Jump to content

Recommended Posts

L'Ontario s'inspire du REM!

Metrolinx and Infrastructure Ontario release Initial Business Case for Ontario Line subway
https://blog.metrolinx.com/2019/07/25/metrolinx-and-infrastructure-ontario-release-initial-business-case-for-ontario-line-subway/

zoom-ontario-line-20190718-1.png?w=1352

 

  • Fully automated, driverless trains with modern signalling that enables high frequency service
  • Similar technology being used in Paris, London and Singapore
  • Shorter trains and platforms approximately 100 metres in length
  • Up to 6 km of the route to be elevated or at grade in existing rail corridors, isolated from traffic which helps to significantly lower the cost of the project.
  • Up to 40 trains per hour, 90 seconds apart vs every two minutes, providing shorter wait times

Details:
https://metrolinx.files.wordpress.com/2019/07/click-here-to-view-the-ontario-line-initial-business-case.pdf

Link to post
Share on other sites
  • 10 months later...
  • 6 months later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...
adblock_message_value
adblock_accept_btn_value