Jump to content

ville-marie Démantèlement de l'antenne de la Tour CIBC


Recommended Posts

Pinned posts

Démantèlement de l'antenne de la Tour CIBC

Citation

http://blog.fagstein.com/2018/01/21/cogeco-hd-radio/

CKOI: The days of Montreal’s most powerful radio transmitter are numbered. The 307,000-watt signal, grandfathered at that power when the federal government imposed a 100kW limit on FM stations in the 1960s, is being replaced by a new transmitter on the Mount Royal Antenna, that will be higher up but lower power (147kW) so its pattern doesn’t extend beyond its current one.

Lachance said the plan is to make the move this year, probably around June. After that, the existing transmitter and antenna on the CIBC building at Peel St. and René-Lévesque Blvd. downtown will likely be torn down. CKOI’s backup transmitter, and others for Cogeco stations and some Bell stations, is in Laval’s Auteuil district.

Most people won’t notice a change. But Cogeco believes the higher antenna will mean less interference from large buildings and the mountain itself.

Other Cogeco stations have applied for and gotten permission to increase to the maximum 100kW. The transmitter for CHMP 98.5 has already been increased. The Beat 92.5 (CKBE-FM) remains at 41kW and its upgrade, though approved, isn’t scheduled in the short term.

 

Link to post
Share on other sites
  • 10 months later...
  • Replies 61
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Puisque la fin approche pour cette antenne, ce qui est très regrettable, j’ai trouvé quelques photos prises par de braves hommes arraignés non-identifiés. Je n’ai pas pu retracer leur auteur, mais ell

Cette antenne est sur cet édifice depuis presque toujours. L enlever est synonyme d enlever une partie de l histoire de l immeuble et même de Montréal. Cette antenne a vu énormément des bons et mauvai

I always liked the effect of PVM's rotating lights as they hit the antenna atop CIBC.  

Posted Images

  • Administrator

Salut tout le monde, un petit scoop de source sûre. 

L’antenne sers enlevée ce printemps puisque son client principal ne veut plus le maintenir :/ 

Link to post
Share on other sites
  • 1 year later...
il y a 10 minutes, Rocco a dit :

C'est pas cette antenne qu'il fallait enlever, mais bien l'horrible qui est sur le Mont Royal. Bâtard.

unnamed-1.jpg

2014_IMG_3640.jpg

T'aimes pas notre version de la tour de Sauron ? Il manque juste son oeil et c'est presque sa jumelle...

Link to post
Share on other sites
Il y a 11 heures, Rocco a dit :

C'est pas cette antenne qu'il fallait enlever, mais bien l'horrible qui est sur le Mont Royal. Bâtard.

unnamed-1.jpg

2014_IMG_3640.jpg

Moi aussi je déplore la disparition de l'antenne de la CIBC qui fait partie de la ligne d'horizon depuis les années 60. Aurait-on pu la protéger au titre de patrimoine bâti contemporain? Pas évident... 

Quant à l'antenne du Mont-Royal http://spacing.ca/montreal/2013/12/03/le-monument-inconnu/cette mal aimée est une structure encore utile aujourd'hui qui appartient à la SRC. On a voulu plusieurs fois la remplacer par quelque chose de plus élégant, sans succès. Ici c'est la fonctionnalité qui domine dans tous les sens du terme.

Paradoxalement on aurait voulu protéger l'antenne de la CIBC, mais voir disparaitre l'autre que l'on trouve envahissante. On peut certainement se poser la question suivante: aurait-on pu construire ce genre de structure aujourd'hui étant donné la protection patrimoniale du Mont-Royal?

Quoi qu'il en soit le droit acquis de la SRC relève du fédéral, elle ne risque donc pas de disparaitre de sitôt du paysage montréalais, à moins qu'une nouvelle technologie soit découverte un jour et la rendre obsolète. 

 

Link to post
Share on other sites
24 minutes ago, Gjm127 said:

Savez-vous si ils vont arrêter là et simplement réduire sa hauteur ou vont-ils complètement l'enlever ?

Gone. Adios. Sayonara.

Link to post
Share on other sites
  • 2 weeks later...

Ce que j'aimais de cette antenne c'est que ça m'aidais à visualiser ce qu'une tour de 250 mètres aurait d'lair dans notre slyline!  Je peux vous confirmer que cette antenne était censé être dématelée à partir de l'automne 2018, mais pour plusieurs raisons, ça été retardé à cet été!

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By swansongtoo
      I'm sure there's a thread for this piece of land but too lazy to look.
       
      In Saturday's Gazette a report on a new Preval projet on the former Franciscan church site.
       
      Suspects are apparently already complaining though that's a small piece of the report.
       
       
      MONTREAL - A vast tract of downtown land, left partially empty after the site’s historic Franciscan church was destroyed in a 2010 blaze, could be reinvented as two 18-storey condo towers.
       
      Groupe Prével, the developer that transformed the former Seville theatre near the old Forum into a sold-out multi-phase condo project, has an option to buy part of the site on the south side of René Lévesque Blvd., west of Fort St. and the entrance to Highway 720.
       
      The Prével project — which would include a 330-square-metre public park on part of the site — would require the city of Montreal to change the zoning from institutional to residential.
       
      “We’ve had internal discussions with the planning department and they seem positive about it,” said Jonathan Sigler, a co-founder of the urban condo developer, which has also built the Lowney project in Griffintown.
       
      “But obviously, this is going to go through a public consultation.”
       
      The project comes at a time when the city of Montreal, along with other local muncipalities, is under fire for fast-tracking residential development at the expense of green space and such services as schools and daycares in areas like Griffintown. Sigler said Prével’s project would balance development with the need for green space, by creating the park and maintaining the woods in the back of the site known as the jardin des Franciscains.
       
      “Nothing would be knocked out,” Sigler told The Gazette.
       
      But some residents in nearby Shaughnessy Village have already called on city officials to “firmly oppose the project” and come up with a plan oriented toward better public access to the site instead of for “building condo towers.”
       
      Through the deal with the Franciscans, Prével would acquire only part of the site, which includes two heritage buildings used by commercial tenants. The religious order, which first stepped foot in Quebec nearly 400 years ago, would continue to own these two buildings.
       
      The historic Franciscan church was destroyed in an early-morning fire more than three years ago. News reports said the religious order had ceased holding services at the aging church, and abandoned the building in 2007 because it couldn’t afford the $5 million in needed repairs.
       
       
      Read more: Montreal Gazette | Page Not Found
    • By IluvMTL
      Dans Sainte-Marie et en face du fleuve
      297 logements





       
       
       
    • By IluvMTL
      170-188, boul. René-Lévesque Est

      180 René-Lévesque Est
      Client : Hillpark Capital
      Architecte : NEUF Architect(e)s
      Le 180 René-Lévesque Est est une tour de 21 étages avec deux sous-sols à l’entrée du centre-ville de Montréal ayant une présence marquée parmi les bâtiments voisins de plus faible hauteur. La tour possède une dalle en tréfonds accueillant des arbres matures, ainsi qu’un podium au quatrième étage abritant une piscine pour les usagers de cette tour résidentielle. 
      PRINCIPAUX DÉFIS RELEVÉS :
      Conception d’un radier sur la totalité de l’empreinte du bâtiment en raison de la faible capacité portante du sol;
      Élaboration d’une stratégie de soutènement des terres afin d’éviter les ouvrages souterrains et permettant la reprise en sous-œuvre de deux bâtiments voisins de plus de trois étages.
      http://elema-ing.com/fr/projets/180-rene-levesque-est
       
       



×
×
  • Create New...