ville-marie 900, rue Saint-Jacques – 62 étages


Recommended Posts

Pinned posts

900, rue Saint-Jacques — Terrain au coin des rues Saint-Jacques et de l'Inspecteur (Canvar)

image.png
Lot 1 179 341

Citation

Nom : 
Emplacement :
 900, rue Saint-Jacques (lot 1 179 341)
Hauteur en étages : 62 (basilaire de 10 étages)
Hauteur en mètres :
Coût d'acquisition du terrain
44 millions
Coût du projet :
Promoteur :
Canvar
Architecte : 
Entrepreneur général :
Début de construction :
Fin de construction : 
Site internet : 
Lien webcam :
Autres informations : 

  • Fiche de zonage http://www1.ville.montreal.qc.ca/CartesInteractives/ville-marie/doc/VM_4.PDF
  • Hôtel de 200 chambres dans le basilaire qui occupe les 10 premiers étages
  • 810 logements des étages 11 à 62, dont 52 unités de 2 chambres et aucune de 3 chambres (CCU exige une révision pour inclure des logements pour les familles)
  • Restaurant au RDC
  • 5 niveaux souterrains occupés par un stationnement pour 173 voitures et 268 vélos

Rumeurs :
Images du projet :


 

 

Link to post
Share on other sites
  • 7 months later...
  • Replies 517
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Le projet a en effet complètement changé, à 100% (changement de firme d'architectes, pour une firme très connue et très admirée de Montréal), et ce, pour le meilleur. Les critiques sont à même de deve

C'est exactement le projet dont je parlais. Et en gros, cette phrase signifie : "Changez d'architecte". On peut - et on DOIT - refuser carrément les projets qui ne sont pas à la hauteur, SURTOUT qua

Appellant: 'Allo je suis un geek de gratte-ciel sur MtlUrb et je me demandais si vous aviez un rendu à me montrer?' Canvar: 'Bien sûr, et on peut même vous donner le nombre d'étages officiels'

Posted Images

Il y a 1 heure, Megafolie a dit :

Sachant qu’il s’agit d’une tour principalement à vocation locative, je ne mettrait pas trop tes espoirs à la hauteur du mont Everest. Je viserais plutôt le mont St-Bruno, ainsi je ne pourrais qu’être surpris dans le bon sens. 😉

Malheureusement, avec ses 208m (ou 218m?), le Saint-Bruno demeurera plus grand. Au moins, ce sera plus grand que l'intrusion de Saint-André.

Link to post
Share on other sites
On 2020-09-08 at 6:10 PM, Yabucoa77 said:

September 7th. Saw a group of people (4) leaving this site today around 5:30.

20200908_171522.jpg

20200908_171453.jpg

I heard they were going to Les Princesses on Hochelaga/Viau.

Link to post
Share on other sites
  • 2 weeks later...
  • 3 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By swansongtoo
      I'm sure there's a thread for this piece of land but too lazy to look.
       
      In Saturday's Gazette a report on a new Preval projet on the former Franciscan church site.
       
      Suspects are apparently already complaining though that's a small piece of the report.
       
       
      MONTREAL - A vast tract of downtown land, left partially empty after the site’s historic Franciscan church was destroyed in a 2010 blaze, could be reinvented as two 18-storey condo towers.
       
      Groupe Prével, the developer that transformed the former Seville theatre near the old Forum into a sold-out multi-phase condo project, has an option to buy part of the site on the south side of René Lévesque Blvd., west of Fort St. and the entrance to Highway 720.
       
      The Prével project — which would include a 330-square-metre public park on part of the site — would require the city of Montreal to change the zoning from institutional to residential.
       
      “We’ve had internal discussions with the planning department and they seem positive about it,” said Jonathan Sigler, a co-founder of the urban condo developer, which has also built the Lowney project in Griffintown.
       
      “But obviously, this is going to go through a public consultation.”
       
      The project comes at a time when the city of Montreal, along with other local muncipalities, is under fire for fast-tracking residential development at the expense of green space and such services as schools and daycares in areas like Griffintown. Sigler said Prével’s project would balance development with the need for green space, by creating the park and maintaining the woods in the back of the site known as the jardin des Franciscains.
       
      “Nothing would be knocked out,” Sigler told The Gazette.
       
      But some residents in nearby Shaughnessy Village have already called on city officials to “firmly oppose the project” and come up with a plan oriented toward better public access to the site instead of for “building condo towers.”
       
      Through the deal with the Franciscans, Prével would acquire only part of the site, which includes two heritage buildings used by commercial tenants. The religious order, which first stepped foot in Quebec nearly 400 years ago, would continue to own these two buildings.
       
      The historic Franciscan church was destroyed in an early-morning fire more than three years ago. News reports said the religious order had ceased holding services at the aging church, and abandoned the building in 2007 because it couldn’t afford the $5 million in needed repairs.
       
       
      Read more: Montreal Gazette | Page Not Found
    • By IluvMTL
      Dans Sainte-Marie et en face du fleuve
      297 logements





       
       
       
    • By IluvMTL
      170-188, boul. René-Lévesque Est

      180 René-Lévesque Est
      Client : Hillpark Capital
      Architecte : NEUF Architect(e)s
      Le 180 René-Lévesque Est est une tour de 21 étages avec deux sous-sols à l’entrée du centre-ville de Montréal ayant une présence marquée parmi les bâtiments voisins de plus faible hauteur. La tour possède une dalle en tréfonds accueillant des arbres matures, ainsi qu’un podium au quatrième étage abritant une piscine pour les usagers de cette tour résidentielle. 
      PRINCIPAUX DÉFIS RELEVÉS :
      Conception d’un radier sur la totalité de l’empreinte du bâtiment en raison de la faible capacité portante du sol;
      Élaboration d’une stratégie de soutènement des terres afin d’éviter les ouvrages souterrains et permettant la reprise en sous-œuvre de deux bâtiments voisins de plus de trois étages.
      http://elema-ing.com/fr/projets/180-rene-levesque-est
       
       



×
×
  • Create New...