Jump to content

Recommended Posts

  • Replies 1.4k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Hello! For the rest of the discussion, please join the largest and most influential discussion community about real estate development in Montréal here: https://mtlurb.com/register/

Hello! For the rest of the discussion, please join the largest and most influential discussion community about real estate development in Montréal here: https://mtlurb.com/register/

Hello! For the rest of the discussion, please join the largest and most influential discussion community about real estate development in Montréal here: https://mtlurb.com/register/

Posted Images

  • Feanaro changed the title to Skyline de Montréal

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By Nameless_1
      Travaux à venir à la station Place Saint-Henri

       
      Durée des travaux : 17 novembre 2020 à l'automne 2023
      Nature des travaux : installation d'ascenseurs, construction de deux édicules et réaménagement de la place Saint-Henri.
      Impacts métro : à partir du mardi 17 novembre à 21 heures, les deux accès souterrains, situés des côtés nord et sud de la rue Saint-Jacques, seront fermés pour la durée complète des travaux. L’accès principal, situé sur la rue Saint-Ferdinand, restera ouvert.
      Impacts bus : non
       
      Le projet en bref
      Des travaux commenceront bientôt, afin d’installer des ascenseurs à la station Place-Saint-Henri. Deux édicules vont également être construits pour remplacer les deux accès secondaires à la station et la place Saint-Henri sera réaménagée. Lorsque les travaux seront terminés, l'accès à la station par ascenseurs se fera par l'édicule situé sur la place Saint-Henri.
      http://www.stm.info/fr/infos/etat-du-service/travaux/place-saint-henri-0?utm_campaign=carrousel&utm_source=TravauxPSH&utm_medium=carrousel
       


    • By mtlurb
      Prolongement de la ligne bleue vers l'est

      Prolongement de la ligne bleue vers l'est. La mise en chantier est prévue en 2022, pour une livraison en 2026. Connexion avec le SRB Pie-IX, stationnement de 1200 places aux Galeries d'Anjou. Coût évalué à 3.9 milliards de dollars.
      Le projet en chiffres 
      5 nouvelles stations de métro accessibles, pour une longueur de tunnel de 5,8 km 2 terminus d’autobus et 1 stationnement incitatif de 1 200 places 1 tunnel piétonnier souterrain assurant le lien avec le futur SRB Pie-IX Plusieurs infrastructures opérationnelles : 6 structures auxiliaires renfermant des équipements nécessaires à l’exploitation, 1 poste de district, 1 garage de métro, 1 centre d’attachement hébergeant des véhicules d’entretien des voies et 1 centre de service pour l’entretien des infrastructures Budget estimé de 3,9 G$ Échéancier préliminaire
      Début 2019 : début de la conception des plans et devis.  Printemps 2019 : approbation du mode de réalisation, du plan budgétaire et de l’envergure du projet. Fin 2019 : début de travaux préparatoires sur certains sites. Début 2020 : démarrage des processus de changement de zonage et de consultations publiques.   2021 : dépôt du dossier d’affaires, lancement de la construction des nouvelles infrastructures. 2026 : inauguration du nouveau tronçon. Information : http://www.stm.info/fr/a-propos/grands-projets/grands-projets-metro/prolongement-ligne-bleue
      Consultations publiques : http://www.stm.info/fr/consultations/prolongement-de-la-ligne-bleue
      Commande architecturale : http://www.stm.info/sites/default/files/media/Travaux/Ligne_bleue/commande_architecturale_pl5.pdf
      Rapport final & emplacement des stations: http://www.stm.info/sites/default/files/media/Travaux/Ligne_bleue/rapport_final_commission_plb_200529.pdf
      Plan d'action : http://www.stm.info/sites/default/files/media/Travaux/Ligne_bleue/plb_commission_publique_plan_daction_stm.pdf
       
        
       
    • By Philippe
      Bonjour,
       
      Voici un thread ou tous et chacun pourront mettre leurs photos sans nécessairement créer un nouveau thread. Un peu dans le genre ''post some pcitures of your city'' sur SSP.
       
      Je commence avec quelques photos que j'ai pris sur un bateau dans le vieux-port.
       

       

       

       

    • By ScarletCoral
      J'ai compilé la liste des pages contenant les différents documents présentés lors de assemblées publiques de consultation tels que les documents du PPCMOI

      Pas tous les arrondissements sont aussi assidus à publier les documents contenant les rendus des projets à l'étude. Certains ont juste une page d'information sur le CCU
      Les meilleurs sont : CDN-NDG, le Plateau-Mont-Royal, Le Sud-Ouest, Mercier-Hochelaga-Maisonneve, Ville-Marie et Verdun
      Ahuntsic-Cartierville :  http://ville.montreal.qc.ca/portal/page?_pageid=7957,142581083&_dad=portal&_schema=PORTAL  https://montreal.ca/articles/consultations-ecrites-ahuntsic-cartierville Anjou :  https://montreal.ca/actualites/les-consultations-ecrites-en-cours-anjou Côte-des-Neiges - Notre-Dame-de-Grâce :  http://ville.montreal.qc.ca/portal/page?_pageid=7497,142955988&_dad=portal&_schema=PORTAL  https://montreal.ca/articles/consultations-en-mode-virtuel-dans-cdn-ndg Lachine Voir dans la liste des événements de l'arrondissement : https://montreal.ca/evenements?dc_coverage.boroughs.code=LCH&mtl_content.evenements.event_type.code=TEV05,TEV06&orderBy=dc_temporal.start LaSalle Voir dans la liste des événements de l'arrondissement : https://montreal.ca/evenements?dc_coverage.boroughs.code=LSL&mtl_content.evenements.event_type.code=TEV05,TEV06&orderBy=dc_temporal.start Le Plateau-Mont-Royal :  Assemblées publiques : http://ville.montreal.qc.ca/portal/page?_pageid=7297,74659611&_dad=portal&_schema=PORTAL Séances du comité d'étude des demandes de démolition : http://ville.montreal.qc.ca/portal/page?_pageid=7297,81015593&_dad=portal&_schema=PORTAL Le Sud-Ouest :  http://ville.montreal.qc.ca/portal/page?_pageid=7757,84961577&_dad=portal&_schema=PORTAL   https://montreal.ca/articles/consultations-ecrites-dans-le-sud-ouest L’Île-Bizard–Sainte-Geneviève : Procès-verbaux du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=8497,142762272&_dad=portal&_schema=PORTAL https://montreal.ca/articles/consultations-ecrites-lile-bizard-sainte-genevieve Mercier–Hochelaga–Maisonneuve :  http://ville.montreal.qc.ca/portal/page?_pageid=9417,114239587&_dad=portal&_schema=PORTAL  https://montreal.ca/articles/consultations-en-mode-virtuel-dans-mhm Montréal-Nord :  https://montreal.ca/articles/consultations-en-mode-virtuel-dans-montreal-nord Outremont :  http://ville.montreal.qc.ca/portal/page?_pageid=8517,95571727&_dad=portal&_schema=PORTAL#documents Voir dans la liste des nouvelles de l'arrondissement : https://montreal.ca/nouvelles?dc_coverage.boroughs.code=OUT Pierrefonds-Roxboro : Ordres du jour du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=8377,142652423&_dad=portal&_schema=PORTAL https://montreal.ca/articles/consultations-en-mode-virtuel-dans-pierrefonds-roxboro Rivière-des-Prairies–Pointe-aux-Trembles :  http://ville.montreal.qc.ca/portal/page?_pageid=7697,83667580&_dad=portal&_schema=PORTAL  https://montreal.ca/articles/consultations-publiques-ecrites-consultez-les-dossiers-en-cours Rosemont–La Petite-Patrie :  https://montreal.ca/articles/consultations-en-mode-virtuel-dans-rosemont-la-petite-patrie Saint-Laurent : Dates des séances publiques du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=7937,87207739&_dad=portal&_schema=PORTAL  https://montreal.ca/articles/consultations-publiques-virtuelles-saint-laurent Saint-Léonard : dernière mise à jour en 2017 : https://ville.montreal.qc.ca/portal/page?_pageid=7157,142045745&_dad=portal&_schema=PORTAL https://montreal.ca/articles/consultation-ecrite-en-cours-saint-leonard Verdun :  http://ville.montreal.qc.ca/portal/page?_pageid=8637,96045934&_dad=portal&_schema=PORTAL https://montreal.ca/articles/consultations-en-mode-virtuel-dans-verdun Ville-Marie :  http://ville.montreal.qc.ca/portal/page?_pageid=7317,127951572&_dad=portal&_schema=PORTAL  https://montreal.ca/articles/consultations-en-mode-virtuel-dans-ville-marie Villeray–Saint-Michel–Parc-Extension : https://montreal.ca/articles/consultations-en-mode-virtuel-dans-villeray-saint-michel-parc-extension
    • By CFurtado
      Les entrepreneurs Kurt D. Lynn et Mohamed Hage proposent une petite révolution dans l'industrie montréalaise des légumes. Avec l'aide de Google Earth, ils ont répertorié les plus grands toits plats des bâtiments industriels de Montréal et proposent d'y faire pousser des produits potagers à longueur d'année. À commencer par le toit de cette bâtisse sans nom en périphérie du Marché central qui nourrira 2000 personnes.
       
      Ils sont de ces êtres qu'on appelle des entrepreneurs en série. Mohamed Hage et Kurt D. Lynn se sont d'ailleurs rencontrés il y a quatre ans, alors que le plus âgé aidait le plus jeune à mettre une entreprise sur pied. Ce sont des férus de technologies.
       
      Ils transposent aujourd'hui leur passion des gadgets au potager avec leur nouveau projet: les Fermes Lufa. L'inspiration? «En fait, on tripe tous les deux sur la nourriture», dit simplement le Montréalais à temps partiel, M. Lynn, qui vit l'autre moitié du temps à Toronto. À force d'en discuter ensemble, ils ont voulu changer leur façon de se nourrir en créant leur propre ferme sans pesticides ni OGM. Mais pas question de faire ça en dehors de la ville. «Plus la nourriture s'éloigne d'où elle a été cultivée, plus elle perd sa saveur et sa valeur nutritive. Et plus elle pollue en raison du transport.» Ça, on l'a dit souvent, d'où la tendance au locavorisme, une alimentation qui s'en tient aux produits locaux.
       
      Mais les terres cultivables sont rares sur l'île... Les deux gourmets se sont donc tournés vers les toits des immeubles commerciaux pour élever la première serre commerciale sur un toit d'envergure au Québec, présentement en construction dans le quartier Ahuntsic. «On a fait des recherches et on pense être la première au monde, si on exclut les petits jardins sur des toits qui fournissent des herbes ou certains légumes à quelques restaurants aux États-Unis», dit Kurt D. Lynn. Il y a toutefois déjà quelques jardins collectifs sur les toitures et balcons du Québec et le premier toit vert remonterait aux années 1970 à Montréal, selon le Centre d'écologie urbaine.
       
      Le iPod de l'agriculture
       
      Avec une équipe d'architectes, d'ingénieurs, de scientifiques et d'agents immobiliers, les deux hommes d'affaires ont prévu tous les détails de cette première serre de 31 000 pieds carrés qui offrira ses récoltes, dès le mois de mars, par la vente de paniers. L'équipe a déjà établi que l'eau de la pluie sera recueillie pour arroser les plants, que les coccinelles remplaceront les pesticides et que la distribution, locale, se fera à partir de points de chute pour éviter des trajets en camions. «C'est ça qu'on veut éviter!» dit M. Lynn en pointant un camion qui sort d'un entrepôt, chargé de légumes, qu'un autre camion est venu y déposer... Au total, la serre d'Ahuntsic pourra nourrir 2000 personnes toute l'année.
       
      Mohamed Hage, en bon amateur de technologies, compare les Fermes Lufa au iPod. «Apple a été le premier à mettre ensemble autant de fonctions dans un même objet d'une façon efficace.» Idem pour sa ferme de la rue Antonin-Barbeau, qui réunira la serre, le toit vert, le concept de panier santé et une façon écologique de cultiver. «Ce n'est rien de nouveau, c'est juste une nouvelle combinaison», selon Kurt D. Lynn. Et ce n'est qu'un début: d'autres projets, dont un autre cinq fois plus grand à Montréal, sont prévus dans la province et en Ontario.
       
      L'invitation est lancée à tous les Home Dépôt et Costco de ce monde qui voudraient louer cet espace perdu. Une bonne façon pour ces monstres de béton de faire leur part pour la communauté, croient les deux hommes. «Les gens les détestent lorsqu'ils sont construits. Mais si au moins leurs toits pouvaient nourrir 12 000 personnes...» dit Mohamed Hage. Ces bâtisses sont idéales parce que leurs toits sont plats et solides. Car si la culture hydroponique, donc sans terre, en fait une ferme assez légère, tous les toits ne sont tout de même pas admissibles au royaume des légumes en altitude. Les immeubles coiffés d'une ferme gagnent en échange une isolation totale du côté du toit, puisque la serre permet d'éviter toute perte de chaleur.
       
      10 % des toits de Montréal?
       
      Les deux entrepreneurs de la pousse écolo ont fait appel à une équipe scientifique multidisciplinaire de l'Université McGill pour choisir les produits qui pousseront sur ce toit d'un immeuble sans nom en périphérie du Marché central. Ils recherchent les variétés les plus nutritives et les plus savoureuses. «Ce n'est pas un projet commun: généralement, c'est le fermier qui décide ce que les gens mangent, selon ce qui se conserve le plus longtemps, dit la phytologue Danielle Donnelly, qui étudie en ce moment les concombres et les tomates. Avec ces deux gars, ce sont les nutritionnistes qui décident!»
       
      Le fondateur de Green Roofs for Healthy Cities, une association basée à Toronto qui regroupe l'industrie des toits verts de l'Amérique du Nord, estime qu'environ 10 % des toits des villes canadiennes peuvent accueillir un potager. «À Toronto, ça représente 500 millions de pieds carrés, dit Steven Peck. Ça donne une idée des opportunités. Ce sont des idées encore très nouvelles, émergentes, mais une serre comme ça aura beaucoup de bénéfices sociaux et économiques.»
       
      Le président du Centre d'écologie urbaine de Montréal, Owen Rose, se réjouit qu'une entreprise s'installe ainsi sur un toit. «Le privé aussi a son rôle à jouer pour l'environnement. Et c'est un bon moyen de valoriser l'agriculture urbaine.»
       
      http://www.ledevoir.com/environnement/actualites-sur-l-environnement/310328/une-ferme-sur-le-toit-sans-pesticides-ni-ogm



×
×
  • Create New...