Exactement.
The developer has not chosen the general contractor yet. They are still going through the bidding process.
What I heard was that they originally planned 2 blocks of townhouses to sale but eventually opened up 4 blocks and will deliver all 4 blocks at the same time in 2021 with the condos instead of in 2020 before the condos.