Ottawa O-Train LRT


p_xavier

Messages recommendés

  • 2 semaines plus tard...
il y a une heure, denpanosekai a dit :

This is gonna suck even more with snow, no?

That's my station. It is open air, so the icy winds will not be pleasant. Hopefully the stairs won't get too slushy/icy. I use the east stairs which seem to be better covered.  The train service is good so far. I get downtown very quickly.  However; the underground stations have foul smells permeating them, the cement  finishing and ugly tile  on the walls underground are low budget. The elevator servicing parlement station at street level is a nice touch. We will see Oct 7 how the system copes with full ridership since the parallel bus service will be completely eliminated by then. Apparently the terminal stations are very chaotic at rush hour. Hopefully this disapears when phase 2 opens; however that will be at least 4-5 years down the road if all goes to plan.

  • Like 1
Lien vers le commentaire
Partager sur d’autres sites

5 minutes ago, Le Roach said:

.However; the underground stations have foul smells permeating them,

Bof ça n’est pas tellement différent ou plus fort que l’odeur d’innombrables stations à travers le monde qui sont exposées aux odeurs des rivières sous-terraines (Beaubien, par exemple). D’ailleurs Lyon ne sent pas et Rideau beaucoup moins que Parlement.

Lien vers le commentaire
Partager sur d’autres sites

  • 2 semaines plus tard...

Campagne de peur par le Journal de Montréal? 

Ottawa = train léger
Montréal = métro 

https://www.tvanouvelles.ca/2019/10/11/de-gros-problemes-pour-les-artisans-du-rem-a-ottawa-1

De gros problèmes pour les artisans du REM à Ottawa

Philippe Orfali - Le Journal de Montréal
Publié le 11 octobre 2019 à 05:57 - Mis à jour à 06:00

557e971c-0a70-4e1a-ae2e-8849dfb6467f_16x

Construit par SNC-Lavalin et Alstom et livré avec 456 jours de retard, le nouveau train léger d’Ottawa connaît une pénible entrée en service qui laisse présager le pire pour le REM.

Réalisé au coût de 2,1 milliards de dollars par un consortium mené par la montréalaise SNC-Lavalin et la française Alstom, l’O-Train devait permettre à Ottawa d’entrer dans une « nouvelle ère » de transport en commun.

Or, depuis que la ligne de la Confédération est entrée en fonction, il y a une dizaine de jours, l’heure de pointe se transforme en chaos pratiquement tous les matins.

Ligne entière paralysée

Au banc des accusés : les trains construits par Alstom, comme ceux du futur Réseau express métropolitain de la Caisse de dépôt et placement du Québec. Rien que cette semaine, des problèmes avec le système de portes ou les ordinateurs qui les régissent ont causé des interruptions de service mardi, mercredi et hier, paralysant toute la ligne de train léger.

Lorsqu’un passager tente d’empêcher la fermeture des portes, c’est tout le système qui flanche, ont expliqué les responsables municipaux.

« Nos clients méritent mieux et ils ont droit d’être frustrés. On travaille très fort avec le consortium pour restaurer la fiabilité et la confiance dans la ligne de la Confédération », a expliqué en conférence de presse le directeur général d’OC Transpo, John Manconi.

Il a notamment demandé aux Ottaviens de cesser de retenir les portes du véhicule. Mais il n’est pas normal que toute la ligne tombe en panne pour une porte mal fermée, a-t-il reconnu.

La situation est tellement critique que la Ville songe à relancer temporairement son service d’autobus vers le centre-ville en raison de l’ampleur du problème, le temps qu’Alstom et le consortium trouvent une solution.

« Personne n’est en train de se dire “prenons ce train et renvoyons-le à Alstom”. On sait qu’on peut régler ce problème. Mais c’est tellement pénible en ce moment parce que ça empêche les gens de se rendre au travail à temps, et de rentrer à la maison », a déploré le conseiller municipal Allan Hubley.

Le REM à risque ?

SNC-Lavalin et Alstom ont refusé de répondre aux questions du Journal, hier. Chez CDPQ Infra, on affirme suivre la situation de près, bien que le REM ne sera pas équipé du même modèle de train qu’Ottawa.

De plus, les quais du REM compteront des portes palières s’ouvrant après celles du train afin de renforcer la sécurité des usagers et la fiabilité du service, a précisé le porte-parole Jean-Vincent Lacroix.

Le ligne de la confédération de l'O-Train

  • Bâtie au coût de 2,1 milliards $ par un consortium comptant SNC-Lavalin et Alstom, également impliquées dans la construction et l’exploitation du REM de Montréal
  • 454 jours de retard
  • 34 tram-trains Citadis Spirit (le REM sera équipé de rames de métro léger automatisé Metropolis)
Lien vers le commentaire
Partager sur d’autres sites

  • 5 semaines plus tard...
  • 1 mois plus tard...

https://www.railwayage.com/passenger/light-rail/high-capacity-light-rail/

Tout comme le mode de transport, le service efficace est une chimère à date 

 

Quote

 

High Capacity Light Rail

Written by William C. Vantuono, Editor-in-Chief

Tunney’s Pasture Station. All photos by William C. Vantuono, except where noted.

RAILWAY AGE, DECEMBER 2019 ISSUE: If legendary New York Yankees catcher Yogi Berra were to ride Ottawa’s new Confederation Line, he would say—provided he was familiar with the old North Shore’s Electroliners or Philadelphia Suburban Transportation Co.’s Liberty Liners—“It’s déjà vu all over again.”

Berra’s famous malapropisms aside, OC Transpo may have come to a fork in the road and taken it in selecting what is best described as hybrid rail transit technology for the Confederation Line. In the traditional sense, it’s not light rail. Nor is it rapid transit. It’s High Capacity Light Rail, or HCLR, to coin a new acronym. But because a portion, in Ottawa’s Central Business District, is underground, some at OC Transpo call it High Capacity Light Subway (HCLS).

Suffice to say, the Confederation Line—with up to 180,000 weekday riders, the busiest single-line LRT in North America—combines characteristics of both:

• Four-section-articulated, 100% low-floor, 49-meter (160.8 feet)-long, 600-person-capacity Alstom Citadis Spirit vehicles, operated in pairs totaling 98 meters (321.6 feet). Eventually, they will be extended to 118 meters (387 feet) by adding a fifth section to one of the cars in each trainset. The vehicles have an on-demand door-opening mode, activated by the driver, for use in extreme cold to assist in maintaining the vehicle’s internal temperature. Passengers can activate the doors when the vehicle is stopped in a station. OC Transpo’s vehicles have been compared to the Electroliners, as they are similar in size and configuration.

• Continuous ATC (Automatic Train Control) and ATO (Automatic Train Operation) with driverless capability through an RF (radio frequency)-based Thales SelTrac™ moving-block CBTC (Communications-Based Train Control) system. RF antennas are located at both ends of the trainset; transponders determine vehicle position. Speed sensors and accelerometers determine fine positioning. Wayside RF antennas are spaced 200 meters (656 feet) apart, with overlap redundancy to ensure continuous signal propagation. It is the latest iteration of SelTrac™.

SelTrac™ transponder.

•  Headways of approximately 4 minutes, 7 seconds with the current 13-trainset fleet. Four additional trainsets, bringing the Citadis Spirit fleet to 17 (34 cars), will reduce headways to approximately 3 minutes, 20 seconds. A full complement of 19 trainsets will offer even tighter headways (the CBTC system is capable of supporting 1 minute, 45 seconds).

• Maximum operating speed of 80 kph (50 mph). No highway-rail grade crossings.

• 8,000 PPHPD (people per hour, per direction) capacity, increasing to 11,000 once all vehicles are in service.

Station information display with receptacles for waste and various types of recyclables—a sustainable standard in Canada. U.S. transit systems should do the same.

The Confederation Line (Line 1) opened to revenue passengers on Sept. 14, 2019. The name reflected the original hope of starting service in 2017, the 150th anniversary of Canada becoming a nation. The project cost an estimated C$2.1 billion, making it the largest infrastructure project in Ottawa’s history. The bulk of the cost was for construction, as most of the property needed was publicly owned.

A wetsbound train pulls into underground Rideau Centre Station in Ottawa’s Central Business District.

Ottawa signed a 30-year DBFM (Design-Build-Finance-Maintain) agreement with the Rideau Transit Group (SNC-Lavalin, ACS Infrastructure Canada Inc. and EllisDon). OC Transpo operates the system with its own employees. Ottawa City Council approved the Confederation Line in December 2012, with construction beginning the following year. This followed many years of study and debate, including the awarding, then cancellation, of a contract for a completely different route to south Ottawa.

OC Transpo Operations Control Center Manager Joel Lemieux explains the Confederation Line dispatching display. The Center controls all OC Transpo rail, bus and paratransit services.

The argument frequently arose as to whether or not Ottawa had the population to warrant a rail transit system. However, steady growth—population has doubled, from 500,000 30 years ago to 1 million today—coupled with the lack of a comprehensive urban expressway system, ultimately green-lighted the project.

The Confederation Line’s western half is built in a converted BRT (bus rapid transit) right-of-way. During the 1970s and 1980s, Ottawa had built an extensive BRT system, dubbed the Transitway. The western section of this was built on an abandoned Canadian Pacific line. Clearances, stations and bridges were designed for ultimate conversion to LRT, although after construction began, numerous rebuildings proved necessary. Part of the eastern section of the LRT is in the right-of-way of Highway 417.

View from the cab, looking east, at the Confederation Line’s western terminus at Lincoln Fields.

The original plan was to lay tracks on streets through downtown Ottawa. However, strong objections from local merchants resulted in a 1.5-mile tunnel under Queen Street through this area. There are three underground stations, with 390-foot platforms. Surface stations are 300 feet long, with provision for future extension. The above-ground stations are quite elaborate, somewhat similar to Calgary’s LRT.

The 34-car Citadis Spirit fleet represents Alstom’s first North American LRV order. The carbodies were constructed at Alstom’s Hornell, N.Y., plant; final assembly occurred at OC Transpo’s Belfast Yard shop, in Ottawa. The facility is near the line’s approximate halfway point. The vehicles draw traction power from 1,500 VDC overhead catenary. The low-floor design and overhead power collection permit future on-street alignments.

The Confederation Line interfaces with the existing north-south OC Transpo Trillium Line (Line 2) DMU operation at Bayshore Station. However, the two operations are at different levels. Tremblay Station, just east of downtown, serves VIA Rail intercity trains.

An unusual feature of the Confederation Line is the use of a “guard” at stations, even with ATO. Before the driver pushes the start button to get under way after a station stop, the guard, positioned at the front of the train on the platform, checks to make sure the platform is clear. If the train is good to go, the guard blows a pocket whistle, giving the driver the all-clear. This is useful, because even though the trains are equipped with CCTV and external cameras, they’re very long (more than the length of a football field), and it’s sometimes difficult for the driver to monitor the entire platform. Ottawa transit users, used to short buses, are still adapting to frequent, fast rail service. So, use of a whistle-blowing platform guard is an effective, albeit quaint, safety practice.

BUILDOUT TO 2025

It was always intended to extend the Confederation Line eastward and westward after the initial section was open. Ottawa City Council approval has been given, contracts awarded, and work has begun.

An eastward 13-km (8-mile) extension will take service to Trim Road, in Ottawa’s far eastern suburbs. It will be a surface alignment, in the median of Highway 174, and includes five new stations. Opening is scheduled for 2024.

A westward 15.5-km (9.5-mile) extension will add 11 stations. This line will split at Lincoln Fields Station. One branch, terminating at Baseline Road, will serve Algonquin College. The other, terminating at Moodie Drive Station, will serve western Ottawa. The latter will connect with the Southwest and West Transitways. A yard and light maintenance facility is planned near the Moodie terminal. Part of the route will be built in an existing Transitway, while other sections are to be tunneled. Opening is planned for 2025.

Maximum operating speed on the extensions will be 100 kph (62 mph).

The Trillium Line will be also be extended from its current terminus at Greenborough. Just south of there, at South Keys, it will split. One segment will go directly into Ottawa International Airport; the other will terminate at Limebank. Stations will be doubled in length to 80 meters (262 feet) to accommodate on-order Stadler FLIRT DMUs or two existing Alstom Coradia LINT DMUs, which will operate in pairs.

Alstom Coradia LINT DMU on the Trillium Line. Alstom photo.

Stadler FLIRT DMU for the OC Transpo Trillium Line.

An additional 38 Alstom Citadis Spirit LRVs have been ordered for Phase Two. The first 13 are being assembled at the 16-acre Belfast Road shop, with the balance to be finished at Alstom’s new plant in Brampton, Ontario. This will allow Belfast Road to focus on day-to-day maintenance of the operational fleet.

A BIT OF HISTORY

The Electroliners were a pair of streamlined, four-unit-articulated EMU (electric multiple-unit) interurban trainsets operated by the Chicago North Shore & Milwaukee Railroad between Chicago and Milwaukee. St. Louis Car Company built them in 1941. The Electroliners operated at speeds up to 90 mph. When the North Shore shut down in 1963, Philadelphia Suburban Transportation Co., known as the Red Arrow Lines, purchased and renamed them Liberty Liners. The trolley poles and steps were removed, new doors were added in the center coach sections, and third-rail contact shoes were installed for operation on the Philadelphia & Western (today’s Norristown High Speed Line), where they ran until 1978, when SEPTA retired them.

SelTrac™ was originally developed in the 1970s by Standard Elektrik Lorenz of Germany for the Krauss-Maffei Transurban, an automated guideway transit system proposed for the GO-Urban network in Ontario, Canada’s Greater Toronto Area. Although the GO-Urban project was never built, the Transurban technology was acquired by an Ontario consortium led by the Urban Transportation Development Corporation (UTDC), and adapted to become its Intermediate Capacity Transit System (ICTS). This technology was first used on the SkyTrain network in Vancouver, B.C., and the Scarborough Rapid Transit in Toronto. SelTrac™ was primarily supplied and developed by Alcatel, through a Toronto-based subsidiary. It is now supplied by Thales, after the company purchased many of Alcatel’s non-telecommunications assets. New versions have been developed for different markets, and today SelTrac™ is used for train control systems around the world. The original SelTrac™ system was based on inductive loops that provided a communications channel as well as positioning information. In the newest, modular version, the control signal is transmitted at 2.4 GHz.

Canadian Contributing Editor John Thompson contributed to this story. 

Categories: C&S, Light Rail, News, Passenger, Rapid TransitTags: Alstom Citadis Spirit, Breaking News, Confederation Line, OC Transpo, Thales

 

 

Lien vers le commentaire
Partager sur d’autres sites

  • 2 semaines plus tard...

https://www.lapresse.ca/actualites/national/201912/25/01-5254951-train-leger-dottawa-les-francos-davantage-seduits-que-les-anglos.php

(Ottawa) Un sondage mené pour le compte du gouvernement fédéral révèle un fossé linguistique concernant le nouveau système de train léger à Ottawa.

Publié le 25 décembre 2019 à 17h01
LA PRESSE CANADIENNE

Le sondage, effectué au printemps à la demande Bureau du Conseil privé et récemment publié en ligne, montre que les francophones jugent plus favorablement ce nouveau moyen de transport que les anglophones.

Les anglophones ayant participé au sondage ont déclaré que l’O-Train était bon pour la ville dans son ensemble, mais pas si important pour eux personnellement.

Les francophones ont quant à eux déclaré que l’O-Train était important pour leurs déplacements personnels, notamment en raison de l’abolition de plusieurs lignes d’autobus au moment de la mise en service du train léger.

Le sondage a été mené avant le lancement de l’O-Train en septembre. Le train léger, qui a coûté 2,1 milliards — dont 600 millions fournis par le gouvernement fédéral — a connu quelques difficultés dans les premiers mois.

Bien que le service se soit amélioré depuis, certains problèmes persistent.

Des portes coincées ont forcé l’immobilisation des trains, les concepteurs du système n’ont toujours pas réussi à comprendre la source des failles dans les ordinateurs de bord des locomotives, et des usagers se sont plaints des mauvaises odeurs à la station située près de la colline du Parlement. Les autorités municipales ont récemment affirmé que les odeurs provenaient d’un égout endommagé lors des travaux de construction de la ligne de train.

Lien vers le commentaire
Partager sur d’autres sites

  • 4 semaines plus tard...

https://www.theglobeandmail.com/canada/article-ottawa-blames-private-partner-as-fewer-trains-running-on-new-transit/

Ottawa blames private partner as fewer trains running on new transit line

OTTAWA
THE CANADIAN PRESS
PUBLISHED 1 HOUR AGO

 

Riders on Ottawa’s problem-plagued light-rail system are having another rough morning, with the city’s transit agency saying only eight of the usual 13 trains on the downtown line in service.

The city is blaming the company it hired to design, build and maintain the line, which opened last fall.

Since then, the system been repeatedly brought to a halt by problems with stuck doors on trains.

And just in the last week, parts of the line have been shut down by a snapped power cable and switches that didn’t work in a weekend snowstorm.

And now the transit agency OC Transpo is warning that platforms and trains will be extra crowded and waits will be extra long today because an array of separate problems is keeping more than half of its 17 trains off the tracks.

The agency says it’s billing the maintenance company for replacement buses, but there aren’t enough of those to keep up with the need.

Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.


Countup


×
×
  • Créer...