KevinL
-
Compteur de contenus
30 -
Inscription
-
Dernière visite
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Messages posté(e)s par KevinL
-
-
In my opinion, Calgary's light rail mode in DT may work for the situation of Rene levesque
- 1
-
où sont les photos de construction?
-
Where is at catherine st transformation
- 1
-
2 hours ago, reecemartin said:
Montreal just unveiled the first Alstom Metropolis train that will be used on the REM, and I got the chance to check them out in person! Enjoy this first hand look.
It looks like a green onion
- 1
-
- C’est un message populaire.
- C’est un message populaire.
It is bad to see that downtown core's skyline will be completely flat
- 6
- 2
-
The space between two buildings must be very undesirable
-
Look forward to seeing its landscape
-
The materials of buildings don't like those in the rendering
- 2
-
topped out soon
-
5 hours ago, denpanosekai said:
I would have preferred Griffintown-ETS, like guy-concordia, berri-uqam, etc...
Ets is a little bit far and it is not representative, in my opinion
- 1
-
Why it doesn't have balcony
-
This station reminds me of covid 19
-
A new bridge is needed
- 1
-
It looks ugly for the city that the high-rise condos in area are of the same height
- 3
-
No exit for cars on the west side?
-
It seems that the pit is deeper than other buildings
-
Will it be connected to the underground city?
-
So, this apartment doesn't have any balcony?
-
Digging has started!
-
will it be connected to the subway station?
-
- C’est un message populaire.
- C’est un message populaire.
-
Why there are so many buildings using black tiles in MTL?
- 2
-
3 minutes ago, Rocco said:
Maybe its temporary while new co-owners settle in, until the top floors are finished?
It is permanent,because they have provided new renders for the changed design
-
Very unhappy with the developer, they move the gym and party room to the ground floor, on where no natural light is available. The reason to do so is that they want to have more office spaces for more profit. Also, they change plans of 37 th floor and 38th floor. I think this project is a waste for this location.
Le Grand Quai du Port de Montréal
dans Infrastructures
Posté(e)
La tour de droite sera-t-elle démolie?