Fil de discussion sur les ouvrages d'art (viaducs, structures aériennes, etc.) de l'antenne Rive-Sud du REM.

Devisubox du canal de Lachine : http://bit.ly/REM_Canal

Caméras de circulation du pont Samuel-De Champlain

 

Citation

Images


Pont entre l'Île-des-Sœurs et le sud de Montréal


Pont entre l'Île-des-Sœurs et le sud de Montréal, la nuit

Member uploaded pictures are not shown to unregistered visitors.spacer.png

Create a free account or sign in to view the pictures.


Pont entre l'Île-des-Sœurs et le sud de Montréal

 

 

 

 

 

 

 

Link to comment
Share on other sites

  • 2 years later...
57 minutes ago, ThomasH said:

2 mai 2021

À la sortie du pont Victoria

What a great view, and one I was really waiting for someone to snap! Thanks!

Link to comment
Share on other sites

20 hours ago, ThomasH said:

2 mai 2021

À la sortie du pont Victoria

 

Sur l'Île-des-Soeurs

Member uploaded pictures are not shown to unregistered visitors.spacer.png

Create a free account or sign in to view the pictures.

if only CDPQ had used this steel structure for the whole aerial section in PSC.  It would not be as subtil and delitace as the voussois in the west, but way, way better than the heavy and bulhy concreate beams they used

Link to comment
Share on other sites

  • 2 weeks later...
  • 4 weeks later...

Member uploaded pictures are not shown to unregistered visitors.spacer.png

Create a free account or sign in to view the pictures.

Lots of visible progress. Started to put down rails. The ramp from Lachine Canal bridge to the embankment leading to the viaduct is taking shape. It's not on Devisubox but the expansion of the bridge over de la Commune is progressing, too.
Note how the elevated section is still broken up behind Costco. That's the last section to make the line complete from Lachine Canal to Pont Samuel de Champlain.

Link to comment
Share on other sites

It’s probably not less complex, but I find it shocking how much quicker and more efficient the launching gantry system is at building elevated segments. We still don’t know why it was chosen for all the western segments but not for PSC.

Link to comment
Share on other sites

il y a 2 minutes, SameGuy a dit :

It’s probably not less complex, but I find it shocking how much quicker and more efficient the launching gantry system is at building elevated segments. We still don’t know why it was chosen for all the western segments but not for PSC.

Let me venture a guess… money? There may be other more technical considerations but at the end of the day, money rules!

Link to comment
Share on other sites

Just now, Internist said:

Let me venture a guess… money? There may be other more technical considerations but at the end of the day, money rules!

I’m really not sure. It looks like a lot more work the old fashioned way. The 5 km PSC segment isn’t ready yet but is the first section slated to open, while almost 10 km of the Anse branch structure is complete and rails have been installed on a significant portion of it. ¯\_(ツ)_/¯ 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By IluvMTL
      Registre des lobbyistes
      HighMark Real Estate Group 
      Mandat : Période couverte par le mandat :du 2021-08-05 au 2022-06-30
      Contrepartie reçue ou à recevoir :moins de 10 000 $ 
      Objet des activités :Proposition législative ou réglementaire, résolution, orientation, programme ou plan d'action
      Renseignements utiles :
      Démarches auprès de titulaires de charges publiques de la Ville de Westmount et de la Ville de Montréal à l'arrondissement Ville-Marie en vue d'obtenir l'approbation d'un projet de construction d'un édifice à vocation mixte (résidentielle et commerciale) d'une hauteur de 10 étages ou plus; le tout conformément aux règles de zonage en vigueur (Règlement no 1303 à Westmount et Règlement 01-282) et à la grille des usages et normes de la zone C7-24-09 (dans Westmount) et la zone 0126 (dans Ville-Marie).
      Le terrain visé est localisé au coin sud-ouest de l'intersection des rues Atwater et Ste-Catherine. Le nouvel édifice seraient en mode locatif ou en condos et avec certaines parties en bureau et/ou pour des commerces de services au rez-de-chaussée. Des discussions avec les représentants des deux Villes débutent dans le but de confirmer le projet qu'il serait possible de construire.
      Institutions visées :
      Montréal Westmount
    • By IluvMTL
      Forage ce matin sur le terrain vacant à côté des Délices d'Amandine.

    • By GDS
      From Rubin Rotman architectes Instragram
    • By GDS
      https://www.pzrealestate.com/building/980-saint-antoine-ouest/
      Tenants have started to receive eviction notices and lease non-renewals.  The building will be vacant in two years and will be demolished and replaced by a 34 storey residential tower.
      The same fate awaits 1000 Saint-Antoine, but that is only 6 years from now. They are capping those leases to 5 years.
       
×
×