Rumour has it that the crane will arrive over the weekend...TBD
- 2
- 1
-
Christ! They managed to make it worse than before.
- 4
-
A quand l'éclairage de la triangle?
-
Le loup va hurler plus fort une fois le revêtement poser.
- 4
-
N'ose pas. Ca sera pire que les rendus.
- 2
-
Christ, what an ugly POS! Montreal needs to do better.
- 1
-
Did they finally put proper ac ventilation in there? Last time I visited, it was like an oven.
-
Quelle honte! That's what going cheap gets you.
-
Exactement! Ca aurait du être au moin 50% plus haut. Mais non. A Montreal, "We think small"!
- 2
-
Recouverte de graffiti en moin de 5 jours après la fin des travaux.
- 1
-
Brace yourselves. Here comes the exterior cladding any day now...
- 2
-
- C’est un message populaire.
- C’est un message populaire.
Some real losers to put 120m on a 200m zoned lot. Sell the land to Broccolini for christ sake!
- 2
- 2
- 2
-
Now officially the tallest building north of Le 1000.
- 3
-
- C’est un message populaire.
- C’est un message populaire.
-
- C’est un message populaire.
- C’est un message populaire.
-
Bureau En Gro's days are numbered, including the adjacent empty lot. Just a matter of time...
-
The people complaining are so out of touch that it's laughable at this point. "Je veux pleurer quand je vois ca"... Tu es a IDS depuis 50 ans et tu pensais que IDS aller rester un terrain de golf pour l'éternité?? Cette pensée étroite reflète beaucoup le Québec en large. Mauvais planification par nos élus avec des plans conçu pour du courte terme et non du long terme. C'est comme si la croissance et la densification de la population n'a jamais été une facteur dans leurs decision. Incroyable!
- 3
-
- C’est un message populaire.
- C’est un message populaire.
What do you expect?? Its a form of developer and city corruption. Most of the time, the developer already has roughly 3 different design versions of the project planned out in the event the city rejects the first or second version. The 3rd and last version is the most financially conservative and uglier one to develop. When city officials make it difficult to get the project past (sometimes done on purpose), you propose to them the 3rd and cheaper version which therefore leaves you with excess cash to pay off corrupt city officials... Not a bad conspiracy eh!! lol
- 3
- 2
- 2
- 2
-
From the render, looks like 1 floor is missing...
- 1
- 1
-
jesus look at that base 🤢
-
2 hours ago, KOOL said:
Considérant que la couronne de la BN n'ira pas plus haut, comment pourrait-on évaluer la hauteur réelle de cette tout qui ne fait assurément pas 200m, loin de là même.
BN 190m (same height as Exchange Tower), VSP 200m. Case closed.
- 1
-
16 to 17 more floors to go! Should be topped out in May.
-
I hope they put murals on those cement facades on the base of this thing. Just atrocious!
- 1
- 1
-
It's a Montreal tradition. Present it white, give them grey. Nothing new here.
- 1
Palais des Congrès (agrandissement post-2020)
dans Propositions
Posté(e)
Just put a 60 floor tower there and be done with it.