  1. Je ne pense pas que c'est de la fonte, mais plutôt de l'acier corten. https://fr.wikipedia.org/wiki/Acier_Corten Ce n'est pas pour la rue Peel, mais j'ai trouvé mention de ce choix dans ce rapport sur le réaménagement de la Place Simon-Valois https://designmontreal.com/sites/designmontreal.com/files/rapport_de_jury_-_simon-valois.pdf They're trying to go for a trendy industrial look basically
  2. The construction worker in the video on page 235 states at 1:02 minutes that the pylon for the St-Jacques viaduct supports 75% of its final weight, however. There was also temporary bracing under the viaduct that was removed after the cables were installed. I think its logical to assume that the canal bridge's pylon will also support part of its final weight, even if the percentage isn't quite as high as for the St-Jacques viaduct.
  3. Les articles suivants indiquent que cette conduite a été construite dans le début des années 1970 et que le type de conduite utilisée était probablement défectueux. https://journalmetro.com/actualites/montreal/2388380/des-travaux-durgence-necessaires-sur-la-principale-conduite-deau-potable-de-montreal/ https://ici.radio-canada.ca/nouvelle/1347823/montreal-reparation-principale-conduite-eau-potable
×
×
  • Créer...