ville-marie 800 rue Saint-Jacques (Banque Nationale) - 40 étages


Recommended Posts

Pinned posts

Siège social de la Banque Nationale

BNC.jpgBNC.jpg

(autres images dans la citation)

Quote

Emplacement: Part de l'îlot Robert-Bourassa, Saint-Jacques, Notre-Dame, Gauvin
Hauteur en étages: 40
Hauteur en mètres: ≤ 200m
Coût du projet: 
Promoteur: Banque Nationale
Architecte: Menkès Shooner Dagenais LeTourneux
Entrepreneur général: Broccolini
Début de construction: Automne 2018
Fin de construction: 2022
Site internet: 
Lien webcam: 
Autres images: 
Banque nationale.jpgBNC3.jpg
BNC4.jpg

BNC.jpgBNC.png
Vidéo promotionnelle: 
Rumeurs: 
Autres informations:

  • Nouveau siège social de la Banque Nationale
  • L'immeuble sera occupé exclusivement par la Banque Nationale. 
  • Le bâtiment sera conçu conformément aux normes environnementales et de qualité les plus avancées. 
  • Le concept de l'édifice sera finalisé au cours des prochains mois dans le cadre d'un concours architectural mené par invitation. 
  • La Banque privilégiera l'utilisation de matériaux et de services issus du Québec et du Canada, provenant d'entreprises clientes, dans toutes les facettes de ses travaux. 
  • Une grande attention sera accordée à la mise en valeur historique du site et de ses différentes composantes. 
  • La tour hébergeant l'actuel siège social au 600, rue de la Gauchetière Ouest sera mise en vente prochainement. Le produit de la vente sera consacré aux travaux à venir.

 

Link to post
Share on other sites
  • 2 years later...
  • Replies 2.2k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

J'ai eu la chance de papoter avec l'un des responsables seniors de la compagnie mandatée pour gérer le projet de la tour et je lui ai demandé s'il voulait bien me résumer les échéanciers à venir et vo

Ma mère est venue s'installer à Montréal en 1958. Elle vivait sur la rue Tupper et a été témoin du premier boom de la construction durant les années 60, et était dessinatrice pour  les ingénieurs cons

Now that it has leaked...

Posted Images

9 hours ago, Windex said:

Ils vont continuer aux étages supérieurs c'est sûr; ils ne vont pas monter cette tour au bucket!

Je viens d'avoir un flash -- ils n'auraient pas besoin de système avec pompe si le bâtiment est en acier.

Je ne me souviens pas si on a déjà la réponse, est-ce qu'on sait comment sera la structure de cette tour (béton ou acier)?

Link to post
Share on other sites
il y a 43 minutes, Windex a dit :

Je viens d'avoir un flash -- ils n'auraient pas besoin de système avec pompe si le bâtiment est en acier.

Je ne me souviens pas si on a déjà la réponse, est-ce qu'on sait comment sera la structure de cette tour (béton ou acier)?

Elle sera en béton ! 

Link to post
Share on other sites

Je confirme le post de Ju Hg, un des responsables de Decasult, la firme qui gère le projet pour Brocolini, m'a certifié que ce sera une tour en béton!

 

Link to post
Share on other sites
22 minutes ago, Bandolero said:

Je confirme le post de Ju Hg, un des responsables de Decasult, la firme qui gère le projet pour Brocolini, m'a certifié que ce sera une tour en béton!

 

Comme sa voisine la Tour de la Bourse!

Archives V de M et Janin Construction.

8006225836_4cce5f63d5_b.jpg

8006225982_3d6fac532d_b.jpg

pv6.jpg

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By swansongtoo
      I'm sure there's a thread for this piece of land but too lazy to look.
       
      In Saturday's Gazette a report on a new Preval projet on the former Franciscan church site.
       
      Suspects are apparently already complaining though that's a small piece of the report.
       
       
      MONTREAL - A vast tract of downtown land, left partially empty after the site’s historic Franciscan church was destroyed in a 2010 blaze, could be reinvented as two 18-storey condo towers.
       
      Groupe Prével, the developer that transformed the former Seville theatre near the old Forum into a sold-out multi-phase condo project, has an option to buy part of the site on the south side of René Lévesque Blvd., west of Fort St. and the entrance to Highway 720.
       
      The Prével project — which would include a 330-square-metre public park on part of the site — would require the city of Montreal to change the zoning from institutional to residential.
       
      “We’ve had internal discussions with the planning department and they seem positive about it,” said Jonathan Sigler, a co-founder of the urban condo developer, which has also built the Lowney project in Griffintown.
       
      “But obviously, this is going to go through a public consultation.”
       
      The project comes at a time when the city of Montreal, along with other local muncipalities, is under fire for fast-tracking residential development at the expense of green space and such services as schools and daycares in areas like Griffintown. Sigler said Prével’s project would balance development with the need for green space, by creating the park and maintaining the woods in the back of the site known as the jardin des Franciscains.
       
      “Nothing would be knocked out,” Sigler told The Gazette.
       
      But some residents in nearby Shaughnessy Village have already called on city officials to “firmly oppose the project” and come up with a plan oriented toward better public access to the site instead of for “building condo towers.”
       
      Through the deal with the Franciscans, Prével would acquire only part of the site, which includes two heritage buildings used by commercial tenants. The religious order, which first stepped foot in Quebec nearly 400 years ago, would continue to own these two buildings.
       
      The historic Franciscan church was destroyed in an early-morning fire more than three years ago. News reports said the religious order had ceased holding services at the aging church, and abandoned the building in 2007 because it couldn’t afford the $5 million in needed repairs.
       
       
      Read more: Montreal Gazette | Page Not Found
    • By IluvMTL
      Dans Sainte-Marie et en face du fleuve
      297 logements





       
       
       
    • By IluvMTL
      170-188, boul. René-Lévesque Est

      180 René-Lévesque Est
      Client : Hillpark Capital
      Architecte : NEUF Architect(e)s
      Le 180 René-Lévesque Est est une tour de 21 étages avec deux sous-sols à l’entrée du centre-ville de Montréal ayant une présence marquée parmi les bâtiments voisins de plus faible hauteur. La tour possède une dalle en tréfonds accueillant des arbres matures, ainsi qu’un podium au quatrième étage abritant une piscine pour les usagers de cette tour résidentielle. 
      PRINCIPAUX DÉFIS RELEVÉS :
      Conception d’un radier sur la totalité de l’empreinte du bâtiment en raison de la faible capacité portante du sol;
      Élaboration d’une stratégie de soutènement des terres afin d’éviter les ouvrages souterrains et permettant la reprise en sous-œuvre de deux bâtiments voisins de plus de trois étages.
      http://elema-ing.com/fr/projets/180-rene-levesque-est
       
       



×
×