. Et vous, qu'en pensez-vous ?

     

    20 décembre 2011

     

    Au début du mois de décembre, les acteurs des milieux économique, communautaire, résidentiel et culturel se sont réunis pour exprimer leur vision, leurs idées et leurs priorités d'action pour l'aménagement futur du pôle du Quartier latin du Quartier des spectacles.

     

    En lien avec la démarche participative lancée par l'arrondissement de Ville-Marie au mois de novembre dernier, cette rencontre fructueuse a permis de recueillir les idées des partenaires du milieu, et de leur donner l'occasion d'échanger et d'imaginer une vision commune et spécifique pour le quartier.

     

    En continuité avec la vision du Quartier des spectacles « Vivre, créer, se divertir », les participants se sont exprimés :

     

    «

    — On devrait vivre le Quartier latin en deux temps - deux saisons ! Avoir une économie de nuit !

    — Le quartier devrait rimer avec convivialité. Faisons une coulée verte, aménageons nos ruelles, créons des parcours urbains !

    — Et pourquoi ne pas réaliser un monorail qui ferait le tour du quartier ?

    — Ou peut-être mettre en place un concours de design pour des nouveaux supports à vélo ?

    — Moi, je vois La Bohème comme une signature pour le quartier ! Une expérience authentique et conviviale ... un lieu de rencontres pour échanger et refaire le monde.

    »

     

    Rappelons que le Quartier latin, c'est 6 000 résidants, 46 000 étudiants et 10 millions de personnes qui fréquentent annuellement le lieu. Au début de l'année 2012, des ateliers de design urbain permettront à tous les Montréalais de s'exprimer sur leurs attentes et leurs aspirations du futur quartier.

     

    En attendant, continuez à découvrir le quartier et à partager vos idées :

     

    facebook.com/polequartierlatin

    partagetonidee.info

  7. http://ville.montreal.qc.ca/documents/Adi_Public/CM/CM_ODJ_ORDI_2011-12-19_14h00_FR.pdf

     

    ASSEMBLÉE ORDINAIRE DU CONSEIL MUNICIPAL- lundi 19 décembre 2011

     

    20.25 Concertation des arrondissements et ressources matérielles , Direction stratégies et transactions immobilières - 1114962008

    Prendre connaissance du rapport de la Commission permanente sur l'examen des contrats

     

    Approuver le projet d'acte par lequel la Ville acquiert de la Société d'habitation et de développement de Montréal un terrain d'une superficie de 1 588 mètres carrés, situé au nordouest des rues Ste-Catherine Ouest et Clark, dans l'arrondissement de Ville-Marie - Dépense totale de 2 733 306 $, plus les taxes applicables

     

    Compétence d’agglomération :

    Annexe du décret - Aménagement et réaménagement du domaine public, y compris les travaux d'infrastructures, dans un secteur de l'agglomération désigné comme le centre-ville

  8. Un funiculaire avec une plateforme d'observation sur le centre-ville à coté du tablier du Pont ! La vue sera magnifique!

     

    Il y a certainement assez d'espace non-utilisé sous le Pont pour construire une station d'embarquement. Ça pourra devenir un attrait touristique et animer les abords du Pont, et ce à 2 pas du Métro Papineau.

     

    L’arrondissement va prolonger la piste-cyclable de la rue de Maisonneuve jusqu'à là l'année prochaine. Alors une station d'embarquement au niveau de la rue Sainte-Catherine sera entre les 2 pistes cyclables.

  9. C'est un développement résidentiel de grand envergure, à un taille rarement vu pour pour un quartier du centre-ville (un peu comme les démolitions qui ont fait place à ces structures (la SRC et l'autoroute Ville-Marie) mais à l'inverse. Le processus des consultations à l'OCPM sont choses du passé, alors procédons correctement.

     

    Il a été mentionné que le fait que la Campus de la Santé se trouve un peu à l'ouest du site et les personnes qui travailleront eventuellement dans ce complexe pourront être intéresser à vivre dans des résidences sur les terrains de la SRC. L'ajout de la densité dans la partie est du site (près de la rue Papineau) aura des effets positifs pas seulement sur les services commerciales de la rue Sainte-Catherine, mais aussi sur les abords à l'est du Pont. Je pense à l'immense îlot Delorimier, s'il n'est pas développé avant. Les abords du Pont sont des coins plus difficile à animer, alors des grands projets comme ceci sont des excellentes stratégies. Il faut aussi espérer que les abords du fleuve un peu au sud seront (un jour) plus accessible aux citoyens.

     

    Ce projet échelonnera sur plusieurs années. La date limite pour soumettre des réponses était hier, alors espérons avoir des nouvelles des suites du processus dans les prochaines mois.

     

    presentation_radio_canada.jpg?1271008580

    http://ocpm.qc.ca/consultations-publiques/projet-de-developpement-de-la-maison-de-radio-canada

  10. http://www.pppcouncil.ca/pdf/cbc_redevelopment_rfi_112011.PDF

     

    CBC/RadioCanada

    Potential P3 / Development Opportunity

    For the Montreal Broadcast Facility

     

    CBC/Radio‐Canada has issued a Request for Information to seek input and information from interested consortia or real estate developers to assess the viability, interest and scope of the potential redevelopment project of the Maison de Radio‐Canada, a property comprised of buildings and land, owned by CBC/Radio‐Canada and located in downtown Montréal, Québec, at 1400 René‐Lévesque Boulevard East (“MRC”). The RFI aims to:

     

     Assist and inform the decision‐making in evaluating the overall viability of the project;

     Gauge the level of interest in the marketplace in the business opportunity presented by the potential redevelopment for both the project and financing options;

     Obtain feedback on the redevelopment of the site;

     Obtain an understanding of the challenges and issues associated with the site;

     Assess the potential for shared use of the CBC/Radio‐Canada production facilities;

     Determine interest for complementary development options or services;

     Obtain and/or validate market trends; and  Refine processes, project scope, deal structure and timne.

     

    The key highlights of the development are:

     CBC is seeking to upgrade its operations with up‐todate broadcast and production facilities and new

    office space, through a transaction that would see a mixed‐use development on its property located at the corner of René‐Lévesque Boulevard and Papineau Street;

     The close proximity to other production companies

    provides a unique opportunity to leverage the highly technical production environment;

     Walking distances from the metro green line (Beaudry and Papineau stations), the property has

    easy and direct highway access to the Ville‐Marie Expressway;

     The current zoning provides for 705,000 sq.ft. of land available for development to accommodate density of approximately 4,135,000 sq.ft.;

     Due to its proximity to the Centre Hospitalier Universitaire de Montréal (CHUM), a developer could leverage the municipal objective of bringing residential space closer to where people work;

     In close proximity to cultural venues, this property provides potential development uses such as high‐density residential,retail and office space;

     As a Crown Corporation, CBC/Radio‐Canada is ideally suited to be an anchor tenant, because of its high credit rating; and

     The debt‐free property provides a range of possible financing arrangements.

     

    The project could also include the redevelopment of CBC/Radio‐Canada’s current facilities which are not conducive to the flexibility required by the Corporation for both technical and office space requirements. The significant upgrade which is required to meet CBC/Radio‐Canada’s existing, emerging and future needs and provide it with the ability to evolve in the new world of media, could be done through a new construction on the existing site or a major retrofit of the current space. The key objectives related to the redevelopment are to minimize the cost of occupancy while meeting the operational needs; integrate leading practices in technology and work environments and provide a vibrant supportive environment to CBC/Radio‐Canada’s employees.

     

    CBC/Radio‐Canada is looking forward to receiving feedback on the potential opportunity through the Request for Information which is posted on Merx under the following reference number: 231 386. For additional information about the RFI, interested parties can also contact the MRC Project Manager (Real Estate Services) at: info.site@radio‐canada.ca

     

    Une version française est disponible en faisant la demande à l’adresse courriel cidessus.

  11. http://www.merx.com/French/SUPPLIER_Menu.Asp?WCE=Show&TAB=1&PORTAL=MERX&State=7&id=231386&src=osr&FED_ONLY=0&ACTION=&rowcount=&lastpage=&MoreResults=&PUBSORT=0&CLOSESORT=0&IS_SME=Y&langswitch=0&hcode=6T%2bJ666Fz0fbMuM3pkfoqw%3d%3d

     

    Publié 2011-11-07

    Fermeture 2011-12-16 00:00 h heure normale de l'Est HNE

     

    Description de l'avis d'appel d'offres

    Pour le redéveloppement du site de la Maison de Radio-Canada, Montréal, Québec

     

    VEUILLEZ PRENDRE NOTE QUE L’AVIS (# 230706) A ÉTÉ ANNULÉ ET REMPLACÉ PAR L’AVIS SUIVANT (# 231386) POUR PERMETTRE UNE PROLONGATION DANS L’ÉCHÉANCIER.

     

    CBC/Radio-Canada invite les membres de l’industrie à répondre à sa Demande d'Information (« DI ») pour le redéveloppement du site de la Maison de Radio-Canada, Montréal, Québec (DI # RE_MRC20111028 / Redéveloppement MRC)

     

    1. OBJECTIF :

     

    Le principal objectif de la présente demande d’information (« DI ») consiste à rechercher sur le marché des informations provenant de parties intéressées c’est-à-dire de consortiums, de promoteurs immobiliers ou d’entreprises actives soit en mise en valeur immobilière, en financement de mise en valeur immobilière, en livraison de projets privilégiant l’approche conception-construction-financement-entretien-exploitation (CCFEE), en construction ou en exploitation immobilière et en gestion d’immeubles (les « répondants ») pour évaluer la viabilité, l’intérêt et la portée du projet de redéveloppement potentiel de la Maison de Radio-Canada, une propriété composée de bâtiments et de terrains, appartenant à CBC/Radio-Canada et située au centre-ville de Montréal (Québec), au 1400, boul. René-Lévesque Est (la « MRC »).

     

    Plus précisément, la DI vise à :

    • soutenir et éclairer la prise de décision dans l’évaluation de la viabilité globale du projet;

    • évaluer le degré d’intérêt du marché pour l’occasion d’affaires présentée par le redéveloppement potentiel, du point de vue du projet et des options de financement;

    • obtenir une rétroaction sur le redéveloppement du site;

    • comprendre les défis et les enjeux associés au site;

    • évaluer la possibilité d’une utilisation partagée des installations de production de CBC/Radio-Canada;

    • évaluer l’intérêt pour des options de développement ou des services complémentaires;

    • obtenir et/ou valider les tendances du marché; et

    • mieux définir les processus, la portée du projet, la structure de l’entente et l’échéancier.

     

     

    2. ÉCHÉANCIER:

     

    L’échéancier applicable à la présente DI est le suivant :

     

    • Date d’émission de la DI: 28 octobre 2011

     

    • Date d’amendement: 4 novembre 2011

     

    • Séance d’information non-obligatoire (y compris visite du site): 16 novembre 2011 de 10 h à 12 h (HNE)

     

    • Date suggérée pour l’inscription aux réunions commerciales confidentielles (RCC) facultatives et réception de l’entente de non-divulgation signée par les répondants qualifiés: 17 novembre 2011

     

    • Période des RCC: du 17 novembre au 5 décembre 2011

     

    • Date limite pour soumettre des questions: 5 décembre 2011

     

    • Date limite pour envoyer les réponses aux questions soulevées par les répondants: 9 décembre 2011

     

    • Date limite pour soumettre les réponses: 16 décembre 2011

     

    3. POUR OBTENIR UN EXEMPLAIRE DE LA DI

     

    Le répondant doit inclure les coordonnées complètes de la personne qui sera, aux fins de la présente DI, le seul point de contact dans son organisation :

     

    3.1 Dénomination sociale du soumissionnaire;

    3.2 Nom de la personne-ressource;

    3.3 Titre;

    3.4 Adresse (rue, ville, province/État, pays, code postal);

    3.5 Numéro de téléphone;

    3.6 Numéro de télécopieur;

    3.7 Numéro de cellulaire

    3.8 Adresse de courriel;

    3.9 Adresse du site web.

     

    4. COMMUNICATION AVEC CBC/RADIO-CANADA

     

    Le répondant doit communiquer avec CBC/Radio-Canada par courriel seulement. Les messages concernant la présente DI seront adressés aux coordonnées précisées ci-dessous. Tous les courriels portant sur la présente DI doivent préciser le numéro de référence de la DI (DI # RE_MRC20111028 Redéveloppement MRC) en objet du message.

     

    Directeur de projet MRC – Services immobiliers

    DI # RE_MRC20111028 Redéveloppement MRC

    CBC/Radio-Canada

    Courriel : info.site@radio-canada.ca

     

    5. RÉCEPTION DES RÉPONSES

     

    Les Réponses à la présente DI doivent être remises au plus tard le 16 décembre 2011.

  12. C'est peut-être le projet d'expansion de la Station des Sports sur Ste-Catherine.

     

    Station des Sports et Sports Direct : 862 A, rue Sainte-Catherine Est

     

    - 10 000 pieds carrés

     

    - Foyer

     

    - 125 écrans plats au plasma

     

    http://www.montreal.tv/portail/blog/2011/04/andrei-kostitsyn-la-station-des-sports/

     

     

    À la recherche d'info : je passais devant le Séville au début de la semaine pour me rendre au Marché P.A. (marché situé sur la rue du Fort) situé juste au nord de la rue Sainte-Catherine - j'ai constaté que l'on creuse un énorme trou juste au sud du marché, est-ce qu'il y a de l'info sur ce site qui est surement en voie de construction. Aussi sur le côté sud de la Place Alexis Nihon (sur Ste-Catherine encore) il y a une grue .... pour ?????????????????????????
  13. http://communiques.gouv.qc.ca/gouvqc/communiques/GPQF/Decembre2011/16/c7546.html

     

    École de santé publique de l'Université de Montréal - Québec annonce la première phase du Campus de santé publique Norman-Bethune

     

    MONTRÉAL, le 16 déc. 2011 /CNW Telbec/ - La ministre responsable de l'Administration gouvernementale et présidente du Conseil du trésor, Mme Michelle Courchesne, et la vice-première ministre et ministre de l'Éducation, du Loisir et du Sport, Mme Line Beauchamp, ont annoncé aujourd'hui la création du Campus de santé publique Norman-Bethune dont la première phase sera la construction de l'École de santé publique de l'Université de Montréal (ESPUM). À cette occasion, elles étaient accompagnées du maire de Montréal, M. Gérald Tremblay, de l'ancien premier ministre du Québec et président du conseil d'administration du Quartier de la santé de Montréal (QSM), Me Pierre Marc Johnson, du recteur de l'Université de Montréal, le Dr Guy Breton, et de la chancelière de l'Université de Montréal, Mme Louise Roy.

     

    « Nous annonçons aujourd'hui la réalisation d'un projet structurant et porteur qui se situe au point de convergence de deux des missions les plus fondamentales de l'État, la santé et l'éducation. Avec ce projet de développement économique et social, c'est tout le secteur qui bénéficiera du flot quotidien de plus d'un millier de chercheurs et étudiants œuvrant dans les domaines de la santé et de l'éducation. En sus des investissements sans précédent réalisés dans les centres hospitaliers universitaires, ce projet positionne encore plus fortement Montréal comme l'un des leaders mondiaux en science de la vie », a déclaré la ministre Courchesne.

     

    « Nous avons des défis majeurs à relever en matière de formation et de recherche dans le domaine de la santé publique, des défis qui demandent que soient tissés des liens solides entre le réseau de la santé et le milieu de l'enseignement. Une école comme l'ESPUM constitue à cet égard un atout majeur et l'on ne peut douter que son intégration au Campus de santé publique Norman-Bethune fera d'elle la plus grande école de santé publique en Amérique du Nord », a souligné la ministre Beauchamp.

     

    La création du campus, situé au coin de la rue Berri et du boulevard de Maisonneuve à proximité du nouveau CHUM et de son Centre de recherche, concentrera en un lieu les principales institutions actives en santé publique. Pour le ministre de la Santé et des Services sociaux, le Dr Yves Bolduc : « cette réunion permettra de favoriser les échanges d'expertise, d'améliorer la cohérence des actions et de faciliter la réalisation de projets communs tournés vers l'amélioration de la santé de nos populations et la prévention des maladies ». Le campus sera complété lors d'une phase subséquente avec l'accueil de l'Institut national de santé publique du Québec et de la Direction de la santé publique de l'Agence de la santé et des services sociaux de Montréal.

     

    Avec son expertise en santé publique, l'Université de Montréal agira à titre de locomotive du projet. À cet effet, le gouvernement du Québec a mandaté l'institution pour la réalisation du dossier d'affaires, et ce, conformément à la Politique-cadre sur la gouvernance des grands projets d'infrastructure publique. Le Quartier de la santé de Montréal participera à l'élaboration du dossier d'affaires, le tout sous la supervision d'Infrastructure Québec.

     

    De plus, la ministre Courchesne a annoncé qu'au cours des prochaines semaines, la Société immobilière du Québec ira en appel d'offres pour vendre la nouvelle gare d'autobus et l'entreprise qui en assure la gestion, ainsi que les structures inachevées de la portion Nord de l'îlot Voyageur. Le gouvernement s'assurera que les offres retenues soient conformes à la valorisation d'un site qui présente de nombreuses possibilités d'investissements en matière de transport collectif et de développement institutionnel, résidentiel ou commercial.

     

    Avec l'annonce d'aujourd'hui, le gouvernement du Québec pose un geste concret dans sa volonté d'assurer son leadership en matière de sciences de la vie et de revitaliser ce quadrilatère de Montréal.

  14. http://communiques.gouv.qc.ca/gouvqc/communiques/GPQF/Decembre2011/16/c7546.html

     

    École de santé publique de l'Université de Montréal - Québec annonce la première phase du Campus de santé publique Norman-Bethune

     

    MONTRÉAL, le 16 déc. 2011 /CNW Telbec/ - La ministre responsable de l'Administration gouvernementale et présidente du Conseil du trésor, Mme Michelle Courchesne, et la vice-première ministre et ministre de l'Éducation, du Loisir et du Sport, Mme Line Beauchamp, ont annoncé aujourd'hui la création du Campus de santé publique Norman-Bethune dont la première phase sera la construction de l'École de santé publique de l'Université de Montréal (ESPUM). À cette occasion, elles étaient accompagnées du maire de Montréal, M. Gérald Tremblay, de l'ancien premier ministre du Québec et président du conseil d'administration du Quartier de la santé de Montréal (QSM), Me Pierre Marc Johnson, du recteur de l'Université de Montréal, le Dr Guy Breton, et de la chancelière de l'Université de Montréal, Mme Louise Roy.

     

    « Nous annonçons aujourd'hui la réalisation d'un projet structurant et porteur qui se situe au point de convergence de deux des missions les plus fondamentales de l'État, la santé et l'éducation. Avec ce projet de développement économique et social, c'est tout le secteur qui bénéficiera du flot quotidien de plus d'un millier de chercheurs et étudiants œuvrant dans les domaines de la santé et de l'éducation. En sus des investissements sans précédent réalisés dans les centres hospitaliers universitaires, ce projet positionne encore plus fortement Montréal comme l'un des leaders mondiaux en science de la vie », a déclaré la ministre Courchesne.

     

    « Nous avons des défis majeurs à relever en matière de formation et de recherche dans le domaine de la santé publique, des défis qui demandent que soient tissés des liens solides entre le réseau de la santé et le milieu de l'enseignement. Une école comme l'ESPUM constitue à cet égard un atout majeur et l'on ne peut douter que son intégration au Campus de santé publique Norman-Bethune fera d'elle la plus grande école de santé publique en Amérique du Nord », a souligné la ministre Beauchamp.

     

    La création du campus, situé au coin de la rue Berri et du boulevard de Maisonneuve à proximité du nouveau CHUM et de son Centre de recherche, concentrera en un lieu les principales institutions actives en santé publique. Pour le ministre de la Santé et des Services sociaux, le Dr Yves Bolduc : « cette réunion permettra de favoriser les échanges d'expertise, d'améliorer la cohérence des actions et de faciliter la réalisation de projets communs tournés vers l'amélioration de la santé de nos populations et la prévention des maladies ». Le campus sera complété lors d'une phase subséquente avec l'accueil de l'Institut national de santé publique du Québec et de la Direction de la santé publique de l'Agence de la santé et des services sociaux de Montréal.

     

    Avec son expertise en santé publique, l'Université de Montréal agira à titre de locomotive du projet. À cet effet, le gouvernement du Québec a mandaté l'institution pour la réalisation du dossier d'affaires, et ce, conformément à la Politique-cadre sur la gouvernance des grands projets d'infrastructure publique. Le Quartier de la santé de Montréal participera à l'élaboration du dossier d'affaires, le tout sous la supervision d'Infrastructure Québec.

     

    De plus, la ministre Courchesne a annoncé qu'au cours des prochaines semaines, la Société immobilière du Québec ira en appel d'offres pour vendre la nouvelle gare d'autobus et l'entreprise qui en assure la gestion, ainsi que les structures inachevées de la portion Nord de l'îlot Voyageur. Le gouvernement s'assurera que les offres retenues soient conformes à la valorisation d'un site qui présente de nombreuses possibilités d'investissements en matière de transport collectif et de développement institutionnel, résidentiel ou commercial.

     

    Avec l'annonce d'aujourd'hui, le gouvernement du Québec pose un geste concret dans sa volonté d'assurer son leadership en matière de sciences de la vie et de revitaliser ce quadrilatère de Montréal.

  15. http://www.montrealgazette.com/Activists+plead+save+Lower+Main/5868551/story.html

     

     

    MONTREAL - Heritage activists say they fear the city will repeat a sad chapter in Montreal history if it razes a storied but dilapidated section of the Lower Main instead of trying to save it.

     

    Heritage Montreal wrote to Mayor Gérald Tremblay on Monday to warn that demolishing the row of vacant late 19th century buildings and facades on the west side of St. Laurent Blvd., between Ste. Catherine St. and René Lévesque Blvd., would set Montreal back decades in terms of preservation.

     

    The Ville Marie borough ordered the owner of the row to install a barricade on Dec. 2 citing concerns for public safety. The safety perimeter has closed the sidewalk in front of the buildings and two lanes of traffic.

     

    The borough is awaiting more studies before it decides whether the structures can be saved, borough spokesperson Anik de Repentigny said Thursday.

     

    “Under your administration, Montreal has made major progress on heritage, sustainable urban development and culture,” says Heritage Montreal’s letter to the mayor, signed by policy director Dinu Bumbaru.

     

    However, it adds, allowing the buildings on The Main to be demolished “would mark a return to a period we hoped had ended” and which left the city with vacant lots and buildings that are out of scale with their surroundings.

     

    This year, Angus Development Corp. withdrew a project to erect a commercial and office complex called Quadrilatère St. Laurent on that section of The Main.

     

    The non-profit company bought up the row between the Monument National and Café Cléopatre in 2009 when the block still housed the iconic Montreal Pool Room.

     

    However, the city’s Office de la consultation publique panned the project. City hall then nixed plans to expropriate the owner of Café Cléopatre, who had refused to sell.

     

    The developer, which refused to comment on Thursday, has yet to announce plans for the site.

     

    The Ville Marie borough ordered the safety perimeter after reading an engineer’s report ordered by the current owner, Gestion Saint-Laurent Angus Inc., which is run by the same group as the development company. The Montreal Fire Department had urged the company to assess the buildings’ structural integrity.

     

    The situation recalls the Queen’s Hotel, a 102-year-old Peel St. landmark that a developer asked to demolish in 1988 to build a project, Bumbaru said. The developer agreed initially with the city’s request to integrate part of the hotel into its plans, but later declared the building structurally unsound. The city allowed most of the hotel to be levelled, though it took three months to raze parts of it. Nothing was built. In 1995, the owner requested permit to demolish the hotel’s remains. It has served as a parking lot since.

     

    “We don’t want to see history repeated on St. Laurent,” Bumbaru said.

     

    lgyulai@montrealgazette.com

  16. http://ville.montreal.qc.ca/portal/page?_pageid=7317,80081586&_dad=portal&_schema=PORTAL&id=3154&ret=/pls/portal/url/page/arrond_vma_fr/rep_annonces/rep_actualites/detail_actualite

     

     

    Nouveau projet résidentiel dans le Vieux-Montréal

     

    Les membres du conseil ont adopté en première lecture un nouveau projet particulier d'urbanisme dans le Vieux-Montréal. Celui-ci concerne la construction d'un immeuble de 12 étages à l'intersection des rues Queen et de la Commune Ouest. Le bâtiment, qui aurait une vocation strictement résidentielle, compterait 94 logements. Ce projet, qui a reçu un avis favorable avec conditions du comité consultatif d'urbanisme, vient confirmer le caractère de plus en plus résidentiel du Vieux-Montréal. Il sera soumis à une assemblée publique de consultation qui aura lieu le 25 janvier à 18 heures à la salle du conseil de l'arrondissement (800, boulevard De Maisonneuve Est).

  17. http://www.montrealgazette.com/business/Replace+parking+lots+with+people/5845128/story.html

     

    Interesting comments by urban planner and former city councillor Robert Libman in the paper.

    See the link above if you want to read the whole article.

    He represents the following owners.

     

    ''I presented a brief to the consultation hearings on behalf of the new owners of a vacant and abandoned property in the Bishop-Crescent sector, which is littered with dozens of similar sites and parking lots. Those sites are devastating for a downtown core for economic, social and urban-planning reasons. The current limitations on the allowable height of new buildings was, until now, the prime disincentive to building. The owners whom I represent recently acquired the property specifically to develop in the context of the proposed new incentives.''

  18. that's great news, is there any plans for the huge lot nearby ?

     

    Haven't heard anything yet, but the final version of the PPU for Sainte-Marie should be out this month, maybe introduced at the council meeting on Monday. That will give the direction the city is pointing to for that lot. If Phase 2 for Le Courant sells well, hopefully developers will get on the bandwagon soon and we'll see some proposals.

     

     

    ''Dans les prochaines semaines, le projet de PPU fera l’objet d’une révision par l'arrondissement avant d’être adopté par le conseil municipal dans sa version finale à l'automne. La mise en oeuvre du PPU se fera conjointement avec les partenaires du milieu qui ont manifesté leur attachement au quartier et ont ainsi participé à la naissance d’un nouveau dynamisme économique et social pour améliorer la qualité de vie des résidants.''

     

    http://ville.montreal.qc.ca/portal/page?_pageid=7317,79383687&_dad=portal&_schema=PORTAL

×
×
  • Créer...