Aller au contenu

mtlurb

Messages recommendés

On 2021-10-03 at 9:59 PM, Kotar said:

That makes no sense from a fleet management perspective. Why would they want to have two different sets everything. Parts, mechanics, facilities. Even if the two lines don't connect, having the same design is a benefit on almost every front. The way that the CDPQI pinches pennies, I would be flabbergasted if they were different trains. 

They can still specify during the tendering that they require them to be compatible with the current fleet's maintenance standards. It's more about the aesthetic aspect of the train. 

In Japan having different rolling stock for different lines ran by a single operator (such as Tokyo Metro) is common practice and does not seem to be a burden in terms of maintenance, therefore I would not see why we could not do the same here.

  • Like 1
Lien vers le commentaire
Partager sur d’autres sites

Le 2021-10-09 à 14:30, Decel a dit :

Nos vieilles écoles ou le 3e lien ?

https://www.lapresse.ca/affaires/chroniques/2021-10-09/que-peut-on-se-payer-avec-10-milliards/nos-vieilles-ecoles-ou-le-3e-lien.php

Le 3e lien dans l'entête, mais on compare aussi au REM de l'Est

Bel article de manipulation émotionnelle.

  • Like 2
Lien vers le commentaire
Partager sur d’autres sites

Il y a 10 heures, Julpyz a dit :

Quand même fou... je me demandais si ce projet allait être ralenti considérablement suite aux nombreuses protestations et pourtant, cette annonce indique clairement que la Caisse va de l'avant et avance.

Lien vers le commentaire
Partager sur d’autres sites

I’m not sure anyone in 2015 realized they were given the keys to the kingdom. REM-A was a testbed to see just how much they could get away with — a LOT — so REM-B will be bulldozed into being with no consultation or concession.

  • Like 1
  • Sad 1
Lien vers le commentaire
Partager sur d’autres sites

Il y a 12 heures, SameGuy a dit :

I’m not sure anyone in 2015 realized they were given the keys to the kingdom. REM-A was a testbed to see just how much they could get away with — a LOT — so REM-B will be bulldozed into being with no consultation or concession.

They already changed things after consultations, don't be in bad faith.

  • Like 2
  • Haha 1
Lien vers le commentaire
Partager sur d’autres sites

13 hours ago, champdemars said:

Quand même fou... je me demandais si ce projet allait être ralenti considérablement suite aux nombreuses protestations et pourtant, cette annonce indique clairement que la Caisse va de l'avant et avance.

ou... c'est une manœuvre politique et de relations publiques pour mettre de la pression (aka bullying)

  • Like 2
Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Créer...