Jump to content

ville-marie 1230 Mansfield - 19 étages


Recommended Posts

Pinned posts

1230, rue Mansfield

1230 mansfield.jpg

Quote

Emplacement: 1230, rue Mansfield
Hauteur en étages: 
Hauteur en mètres: 
Coût du projet: 
Promoteur:
Brivia
Architecte: 
Entrepreneur général: 
Début de construction: 
Fin de construction: 
Site internet: 
Lien webcam: 
Autres images: 
Vidéo promotionnelle: 
Rumeurs: 
Autres informations:
Fermeture du gym en août 2019

 

 

Link to post
Share on other sites
  • 8 months later...
  • Replies 107
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Brivia a acheté l'immeuble du Mansfield Gym situé au 1230 Mansfield Street. Source: https://www.gascon.ca/en/2019/08/06/sale-of-the-building-housing-the-mansfield-athletic-club/ Le gym ferme

C'était très anglophone en 1974. One Place Ville-Marie 🤣 Thank god for la loi 101.

Posted Images

On dirait un vieux design de 1989. Post Moderne raté. Et pourquoi s'agencer exactement à la SunLife? On dirait une extension grotesque. Un édifice de verre aurait mis en valeur la SunLife.

Link to post
Share on other sites

Si cette fièvre de l’intégration (hauteur et architecture) avait toujours été présente on aurait jamais rien construit à Montréal. Ouf.

Link to post
Share on other sites

Chose certaine, les architectes comprennent Montréal et ne nient pas la réalité... la rue est bloqué par des cônes orange dans leur rendu !! 😆

 

2118303415_1230mansfield.jpg.6d07d7f15d2e845ab9bae5d8740f51f8.jpg

Link to post
Share on other sites

Par contre I always thought the BMO building on the corner was perfect for integration with a shiny skinny (minus the Telus blemish - whomever allowed that signage should be fired).

Link to post
Share on other sites

Puis ils vont démolir le bâtiment d'une ancienne grande dame de cinéma. Il me semble que les plafonds avaient été préservés.

Demandes de démolition

Le comité d’étude des demandes de démolition se réunira virtuellement le 15 juillet 2020, 17 h 30, afin de statuer sur les demandes de certificat d’autorisation de démolition. Vous pourrez suivre le déroulement de la séance par webdiffusion, en direct ou en différé.

https://ville-marie.evenement.agencewebdiffusion.com/

 

 

 

image.png

Link to post
Share on other sites
il y a 48 minutes, Ousb a dit :

Si cette fièvre de l’intégration (hauteur et architecture) avait toujours été présente on aurait jamais rien construit à Montréal. Ouf.

Parce qu’en 2020 on ne construit rien? 😉 

Sérieusement, je ne vois rien de mal à vouloir respecter et mettre en valeur le patrimoine qu’il nous reste. Des Sun Life, on n’en a pas à tous les coins de rue. Mais c’est vrai que pour le reste, faudrait peut-être avoir moins peur d’oser 🙂

Edited by muskmelon
Link to post
Share on other sites
il y a 11 minutes, SameGuy a dit :

minus the Telus blemish - whomever allowed that signage should be fired

That and the low quality of the renderings are an indication of amateurism. I was going to say that it looks like a student project, but that would be an insult to our universities for most of their students would have done much better in terms of quality and professionalism.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By swansongtoo
      I'm sure there's a thread for this piece of land but too lazy to look.
       
      In Saturday's Gazette a report on a new Preval projet on the former Franciscan church site.
       
      Suspects are apparently already complaining though that's a small piece of the report.
       
       
      MONTREAL - A vast tract of downtown land, left partially empty after the site’s historic Franciscan church was destroyed in a 2010 blaze, could be reinvented as two 18-storey condo towers.
       
      Groupe Prével, the developer that transformed the former Seville theatre near the old Forum into a sold-out multi-phase condo project, has an option to buy part of the site on the south side of René Lévesque Blvd., west of Fort St. and the entrance to Highway 720.
       
      The Prével project — which would include a 330-square-metre public park on part of the site — would require the city of Montreal to change the zoning from institutional to residential.
       
      “We’ve had internal discussions with the planning department and they seem positive about it,” said Jonathan Sigler, a co-founder of the urban condo developer, which has also built the Lowney project in Griffintown.
       
      “But obviously, this is going to go through a public consultation.”
       
      The project comes at a time when the city of Montreal, along with other local muncipalities, is under fire for fast-tracking residential development at the expense of green space and such services as schools and daycares in areas like Griffintown. Sigler said Prével’s project would balance development with the need for green space, by creating the park and maintaining the woods in the back of the site known as the jardin des Franciscains.
       
      “Nothing would be knocked out,” Sigler told The Gazette.
       
      But some residents in nearby Shaughnessy Village have already called on city officials to “firmly oppose the project” and come up with a plan oriented toward better public access to the site instead of for “building condo towers.”
       
      Through the deal with the Franciscans, Prével would acquire only part of the site, which includes two heritage buildings used by commercial tenants. The religious order, which first stepped foot in Quebec nearly 400 years ago, would continue to own these two buildings.
       
      The historic Franciscan church was destroyed in an early-morning fire more than three years ago. News reports said the religious order had ceased holding services at the aging church, and abandoned the building in 2007 because it couldn’t afford the $5 million in needed repairs.
       
       
      Read more: Montreal Gazette | Page Not Found
    • By IluvMTL
      Dans Sainte-Marie et en face du fleuve
      297 logements





       
       
       
    • By IluvMTL
      170-188, boul. René-Lévesque Est

      180 René-Lévesque Est
      Client : Hillpark Capital
      Architecte : NEUF Architect(e)s
      Le 180 René-Lévesque Est est une tour de 21 étages avec deux sous-sols à l’entrée du centre-ville de Montréal ayant une présence marquée parmi les bâtiments voisins de plus faible hauteur. La tour possède une dalle en tréfonds accueillant des arbres matures, ainsi qu’un podium au quatrième étage abritant une piscine pour les usagers de cette tour résidentielle. 
      PRINCIPAUX DÉFIS RELEVÉS :
      Conception d’un radier sur la totalité de l’empreinte du bâtiment en raison de la faible capacité portante du sol;
      Élaboration d’une stratégie de soutènement des terres afin d’éviter les ouvrages souterrains et permettant la reprise en sous-œuvre de deux bâtiments voisins de plus de trois étages.
      http://elema-ing.com/fr/projets/180-rene-levesque-est
       
       



×
×
  • Create New...