Jump to content

ville-marie Spéculation : Site Place de la Cité internationale phase 2


mtlurb

Recommended Posts

59 minutes ago, KOOL said:

Pour le « un peu moins de 200m» Je n'ai fait que répéter ce que tu as déjà écrit sur ce forum et je n'ai pas le courage ou le temps d'aller chercher l'info. Donc j'imagine par ta réaction que ce sera du 200,. :cool:

Pour le 2025 : Then again, je n'ai fait que répéter ce que tu as déjà écrit sur ce forum. 😉

I know but it's a dynamic process :P

Until there are shovels in the ground things can change haha

Link to comment
Share on other sites

14 minutes ago, budgebandit said:

Until there are shovels in the ground things can change haha

And even then…

I mean, there’s already a basement on the site!

Link to comment
Share on other sites

il y a 24 minutes, budgebandit a dit :

Until there are shovels in the ground things can change haha

Yep but then again certain things will never change... :silly:

PS @ Sameguy 🤣

Link to comment
Share on other sites

12 hours ago, SameGuy said:

And even then…

I mean, there’s already a basement on the site!

Can the current basement structure support a 200m tower? I think it was originally planned for a 15-20 storey building. I wonder if a new build would have to completely scrap the existing base or simlpy reinforce it. @budgebandit?

Link to comment
Share on other sites

1 hour ago, go_habs_go said:

Can the current basement structure support a 200m tower? I think it was originally planned for a 15-20 storey building. I wonder if a new build would have to completely scrap the existing base or simlpy reinforce it. @budgebandit?

Personally, I would like to see a 140-170 meter building on this site. I am thinking taller than the twins to the north, but not quite as tall as TDLB.

Link to comment
Share on other sites

1 hour ago, go_habs_go said:

Can the current basement structure support a 200m tower? I think it was originally planned for a 15-20 storey building. I wonder if a new build would have to completely scrap the existing base or simlpy reinforce it. @budgebandit?

The original site was for a 10 and 31 storey office tower. There would be no major issue with two 200m towers. 

Link to comment
Share on other sites

I don't see how a foundation buried in tons of dirt for over 30 years can be in good condition, I certainly wouldn't want to live in any tower built on this site ( Quebec doesn't have a great history when it comes to concrete )

Link to comment
Share on other sites

36 minutes ago, mtlrdp said:

I don't see how a foundation buried in tons of dirt for over 30 years can be in good condition, I certainly wouldn't want to live in any tower built on this site ( Quebec doesn't have a great history when it comes to concrete )

Pompei has been buried for over 2000 years and most is still intact. Altho yeah its not the "béton du Québec".

Link to comment
Share on other sites

Il y a 10 heures, mtlrdp a dit :

I don't see how a foundation buried in tons of dirt for over 30 years can be in good condition, I certainly wouldn't want to live in any tower built on this site ( Quebec doesn't have a great history when it comes to concrete )

Also the main reason why concrete suck here, its because it's expose to the elements & salt so I would not be worry about concrete buried below the grass. Also those foundation are less old then the SunLife, PVM or CIBC & nobody is worrying about those ones.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By Feanaro
      Terrains vacants à vendre juste au sud de la Place Bonaventure (brochure en français disponible sur le site Web) : 
      - http://matrix.cwcanada.com//filecabinet/Trans/498605/Terrains_South_Block_Lands_Teaser_(E)_final.pdf
      - http://www.cushmanwakefield.ca/properties/m1078627-1
       
      Est-ce que quelqu'un sait s'il y a un (ou des) projet(s) sur ce site? 
    • By IluvMTL
      2180-2190 boul de Maisonneuve Est/ coin Parthenais

       
    • By IluvMTL
      Québec déplacera des employés dans l'Est 
      1000 rue Fullum (Quartier des fonctionnaires)

      Bloc C 
       
       
    • By IluvMTL
      Nom: 21e Arrondissement
      Hauteur en étages: 9, 14
      Hauteur en mètres:
      Coût du projet:
      Promoteur: Prével
      Architecte: Groube IBI CHBA
      Entrepreneur général:
      Emplacement:
      Début de construction: 2013
      Fin de construction:
      Site internet: http://le21e.prevel.ca/fr/
      Lien webcam:
      Autres informations:
      Rumeurs:
      Aperçu artistique du projet: 

      Maquette:
      Vidéo promotionnelle:
      Autres images:
       
    • By MDCM
      Emplacement: Métro Frontenac, 2600-2660 Ontario Est
      Hauteur en étages: ?
      Hauteur en mètres: 
      Coût du projet: 
      Promoteur: Bertone
      Architecte: 
      Entrepreneur général: 
      Début de construction: Été 2018
      Fin de construction: Été 2019
      Site internet: http://bertone.ca/fr/project/2600-2660-rue-ontario-est-montreal/
      Lien webcam:
      Autres détails: 124 570 pieds carrés, Mixte - commercial, bureaux, résidentiel
×
×
  • Create New...
adblock_message_value
adblock_accept_btn_value