-
Compteur de contenus
134 -
Inscription
-
Dernière visite
-
Jours gagnés
2
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Messages posté(e)s par SupremeMTL
-
-
I can't get any work done its drilling non stop 8am to 6pm
-
-
3 minutes ago, Yabucoa77 said:
I just got it back after 6 hours without power. Was really them or the people working on Guy (there is road work)?
The reason guy south of rene levesque is blocked is because of pipe work being done for Quinzecent. But the gas leak could have also been cause by Apt Dorchester. I got my power back now as well
- 1
-
Because these guys caused a gas leak I’ve been without power since 10am https://globalnews.ca/news/7021546/gas-leak-calls-downtown-montreal/
-
On 2020-05-22 at 9:40 PM, SkahHigh said:
De toute façon... On ne le verra pas tant avec Enticy. Juste la surhauteur de 40m.
On 2020-05-23 at 11:13 AM, Mondo_Grosso said:Comme d'autres l'ont dit, le développeur n'a pas le choix pour des raisons réglementaires. Tu peux le critiquer pour 100 autres raisons, mais pas à cause du mur aveugle.
Heureusement, l'enveloppe en verre bleu d'Enticy offrira un joli contraste avec le mur noir.
Personnellement, j'applaudis l'audace qu'il a fallu au développeur pour tenter de construire sur un si petit terrain. Ca redéfinit ce qu'on peut faire dans un petit espace, bien sûr dans le contexte du centre-ville de Montréal
Just to build on what SkahHigh and Mondo are saying with Enticy condos blocking the east view.
The decision to leave the east wall of the building windowless could also be because the developers do not know when Concordia University will sell their Visual Arts building on 1395 René-Lévesque W to developers for a condo project (120m + i imagine). Its not a question of "if" its a question of "when" at this point as the building has been neglected for years and the University is more interested in renovating/developing the Hall Building (1455 De Maisoneuve) and are waiting for the right price to sell the Rene Levesque building. Having Enticy + a future condo where the visual arts building was + Icone blocking views out the east side were probably all reasons they decided not to go forward with windows.
-
2 hours ago, internationalx said:
Do we know if these windows are to be filled-in as they are on the lot line? Or will there be a light well between 1 SP and Hotel Philips Place?
There will be no gap between the buildings according to this render, so my guess is those windows will be filled in
Photo taken from here: https://www.1squarephillips.ca/gallery/12
- 3
-
I may have missed this but can someone please explain why this building is 40 floors when VSLP is 58 and both buildings are aprox 200m. My guess is that this building the per floor height will be higher?
-
- C’est un message populaire.
- C’est un message populaire.
-
-
-
-
-
- C’est un message populaire.
- C’est un message populaire.
-
-
- C’est un message populaire.
- C’est un message populaire.
New photos on cote vertu garage project
http://www.stm.info/en/about/major_projects/major-metro-projects/cote-vertu-garage
- 6
-
Does anyone know if this site resumed?
-
-
- C’est un message populaire.
- C’est un message populaire.
-
On 2019-07-02 at 3:03 PM, Mondo_Grosso said:
The authorization for demolition sign in front of the lot as seen in the two photos is gone. I don’t know if this is because of vandalism, or the project was canned ? Hopefully they went back to the drawing board because the proposed building looked ugly as hell.
-
- C’est un message populaire.
- C’est un message populaire.
-
- C’est un message populaire.
- C’est un message populaire.
-
-
- C’est un message populaire.
- C’est un message populaire.
-
16 minutes ago, swansongtoo said:
Nice work brother. But admittedly the same shot from 1964 would be more impressive
Thanks for the compliment . Of course it would have been really nice, but it would have been incredibly difficult to find one in color, in good quality, showcasing the same angle.
- 1
Tour des Canadiens 3 - 53 étages (2020)
dans Complétés
Posté(e)
This may have been mentioned, but what is being built here on the bottom right?
http://www.devisubox.com/dv/dv.php5?pgl=Project/interface&sRef=2O1GPG6FR