They were on-site looking for that "imminent" announcement that was mentioned several months ago
- 4
-
-
To be clear I'm referring to South Block, not 895. 895 is almost spoken for haha
- 1
-
7 hours ago, Rocco said:
Lets hope they have their 👀 on this after their Place Viger project.
They do not.
This lot is already spoken for
- 4
-
1 hour ago, Rocco said:
Budge voudrait bien contredire cette affirmation mais il est retenu par le secret professionnel. Ce secret doit peser très lourd et nous avons tous hâte qu'il se libère de ce poids démesuré sur sa conscience. 😅
You’re always thinking of me
- 1
-
9 hours ago, Rocco said:
Les grandes tours (+30 étages) qui devraient atteindre leur sommet en 2022 ou au début 2023:
- 900 Saint-Jacques // 63
- 1 Square Phillips // 61
- Maestria // 61, 57
- Victoria sur le Parc // 58
- 1000 De La Montagne // 45
- Solstice // 44
- Banque Nationale // 40 (Bureaux)
- QuinzeCent // 37
- Art de Vivre // 35
- MAA // 33
Les grandes tours (+30 étages) annoncées ou confirmées pour le futur:
- NIL // 0
Municipal election was a big factor here. There will be more announcements in 2022.
Also, a lot of the projects you listed will definitely not be complete by Q1 2023...
- 4
-
Substation orrrrrr.... affordable housing!! 😂
- 1
-
- C’est un message populaire.
- C’est un message populaire.
A bit too far south... R, R, R
- 3
- 3
-
Upside: the roof is done 😂
-
2 hours ago, SameGuy said:
Waiting for Kirkland’s residents to hit the brakes on RioCan.
Didn't even want to mention that one because I'm an optimist 😂
- 1
-
It's not a forest, it's a garbage dump with a couple of BMX trails. Let's get serious here... this is prime TOD land right next to the REM station. Get a proper plan in place that includes usable green space and be done with it.
Can't develop here, can't develop behind the old Merck building (now Traffic Tech), can't develop on an old car dealership on St John's etc etc.... it's unconsciable!
- 4
-
12 hours ago, FrancSoisD said:
THE big question here shall be:
😀 Is the design chosen by the promoter at least equally audacious, architecturally-wise, as this sleek rendering?
😢 Or rather, more conventional and/or plain easier to build, structurally-wise? (As you're an ing., you're likely very concerned by this technical aspect.)
I think the design that was chosen completes the square much better than the rendering above.
- 3
-
3 hours ago, Wave Arts said:
Qu'est-ce que ça veut dire, ça? Le projet est présenté au CCU?
Il y a des consultations préliminaires avant le CCU.
- 1
-
You'd know if you worked at the VdM
-
1 hour ago, Fortier said:
Merci pour les infos. Voudrais-tu nous éclairer sur ces évocations? Elles sont pour quel projet?
It was for this site but it’s not the design that was retained.
- 3
-
Excellent series of photos
- 3
-
1 hour ago, yarabundi said:
Sur la deuxième et troisième photos on peut voir des barres d'armature posées en diagonale. Intéressant.
Probablement les murs de contreventement du core
- 1
-
-
-
7 hours ago, peekay said:
Dammit! I missed you by a little bit! I would've bribed you for some juicy scoops!
😂
-
-
26 minutes ago, Rocco said:
La peinture noire de la clôture va commencer à écailler dans 3,2,1....
Don’t think so, this looks machine painted
-
Horrible! La! La!
-
51 minutes ago, Rocco said:
Next time take the penthouse suite please 😉
I don’t have enough MtlUrb dollars
- 1
Spéculations : Site Place de la Cité internationale phase 2
dans Propositions
Posté(e)
Pour l'instant je peux seulement partager que la conception et la surveillance de chantier ne sont pas la même firme