qewewfsgsvg
-
Compteur de contenus
29 -
Inscription
-
Dernière visite
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Messages posté(e)s par qewewfsgsvg
-
-
The delivery will start in March 2022!
- 1
-
Anybody know when will the delivery starts?
-
Found this photo that can perfectly describe how disgusting these patterns are....
- 2
-
Anybody has an idea when phase 3 will start the delivery?
-
-
I feel like this pattern thing on the balcony is either a "really love" or "really hate" thing.
Personally, I really hate it. Extremely ugly, especially for a building situated at the core location of Griffintown.
- 3
-
There will be a new store opening at the corner of de la Montagne and Wellington called Pamai. A plant + bubble tea store. (http://www.pamai.ca/en/home/)
Prime location in Griffintown.
- 2
-
-
- C’est un message populaire.
- C’est un message populaire.
-
3 hours ago, Rocco said:
Usually the basin is dry in winter. I'm curious why they left the water this year. The city is losing a great opportunity to build a superb public skating rink in the heart of Griffintown.
https://www.cbc.ca/news/canada/montreal/why-can-t-you-skate-on-the-lachine-canal-1.5053285
-
Although I don't like Devimco, I have to say these two buildings look impressive so far
-
On 2020-02-02 at 2:44 PM, FrancSoisD said:
This s*cks. I thought Rachel Julien were usually quite reliable as a promoter... 😨
That's exactly what I thought when purchasing the condo. Very disappointed
-
5 hours ago, Alpel74 said:
Do you speak about phase 1 or phase 2 ?
Phase 2
-
Anybody purchasing X16 unit, and were informed today or recently that the balcony size is smaller AGAIN!?
In our original floor plan the balcony supposed to be 92 sqft, but now cuts to like half: 43sqft.
The worst thing is this is their 2nd time changing the plan, with the 1st change make it to 63 sqft.
Very ridiculous service, how come they make changes like this?
Anybody is impacting from this, is there anything at all we can do?
- 1
- 1
-
Anybody know if there will be commercial space in the lobby? Or just residential lobby?
-
3 hours ago, ScarletCoral said:
Donc, cette fontaine qu'on voit encore sur le site Web ne sera pas construite? C'est p-ê aussi bien de même, une fontaine coûte cher à entretenir
Pour la terrasse, parlez-vous de celle-ci?
Elle va être remplacée par un toit vert sans accès? Sinon, la vue vers le canal des résidents vont être gâchée par un toit insipide
Aussi, l'arrondissement a des exigences de terme de superficies vertes pour les projets de Griffintown.Believe the fountain is being built, but sounds like not the terrase
-
So does that mean in terms of common space, phase 2 will only have Swimming pool. Phase 1 will have both Terrace and the gym??
-
Anyone has a price list?
-
9 hours ago, montrealcondo said:
Finally great work for phase 2 I just visited and I'm surprised the quality of the project in general. Probably one of the best neighborhood projects in Griffintown and sorry I forgot to take pictures.
Is the common area like the swimming pool ready?
-
Did someone get contacted by a notary? With the proposed delivery date Mar 15th coming.... I am assuming the notary should start contacting us now?
-
I received one letter in early Dec mentioning the delivery will start at mid-March this year... no any news after and now it's late Jan... I will be seriously surprised if they can deliver the project on time...
- 1
-
6 hours ago, anaishaidar said:
Hi everyone!
I have contacted Rachel and she Told Me That Even Though my unit is on the 4th floor, We would only be reliable to sign the deed of sale march / april 2019. A not ification will be sent out 90 days before this date.
Hope this helps!
To be honest I doubt the unit will be delivered by March/April..
-
Does anyone have an idea when the move in will start?
- 1
-
On 2018-07-28 at 4:10 PM, invest26 said:
Certains d’entre vous on acheté dans la phase 2 (tour) étages 1 à 7? Si oui , on vous avais parlé de quel date de livraison?Merci
Last time I asked them they told me it will be the 1st semester of 2019
- 1
Gallery sur le Canal - 14, 14, 14 étages
dans Complétés
Posté(e)
Any ideas if the empty space in phase 3 lobby will be used for commercial or residential?