Jump to content

ville-marie Maestria - 57, 61 étages


Recommended Posts

Pinned posts

Maestria Condominums

 

Maestria1.png

 

Maestria2.pngMaestria.png

Quote

Nom: Tours Quartier des spectacles
Hauteur en étages: 57  et 61
Hauteur en mètres: 185 et 202
Coût du projet: 
Promoteur: Devimco (partenaire : Fonds immobilier de solidarité FTQ)
Architecte: Lemay
Entrepreneur général: 
Emplacement: Ancien Spectrum, rue Sainte-Catherine entre Bleury et Jeanne-Mance
Début de construction: 
Fin de construction: 
Site internet: https://maestriacondos.com/
Lien webcam: 
Autres informations: 
image.png
Rumeurs: 
Aperçu artistique du projet:

f22a3441-aa71-4090-8fed-263f9d70cc89-large.jpeg
Maestria 3.jpg
Maestria 2.jpg

62040307_155985965452352_165239465284668

 

Link to post
Share on other sites
  • IluvMTL changed the title to Maestria Ste-Catherine et Jeanne-Mance - 57, 61 étages (185m + 202m)
  • mtlurb locked this topic
  • mtlurb unlocked this topic
  • 4 months later...
  • Replies 1.9k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Major scoop! I am sorry for the bad quality, I had to take this picture quick. La complexe Desjardins est a gauche dans l'image. Tower 1 is 50 floors, 199.5m. 42 floors are residential,

Maestria Condominums      

De nouveaux rendus tout chauds...  

Posted Images

17 hours ago, Fortier said:

@Rocco n’oublie pas que ce n’est pas la fin du monde. Oui beaucoup de gens perdent leur emploi et on vit un stress énorme. Mais des projets de tours comme Meastria, 1sqP et VSLP sont des projets à plus long terme. Quelle sera la situation dans 3-4 ans? Difficile de dire.

Pendant ce temps les promoteurs qui ont les liquidités suffisantes peuvent profiter d’une main d’œuvre plus abondante, des taux d’intérêt plus faibles et des prix des ressources également plus faibles suivant le cours du pétrole.

Si la situation devait perdurer et s’aggraver et que nous faisions effectivement face à une vague d’annulations, on en reparlera. Mais en attendant, ça ne sert le profit de personne de jouer l’oiseau de malheur et de crier au loup à tue tête. Restons zen pendant la tempête.

Prends un peu de temps dans ta quarantaine pour regarder les tours construites à New York pendant la Grande dépression, peut-être que ça te changera les idées. ;) 

Les taux vont monter...moins de liquidités dans le système et les taux d'intérêts sur les dépôts sont très faibles en ce moment. Je crois que tu confonds les taux des banques centrales avec les taux que pratiquent les banques au niveau commercial-institutionnel.

Edited by GIGI
Link to post
Share on other sites
  • 3 weeks later...

On dirait le même vidéo qui avait été publié sur la chaîne YouTube de SmartPixel. Ça serait vraiment intéressant si tous les futurs projets immobiliers de Montréal qui ont été simulé dans l'applicaiton de Smartpixel étaient rassemblés dans un vidéo.

Link to post
Share on other sites
il y a 8 minutes, vanylapep a dit :

C'est vraiment nice comme logiciel, s'il le vendait je l'achèterais!

C'est vrai que c'est le fun. Le mieux qu'on peu avoir c'est google earth.

image.png

Link to post
Share on other sites
Le ‎2020‎-‎04‎-‎14 à 22:20, vanylapep a dit :

Peut être une vieille photo mais vu que y'a pas grand chose qui se passe j'pense c ok de reposter..

92505180_551636379086009_8546416020556873728_o.jpg

Ce qui paraissait au début comme un gros bloc aveugle sera finalement une belle vitrine ouverte sur la ville ! Très bonne nouvelle.

Cependant, je doute de la viabilité d'une épicerie sur ce coin de rue avec le IGA juste en face et le Fou d'ICI un coin de rue au nord, je ne crois pas qu'il y aura un marché pour supporter une 3e épicerie ?

Link to post
Share on other sites

C'est probablement juste un place holder pour un enseigne, indiquant que l'espace que peut être aménager en grand locaux, si la demande n'est pas là ils vont surement rediviser leurs CRU

Link to post
Share on other sites
  • Fortier changed the title to Maestria - 57, 61 étages

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By swansongtoo
      I'm sure there's a thread for this piece of land but too lazy to look.
       
      In Saturday's Gazette a report on a new Preval projet on the former Franciscan church site.
       
      Suspects are apparently already complaining though that's a small piece of the report.
       
       
      MONTREAL - A vast tract of downtown land, left partially empty after the site’s historic Franciscan church was destroyed in a 2010 blaze, could be reinvented as two 18-storey condo towers.
       
      Groupe Prével, the developer that transformed the former Seville theatre near the old Forum into a sold-out multi-phase condo project, has an option to buy part of the site on the south side of René Lévesque Blvd., west of Fort St. and the entrance to Highway 720.
       
      The Prével project — which would include a 330-square-metre public park on part of the site — would require the city of Montreal to change the zoning from institutional to residential.
       
      “We’ve had internal discussions with the planning department and they seem positive about it,” said Jonathan Sigler, a co-founder of the urban condo developer, which has also built the Lowney project in Griffintown.
       
      “But obviously, this is going to go through a public consultation.”
       
      The project comes at a time when the city of Montreal, along with other local muncipalities, is under fire for fast-tracking residential development at the expense of green space and such services as schools and daycares in areas like Griffintown. Sigler said Prével’s project would balance development with the need for green space, by creating the park and maintaining the woods in the back of the site known as the jardin des Franciscains.
       
      “Nothing would be knocked out,” Sigler told The Gazette.
       
      But some residents in nearby Shaughnessy Village have already called on city officials to “firmly oppose the project” and come up with a plan oriented toward better public access to the site instead of for “building condo towers.”
       
      Through the deal with the Franciscans, Prével would acquire only part of the site, which includes two heritage buildings used by commercial tenants. The religious order, which first stepped foot in Quebec nearly 400 years ago, would continue to own these two buildings.
       
      The historic Franciscan church was destroyed in an early-morning fire more than three years ago. News reports said the religious order had ceased holding services at the aging church, and abandoned the building in 2007 because it couldn’t afford the $5 million in needed repairs.
       
       
      Read more: Montreal Gazette | Page Not Found
    • By IluvMTL
      Dans Sainte-Marie et en face du fleuve
      297 logements





       
       
       
    • By IluvMTL
      170-188, boul. René-Lévesque Est

      180 René-Lévesque Est
      Client : Hillpark Capital
      Architecte : NEUF Architect(e)s
      Le 180 René-Lévesque Est est une tour de 21 étages avec deux sous-sols à l’entrée du centre-ville de Montréal ayant une présence marquée parmi les bâtiments voisins de plus faible hauteur. La tour possède une dalle en tréfonds accueillant des arbres matures, ainsi qu’un podium au quatrième étage abritant une piscine pour les usagers de cette tour résidentielle. 
      PRINCIPAUX DÉFIS RELEVÉS :
      Conception d’un radier sur la totalité de l’empreinte du bâtiment en raison de la faible capacité portante du sol;
      Élaboration d’une stratégie de soutènement des terres afin d’éviter les ouvrages souterrains et permettant la reprise en sous-œuvre de deux bâtiments voisins de plus de trois étages.
      http://elema-ing.com/fr/projets/180-rene-levesque-est
       
       



×
×
  • Create New...