Jump to content

ville-marie Esplanade Cartier — Lot 1 (Parthenais/Ste-Cat) – Phase 1 - 14 étages, Phase 2 - 7 étages


Recommended Posts

Pinned posts

Esplanade Cartier (Prével)

ccf58dce-f5fd-11e9-a65c-0eda3a42da3c.jpg

Citation

Emplacement: Parthenais / De Lorimier / Sainte-Catherine Est / René-Lévesque Est
Hauteur en étages: 3 à 7 étages sur Sainte-Catherine et Parthenais et 14 à l'arrière (phase 1)
Hauteur en mètres: 
Nombre d'unités
114 (phase 1) — Total pour le 1er ilôt : 258 dont 114 locatifs
Coût du projet: 
Promoteur: Prével
Architecte: NÓS Architectes 
Entrepreneur général: 
Début de construction: février 2020 (phase 1)
Fin de construction: hiver 2021-2022 (phase 1)
Site internet: https://esplanadecartier-prevel.ca/fr/ https://www.facebook.com/EsplanadeCartier/
Facebook: https://www.facebook.com/EsplanadeCartier/
Lien webcam: Caméra installée sur le toit de Square Cartier en juillet 2020
Vidéo promotionnelle: 
Rumeurs: 
Autres informations:

  • Détails de la phase 1
    • Îlot situé au coin des rues Sainte-Catherine Est et Parthenais
    • Phase 1 de 114 unités s’élevant sur 14 étages
    • Condos de 1 à 4 ch, studio et maisons de ville
    • Superficies de 302 à 1398 pi2 ;
    • Date de livraison prévue: hiver 2021-2022
    • Certification LEED v4 Habitations multifamiliales de moyenne hauteur visée.
  • Estimation pour le projet total : 2500 unités, 6 phases
  • Ensemble du projet sur un terrain de ± 400 000 pi²
  • Espaces à bureaux de 200 m²
  • Espaces commerciaux au rdc en rive sur Sainte-Catherine et Parthenais
  • Serre 
  • Espace communautaire de 100 m²
  • Stationnement souterrain pour 93 voitures et 196 vélos
  • Prével visera des certifications LEED Habitation et LEED Neighborhood.
  • Voir brochure PDF

Autres images :

2293cd0e-b82f-4aa9-8383-c4fbd3a2ab79_16x9_WEB.jpg?quality=100%26size=4000x%26version=1&key=24aab9fdb577782b101bec318a1050270852528ad64a585573eac2f07d9ead07
Perspective préliminaire de la placette de Esplanade Cartier

argimmobilierprevel_ORIGINAL.jpg?quality=100%26size=4000x%26version=1&key=c7d9377af0e2a0237223ca8522df75fd8cf7362d8ec87efef4905bf9a27e27b0

argimmobilierprevel_ORIGINAL.jpg?quality=100%26size=4000x%26version=1&key=be8102ce9d81cace97d74eb6778451b0d6d68bdaf500b7a2f8218b861b126e92 

 

image.png
Perspective préliminaire des escaliers en colimaçon d'Esplanade Cartier

image.png

image.png



image.png
image.png
image.png

EC_BrochureWeb.pdf

EC2_Brochure_phase2.pdf

EsplanadeCartier_PresentationCCU.pdf

 

 

 

 

Link to post
Share on other sites
  • 11 months later...
  • Replies 779
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Smartvision    

C'est sur que c'est plus vendeur qu'une photo de prostitué(e)/drogué(e)/poqué(e) à proximité du métro Papineau..

Mon cher Rocco tu n'en manques jamais une pour véhiculer tes préjugés désobligeants. Dommage car en agissant ainsi ce sont les gens du quartier (et les montréalais parce que tout le monde y a de la fa

Posted Images

Suite à la proposition déposée au conseil hier j'ai essayé d'imaginer la vue sur le pont Jacques-Cartier qui sera préservée au centre du projet (cad la division est/ouest), à  partir de la rue Sainte-Catherine. Si mes calculs sont bons, cette grande allée (placette et espaces de parc) aura environ  24 mètres de large.

 

image.png

Closer to Rene-Levesque

image.png

 

Link to post
Share on other sites
4 minutes ago, Chicoutimi said:

Do you have the proposal? Thankd

Nope. I am just extrapolating. We'll have to wait til the PPU is published, anytime soon....One thing is certain. That will be a million dollar view of the bridge!

Link to post
Share on other sites

I wonder if the fact that we received the premail today, means that the official launch email will come tomorrow morning. Last time you couldn't even register for the presale if you didn't check your email early enough in the morning. 

Screenshot_20200214-212103.jpg

Link to post
Share on other sites
1 hour ago, IluvMTL said:

I wonder if the fact that we received the premail today, means that the official launch email will come tomorrow morning. Last time you couldn't even register for the presale if you didn't check your email early enough in the morning. 

Screenshot_20200214-212103.jpg

Somethings wrong with this pic.

Link to post
Share on other sites
  • IluvMTL changed the title to Esplanade Cartier — Lot 1 (Parthenais/Ste-Cat) – Phase 1 - 14 étages, Phase 2 - 7 étages

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By swansongtoo
      I'm sure there's a thread for this piece of land but too lazy to look.
       
      In Saturday's Gazette a report on a new Preval projet on the former Franciscan church site.
       
      Suspects are apparently already complaining though that's a small piece of the report.
       
       
      MONTREAL - A vast tract of downtown land, left partially empty after the site’s historic Franciscan church was destroyed in a 2010 blaze, could be reinvented as two 18-storey condo towers.
       
      Groupe Prével, the developer that transformed the former Seville theatre near the old Forum into a sold-out multi-phase condo project, has an option to buy part of the site on the south side of René Lévesque Blvd., west of Fort St. and the entrance to Highway 720.
       
      The Prével project — which would include a 330-square-metre public park on part of the site — would require the city of Montreal to change the zoning from institutional to residential.
       
      “We’ve had internal discussions with the planning department and they seem positive about it,” said Jonathan Sigler, a co-founder of the urban condo developer, which has also built the Lowney project in Griffintown.
       
      “But obviously, this is going to go through a public consultation.”
       
      The project comes at a time when the city of Montreal, along with other local muncipalities, is under fire for fast-tracking residential development at the expense of green space and such services as schools and daycares in areas like Griffintown. Sigler said Prével’s project would balance development with the need for green space, by creating the park and maintaining the woods in the back of the site known as the jardin des Franciscains.
       
      “Nothing would be knocked out,” Sigler told The Gazette.
       
      But some residents in nearby Shaughnessy Village have already called on city officials to “firmly oppose the project” and come up with a plan oriented toward better public access to the site instead of for “building condo towers.”
       
      Through the deal with the Franciscans, Prével would acquire only part of the site, which includes two heritage buildings used by commercial tenants. The religious order, which first stepped foot in Quebec nearly 400 years ago, would continue to own these two buildings.
       
      The historic Franciscan church was destroyed in an early-morning fire more than three years ago. News reports said the religious order had ceased holding services at the aging church, and abandoned the building in 2007 because it couldn’t afford the $5 million in needed repairs.
       
       
      Read more: Montreal Gazette | Page Not Found
    • By IluvMTL
      Dans Sainte-Marie et en face du fleuve
      297 logements





       
       
       
    • By IluvMTL
      170-188, boul. René-Lévesque Est

      180 René-Lévesque Est
      Client : Hillpark Capital
      Architecte : NEUF Architect(e)s
      Le 180 René-Lévesque Est est une tour de 21 étages avec deux sous-sols à l’entrée du centre-ville de Montréal ayant une présence marquée parmi les bâtiments voisins de plus faible hauteur. La tour possède une dalle en tréfonds accueillant des arbres matures, ainsi qu’un podium au quatrième étage abritant une piscine pour les usagers de cette tour résidentielle. 
      PRINCIPAUX DÉFIS RELEVÉS :
      Conception d’un radier sur la totalité de l’empreinte du bâtiment en raison de la faible capacité portante du sol;
      Élaboration d’une stratégie de soutènement des terres afin d’éviter les ouvrages souterrains et permettant la reprise en sous-œuvre de deux bâtiments voisins de plus de trois étages.
      http://elema-ing.com/fr/projets/180-rene-levesque-est
       
       



×
×
  • Create New...