Flynnster

montréal Abribus - STM

Recommended Posts

All new shelters have the solar panel, even a couple before the new design had them to provide power to the lights in the cabin at night.

Project started around 2009 IIRC

Share this post


Link to post
Share on other sites
7 hours ago, Flynnster said:

I just I take this photo of solar panels on our bus shelter, It’s would be nice if this is the norm. 

9A637CEA-9F06-4EC6-9F96-7397491B0CFB.jpeg

They should put a tv in them since we have to wait so [email protected]#$ing long for buses ,when they decided to show up at there scheduled time. ya 108 yesterday bus didn't show up had to wait for the next one.People were saying its because of the pending strike,that they are not repairing them.So bus shortage.

Share this post


Link to post
Share on other sites
7 hours ago, montreal66 said:

All new shelters have the solar panel, even a couple before the new design had them to provide power to the lights in the cabin at night.

Project started around 2009 IIRC

J'ai jamais vu ce panneau solaire de cette façon avant deux semaines sur Papineau. Un nouveau modèle?

Share this post


Link to post
Share on other sites
il y a 30 minutes, p_xavier a dit :

J'ai jamais vu ce panneau solaire de cette façon avant deux semaines sur Papineau. Un nouveau modèle?

Non c'est en installation depuis un bon 2 ans sur les abribus Quebecor qui ne sont pas relié au réseau électrique. Même que l'hiver dernier j'ai remarquer que le pente n'est pas assez prononcer ce qui fait que la neige s'accumule sur le dessus et donc empêche l'accumulation d'énergie.

Share this post


Link to post
Share on other sites
1 minute ago, berlude said:

Non c'est en installation depuis un bon 2 ans sur les abribus Quebecor qui ne sont pas relié au réseau électrique. Même que l'hiver dernier j'ai remarquer que le pente n'est pas assez prononcer ce qui fait que la neige s'accumule sur le dessus et donc empêche l'accumulation d'énergie.

Bien c'est assez récent alors, comparativement à 2009...

Share this post


Link to post
Share on other sites
On 2018-09-13 at 1:11 PM, p_xavier said:

Bien c'est assez récent alors, comparativement à 2009...

La STM avait un projet avec des panneau sollaires sur les abribus. il faut pas oubier que Quebecor ont recentment acheter le design des abribus, les premiers etait concu par la stm. la stm enteretien que leur abribus maintenant et en installe plus. quand il est du a etre remplcer, cest quebecor qui le fait et qui le maintient apres.

Share this post


Link to post
Share on other sites
Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Similar Content

    • By mtlurb
      Prolongement de la ligne bleue vers l'est

      Prolongement de la ligne bleue vers l'est. La mise en chantier est prévue en 2022, pour une livraison en 2026. Connexion avec le SRB Pie-IX, stationnement de 1200 places aux Galeries d'Anjou. Coût évalué à 3.9 milliards de dollars.
      Le projet en chiffres 
      5 nouvelles stations de métro accessibles, pour une longueur de tunnel de 5,8 km 2 terminus d’autobus et 1 stationnement incitatif de 1 200 places 1 tunnel piétonnier souterrain assurant le lien avec le futur SRB Pie-IX Plusieurs infrastructures opérationnelles : 6 structures auxiliaires renfermant des équipements nécessaires à l’exploitation, 1 poste de district, 1 garage de métro, 1 centre d’attachement hébergeant des véhicules d’entretien des voies et 1 centre de service pour l’entretien des infrastructures Budget estimé de 3,9 G$ Échéancier préliminaire
      Début 2019 : début de la conception des plans et devis.  Printemps 2019 : approbation du mode de réalisation, du plan budgétaire et de l’envergure du projet. Fin 2019 : début de travaux préparatoires sur certains sites. Début 2020 : démarrage des processus de changement de zonage et de consultations publiques.   2021 : dépôt du dossier d’affaires, lancement de la construction des nouvelles infrastructures. 2026 : inauguration du nouveau tronçon. Information : http://www.stm.info/fr/a-propos/grands-projets/grands-projets-metro/prolongement-ligne-bleue
      Consultations publiques : http://www.stm.info/fr/consultations/prolongement-de-la-ligne-bleue
        
       
    • By SkahHigh
      Fil de discussion sur les travaux du tunnel Mont-Royal dans le cadre du REM.

    • By ScarletCoral
      Discussion générale sur l'illumination des édifices et infrastructures de Montréal 
      En passant, Montréal n'a pas de plan lumière à l'exception du Quartier des spectacles et du Vieux-Montréal

      Voir ici un reportage au Téléjournal 18h  de Nabi-Alexandre Chartier (Ça fait toujours drôle de voir à Radio-Canada depuis ses débuts à Musique Plus!!)
       
       
    • By ScarletCoral
      Valérie Mahaut et son équipe de l'Université de Montréal ont recensé tous les anciens cours d'eau et plans d 'eau de l'île de Montréal. 
      On peut consulter les cartes ici : https://papyrus.bib.umontreal.ca/xmlui/handle/1866/16311 

      Très intéressant pour expliquer pourquoi les fondations de certains projets prennent du temps à construire.
    • By IluvMTL
      https://ici.radio-canada.ca/nouvelle/1136958/parc-automobile-agglomeration-voitures-vehicules?fbclid=IwAR1o1mYJdYbsfGoomVM14xorfEMiTzviEr1O11iNk3Oa5hTX4A43c05_w98
      En route vers le million de véhicules immatriculés sur l'île de Montréal
      Publié aujourd'hui à 11 h 53Mis à jour à 12 h 24 Congestion routière sur le pont Jacques-Cartier, à l'heure de pointe matinale à Montréal. Photo : Radio-Canada/Simon-Marc Charron
        L'île de Montréal comptera bientôt plus d'un million de voitures, à en croire les plus récentes statistiques de la Société de l'assurance automobile du Québec (SAAQ).
      Un texte de Jérôme Labbé
      Les chiffres relayés lundi par le bulletin Montréal en statistiques indiquent que le parc automobile de la métropole continue de croître, et non l'inverse.
      Ainsi, l'île de Montréal comptait 968 466 véhicules immatriculés en 2017, en hausse de 1,64 % par rapport à 2016. C'est la plus forte augmentation enregistrée depuis 2004, alors que le même territoire comptait 115 000 véhicules en moins.
      Depuis 13 ans, près de 9000 véhicules s'ajoutent au parc automobile montréalais chaque année, calcule la SAAQ.
      Cette hausse provient surtout des véhicules de promenade. Car si le nombre d'automobiles décroît un peu chaque année depuis le début des années 2010, celui des camions légers – une catégorie qui englobe notamment les véhicules utilitaires sport (VUS) – a plus que doublé depuis 2004.
      En fait, il y a maintenant un camion léger pour deux automobiles à Montréal.
      Quant aux véhicules institutionnels, professionnels ou commerciaux, ils connaissent sensiblement le même phénomène – réduction des automobiles et augmentation des camions légers – avec comme résultat un nombre total relativement stable, autour de 150 000.
      À noter que le nombre de taxis, lui, a légèrement diminué au fil des ans, passant de 3489 en 2004 à 3190 l'an dernier.
      La faute à la croissance
      La SAAQ remarque que la fluctuation du prix de l'essence influence généralement le nombre de véhicules immatriculés à Montréal : plus les prix à la pompe augmentent, plus la croissance du parc automobile ralentit.
      « Par contre, après 2016, la conjoncture économique favorable à Montréal fait en sorte que même avec une hausse des prix de l'essence, peu d'impacts sont ressentis sur l'achat de véhicules », observe-t-elle.
      Et la croissance démographique n'explique pas à elle seule la croissance du parc automobile, puisque le nombre de véhicules de promenade par habitant a augmenté, passant de 0,365 à 0,392 entre 2004 et 2017.
      Enfin, la Société affirme que 5323 véhicules électriques étaient enregistrés sur l'île de Montréal en septembre dernier, alors qu'elle n'en comptait que 652 en août 2004.
      Ces nouvelles données sont publiées alors que le conseil municipal de Montréal, à l'instar de la Communauté métropolitaine, a adopté lundi une « déclaration citoyenne universelle d'urgence climatique » sur la nécessité de réduire rapidement les émissions de gaz à effet de serre.
      Avec la collaboration de Benoît Chapdelaine