Aller au contenu

sseguin613

Membre
  • Compteur de contenus

    9
  • Inscription

  • Dernière visite

Messages posté(e)s par sseguin613

  1. When I was there on Friday for the tour, the construction supervisor showed us some of the paneling that was perforated. The holes are very small, and i don't think it will come off like the renders. You know how the panels are in the Halles de la Gare (where the restos and shops are), pretty much like that (sorry I don't have any pictures of them when they were shown to me). 

    I don't think all will be perforated but there will still be a decent amount for sure. The impression I got was around 1/4-1/2 of the ceiling would be perforated.

    FZ-a9t6WQAAHiMP.jpg.289285d0ae848b130c61a790143d3772.jpg

    FZ-bPhZXgAQgxp4.jpg.ccae168616384b5258928452a548a6ac.jpg

    FZ-bPhZXwAAQZ59.jpg.93738dbf194005130974eabc92e507a6.jpg

    Here are the renders (which make the perforated holes look bigger than what I was shown. Again, they appeared to be nearly if not identical to the ones in the RESO pathway of the Halles de la Gare area). They appeared black.

    Gare-centrale_interieur1.jpg.c9e845f20cbec18ad2c99c4a7b64ddc2.jpg

    Gare-centrale_interieur2.jpg.4892d7819974e119ae4bc72cdb6fe6b9.jpg

    • Like 3
×
×
  • Créer...