Recommended Posts

Quebec's influence on the wane

 

TIM WHARNSBY

 

From Monday's Globe and Mail

 

June 22, 2008 at 7:53 PM EDT

 

OTTAWA — In the end, 27 players from the QMJHL were selected in the seven rounds of the 2008 NHL entry draft, and that was in line with the average of 26.7 chosen in the seven previous drafts.

 

But when the QMJHL was shut out in the first round on Friday, alarm bells went off in supposedly hockey-mad Quebec. This had happened before, with the most recent occurrence in 2000, but when a prime-time national television audience watches seven of the first 10 players, 11 in total, selected from the OHL and nine from the WHL, the QMJHL was left red-faced.

 

The lack of production may signify that Quebec hockey is on the cusp of a crisis. The Montreal Canadiens are fashionable again, and the all-sport French television network RDS smashed all sorts of records with millions of viewers in the Habs' run to the second round of the Stanley Cup playoffs, but Canadiens general manager Bob Gainey concedes the province needs to step back and study the situation.

 

“We're usually under scrutiny to take kids from Quebec,” Gainey said. “But I think in the past two or three years there has been information that has surfaced that says there just aren't as many players coming from Quebec as comparative to the past or other places.”

Related Articles

 

Of the 27 players selected from the QMJHL, 19 are from Quebec, two are Europeans, five are from the Atlantic provinces and one from Ontario. When the Detroit Red Wings made Julien Cayer of Longueuil, Que., a fifth-round selection – he plays for Northwood Prep in New York – that gave La Belle province an even 20.

 

“I think it's simple evidence that it's just the way it is,” Gainey said. “I don't have any hard-core facts as to why it's the way it is, but it's clear this needs to be looked at.”

 

Off the top, there are several factors that may have contributed to Quebec's decline in top end talent. The QMJHL nearly doubled its size, to 18 teams in 2004 from 10 teams in 1969, and the minor hockey base couldn't keep up, even though the QMJHL opened its doors to the Atlantic provinces and that area has flourished with players such as Brad Richards of Murray Harbour, PEI, and Sidney Crosby of Cole Harbour, N.S.

 

There also is the fact that Montreal, the province's most populated area, has been without a QMJHL franchise since the Montreal Rocket left in 2003, and the franchise was only there for four years. The absence of a stable junior franchise in Montreal, as well as the city's diverse ethnic makeup, has hindered minor-hockey enrolment in the area.

 

QMJHL commissioner Gilles Courteau believes the transfer of the St. John's franchise, which will become the Montreal Junior Hockey Club in the fall, to the Montreal suburb of Verdun will help the cause.

 

“That's going to help because every city where we have been, the amount of minor-hockey participation has increased,” Courteau said. “But there is no doubt that there are lots of people from different nations that don't play hockey [in Montreal]. We need work better hand in hand with the Quebec branch [of hockey].”

 

Gainey would like to see an in-depth study done to identify issues that confront the province. He promised the Canadiens will perform a leading role. Already the NHL club administers the Learn, Respect and Fun program, in which thousands of minor-hockey players sign a contract with the Habs, pledging to learn the rules of the game, to abide by principles of sportsmanship, respect for teammates, opponents and officials and to have fun playing the game.

 

“We are in a place that as part of a coalition or group to say, ‘Here's where we are and how do we need to get more kids playing and more ice available?'” Gainey said. “I don't really know what the problem is. I would hazard that the problem is multilayered.

 

“Before you forge off in any direction, you need to get a solid idea of what the landscape looks like. That would be the first step, getting people together to look at this. The Montreal Canadiens could play a role. The sport ministries could play a role. Former players who grew up in Quebec could play a role.

 

“There is no reason why the sport can't be reconfigured, and the Canadiens naturally should play an important and leading role.”

 

http://www.globesports.com/servlet/story/RTGAM.20080622.nhl-draft23/GSStory/GlobeSportsHockey/home

Share this post


Link to post
Share on other sites

I don't think income is it, people don't have the time to friggin wake up at 4am to bring their kids at morning practices... people have less time and less dedication for these things.

Share this post


Link to post
Share on other sites

You're both right, I was never enrolled in hockey as a child due to both money and time commitments.

 

Instead, I played soccer, and later baseball.

Share this post


Link to post
Share on other sites

Its hard to believe that people were richer 10 years ago, let alone 20 or 30. I think people have other priorities...

Share this post


Link to post
Share on other sites

Honestly I care more about being happy and having time than having a lot of money. I'm sure most people are generally the same.

 

Regardless, I'm still a person who loves luxury and quality products. :shhh:

Share this post


Link to post
Share on other sites

Family sizes could be a factor; video games and laziness too. Twenty years ago, when I was growing up in suburban Quebec City, my neighbourhood friends usually had three, four, even five older or younger brothers, and usually they all played hockey. It was common to have four family members playing hockey, handing down equipment and skills, playing three games of street hockey at once (on a street where there were maybe 15 houses). Every second house had a backyard ice rink, and dad's really got involved. Mom's did too (waking up to make breakfast, cleaning the equipment). I remember how our parents would all sit together at the arena. There was a real sense of community and sportsmanship. Now, I go down that street on a nice winter afternoon and nobody is playing street hockey. I talk to the old neighbours and they tell me the families that are there now have one, two, (rarely) three kids. Neighbours don't talk to each other, everyone has their own stuff, so there's no sharing. Times have changed.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

  • Similar Content

    • By SkahHigh
      Fil de discussion sur les ouvrages d'art (viaducs, structures aériennes, etc.) de l'antenne Deux-Montagnes du REM.

    • By ScarletCoral
      J'ai compilé la liste des pages contenant les différents documents présentés lors de assemblées publiques de consultation tels que les documents du PPCMOI

      Pas tous les arrondissements sont aussi assidus à publier les documents contenant les rendus des projets à l'étude. Certains ont juste une page d'information sur le CCU
      Les meilleurs sont : CDN-NDG, le Plateau-Mont-Royal, Le Sud-Ouest, Mercier-Hochelaga-Maisonneve, Ville-Marie et Verdun
      Ahuntsic-Cartierville : http://ville.montreal.qc.ca/portal/page?_pageid=7957,142581083&_dad=portal&_schema=PORTAL Anjou Côte-des-Neiges - Notre-Dame-de-Grâce : http://ville.montreal.qc.ca/portal/page?_pageid=7497,142955988&_dad=portal&_schema=PORTAL Lachine LaSalle Le Plateau-Mont-Royal : http://ville.montreal.qc.ca/portal/page?_pageid=7297,74659611&_dad=portal&_schema=PORTAL Le Sud-Ouest : http://ville.montreal.qc.ca/portal/page?_pageid=7757,84961577&_dad=portal&_schema=PORTAL L’Île-Bizard–Sainte-Geneviève : Procès-verbaux du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=8497,142762272&_dad=portal&_schema=PORTAL Mercier–Hochelaga–Maisonneuve : http://ville.montreal.qc.ca/portal/page?_pageid=9417,114239587&_dad=portal&_schema=PORTAL Montréal-Nord Outremont : http://ville.montreal.qc.ca/portal/page?_pageid=8517,95571727&_dad=portal&_schema=PORTAL#documents Pierrefonds-Roxboro : Ordres du jour du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=8377,142652423&_dad=portal&_schema=PORTAL Rivière-des-Prairies–Pointe-aux-Trembles : http://ville.montreal.qc.ca/portal/page?_pageid=7697,83667580&_dad=portal&_schema=PORTAL Rosemont–La Petite-Patrie Saint-Laurent : Dates des séances publiques du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=7937,87207739&_dad=portal&_schema=PORTAL Saint-Léonard : dernière mise à jour en 2017 : https://ville.montreal.qc.ca/portal/page?_pageid=7157,142045745&_dad=portal&_schema=PORTAL Verdun : http://ville.montreal.qc.ca/portal/page?_pageid=8637,96045934&_dad=portal&_schema=PORTAL Ville-Marie : http://ville.montreal.qc.ca/portal/page?_pageid=7317,127951572&_dad=portal&_schema=PORTAL Villeray–Saint-Michel–Parc-Extension
    • By mtlurb
      STM: Prolongement du métro: Ligne 02 orange vers le nord-ouest

      Discussion et actualités sur le prolongement de la Ligne 02 orange vers le nord-ouest. Plan: ligne-2.pdf
      Présentation du 26 février 2020 au comité exécutif de la Ville de Montréal : https://ville.montreal.qc.ca/documents/Adi_Public/CE/CE_DA_ORDI_2020-02-26_08h30_Presentation_Prolongation_de_la_ligne_Orange_Ouest.pdf
    • By mtlurb
      Prolongement de la ligne bleue vers l'est

      Prolongement de la ligne bleue vers l'est. La mise en chantier est prévue en 2022, pour une livraison en 2026. Connexion avec le SRB Pie-IX, stationnement de 1200 places aux Galeries d'Anjou. Coût évalué à 3.9 milliards de dollars.
      Le projet en chiffres 
      5 nouvelles stations de métro accessibles, pour une longueur de tunnel de 5,8 km 2 terminus d’autobus et 1 stationnement incitatif de 1 200 places 1 tunnel piétonnier souterrain assurant le lien avec le futur SRB Pie-IX Plusieurs infrastructures opérationnelles : 6 structures auxiliaires renfermant des équipements nécessaires à l’exploitation, 1 poste de district, 1 garage de métro, 1 centre d’attachement hébergeant des véhicules d’entretien des voies et 1 centre de service pour l’entretien des infrastructures Budget estimé de 3,9 G$ Échéancier préliminaire
      Début 2019 : début de la conception des plans et devis.  Printemps 2019 : approbation du mode de réalisation, du plan budgétaire et de l’envergure du projet. Fin 2019 : début de travaux préparatoires sur certains sites. Début 2020 : démarrage des processus de changement de zonage et de consultations publiques.   2021 : dépôt du dossier d’affaires, lancement de la construction des nouvelles infrastructures. 2026 : inauguration du nouveau tronçon. Information : http://www.stm.info/fr/a-propos/grands-projets/grands-projets-metro/prolongement-ligne-bleue
      Consultations publiques : http://www.stm.info/fr/consultations/prolongement-de-la-ligne-bleue
        
       
    • By SkahHigh
      Fil de discussion sur les travaux du tunnel Mont-Royal dans le cadre du REM.