Jump to content

ville-marie 2055 rue Drummond - 38 étages


Recommended Posts

Pinned posts

2055 rue Drummond

image.png.6a64d6390fc8e54ae602ada83fba321e.png.5d7966b2f64e1675a7ce523547943e9f.png

Quote

Une tour de condos, et une tour locative. 437 unités au total.
Emplacement: 2055 rue Drummond
Hauteur en étages: 38
Hauteur en mètres: 120
Coût du projet: 
Promoteur: Lune Rouge, Canderel et Crave Real Estate
Architecte: Saucier+Perrotte Architectes, Architex
Entrepreneur général: 
Début de construction: 
Fin de construction: 
Site internet: 
Lien webcam: 
Autres images: 

vieux rendu d'une version précédente:

Quote

2055drummond.png


Vidéo promotionnelle: 
Rumeurs: 
Autres informations:   405 cases de stationnement souterrain sur 7 étages

 

Link to post
Share on other sites
  • 2 years later...
  • Replies 164
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

De @franktko

Incroyable de vivre à Montréal, de s'intéresser au patrimoine architectural et de ne pas connaître Dinu Bumbaru !!

Posted Images

Wow après avoir vu le projet monstrueux Bass 4, la tour laide Drummond 3 de Samcon, là je vois ça. La pandémie a anéanti le peu d'imagination des architectes québécois. Montréal va souffrir en TABARN....

Link to post
Share on other sites
il y a une heure, Fortier a dit :

Ca ressemble davantage à la version précédente non?

Tu as raison, ça ressemble beaucoup à la version précédente, je ne comprends donc pas pourquoi lors de la demande de projet à la ville, c'était la version tours jumelles qui a été présentée, peut-être que ce rendu n'est qu'une erreur? 

Par contre, dans le code source de la page, on peut voir que le rendu a été upload en juillet 2020.

image.png

Link to post
Share on other sites

Je note que la nouvelle image générique que l'on voit fait état d'environ 24 étages ... et non 38. Aussi il semble que cela soit situé sur la rue Stanley et non Drummond (contrairement à l'image d'entête Tours Donnacona). Est-ce que peut être on gardera Donnacona 38 étages côté Drummond... et on verra la nouvelle mouture générique sur Stanley?

Link to post
Share on other sites

Je vous ai simplement partagé un rendu mis en ligne récemment (été 2020). Je n’ai pas d’info supplémentaire.

C’est un rendu et un style qui s’apparentent davantage à ceux que produisent Geiger Huot ou Architex, mais pas Saucier Perotte (comme la version 2 tours).

La firme Desjardins expert conseil était impliquée dans la version précédente de 24 étages de Geiger Huot. Il y a de forte chance qu’il s’agisse de l’ancienne version.

Ah oui et la version en tête de fil a été présentée en CA pour une demande de dérogation mineure de mémoire. 

Donc désolé pour la confusion. Ça me parait clair qu’il s’agit d’un rendu différent de la version précédente.

Link to post
Share on other sites
Il y a 13 heures, UrbMtl a dit :

Donc désolé pour la confusion. Ça me parait clair qu’il s’agit d’un rendu différent de la version précédente.

Merci pour cette précision. Quant à ceux qui ont déjà déchiré leur chemise, il faudra planifier une petite visite chez la couturière. :D

Link to post
Share on other sites
Il y a 4 heures, acpnc a dit :

Merci pour cette précision. Quant à ceux qui ont déjà déchiré leur chemise, il faudra planifier une petite visite chez la couturière. :D

Avec un thermos de camomille...

Link to post
Share on other sites
  • SkahHigh changed the title to 2055 rue Drummond - 38 étages

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Similar Content

    • By swansongtoo
      I'm sure there's a thread for this piece of land but too lazy to look.
       
      In Saturday's Gazette a report on a new Preval projet on the former Franciscan church site.
       
      Suspects are apparently already complaining though that's a small piece of the report.
       
       
      MONTREAL - A vast tract of downtown land, left partially empty after the site’s historic Franciscan church was destroyed in a 2010 blaze, could be reinvented as two 18-storey condo towers.
       
      Groupe Prével, the developer that transformed the former Seville theatre near the old Forum into a sold-out multi-phase condo project, has an option to buy part of the site on the south side of René Lévesque Blvd., west of Fort St. and the entrance to Highway 720.
       
      The Prével project — which would include a 330-square-metre public park on part of the site — would require the city of Montreal to change the zoning from institutional to residential.
       
      “We’ve had internal discussions with the planning department and they seem positive about it,” said Jonathan Sigler, a co-founder of the urban condo developer, which has also built the Lowney project in Griffintown.
       
      “But obviously, this is going to go through a public consultation.”
       
      The project comes at a time when the city of Montreal, along with other local muncipalities, is under fire for fast-tracking residential development at the expense of green space and such services as schools and daycares in areas like Griffintown. Sigler said Prével’s project would balance development with the need for green space, by creating the park and maintaining the woods in the back of the site known as the jardin des Franciscains.
       
      “Nothing would be knocked out,” Sigler told The Gazette.
       
      But some residents in nearby Shaughnessy Village have already called on city officials to “firmly oppose the project” and come up with a plan oriented toward better public access to the site instead of for “building condo towers.”
       
      Through the deal with the Franciscans, Prével would acquire only part of the site, which includes two heritage buildings used by commercial tenants. The religious order, which first stepped foot in Quebec nearly 400 years ago, would continue to own these two buildings.
       
      The historic Franciscan church was destroyed in an early-morning fire more than three years ago. News reports said the religious order had ceased holding services at the aging church, and abandoned the building in 2007 because it couldn’t afford the $5 million in needed repairs.
       
       
      Read more: Montreal Gazette | Page Not Found
    • By IluvMTL
      Dans Sainte-Marie et en face du fleuve
      297 logements





       
       
       
    • By IluvMTL
      170-188, boul. René-Lévesque Est

      180 René-Lévesque Est
      Client : Hillpark Capital
      Architecte : NEUF Architect(e)s
      Le 180 René-Lévesque Est est une tour de 21 étages avec deux sous-sols à l’entrée du centre-ville de Montréal ayant une présence marquée parmi les bâtiments voisins de plus faible hauteur. La tour possède une dalle en tréfonds accueillant des arbres matures, ainsi qu’un podium au quatrième étage abritant une piscine pour les usagers de cette tour résidentielle. 
      PRINCIPAUX DÉFIS RELEVÉS :
      Conception d’un radier sur la totalité de l’empreinte du bâtiment en raison de la faible capacité portante du sol;
      Élaboration d’une stratégie de soutènement des terres afin d’éviter les ouvrages souterrains et permettant la reprise en sous-œuvre de deux bâtiments voisins de plus de trois étages.
      http://elema-ing.com/fr/projets/180-rene-levesque-est
       
       



×
×
  • Create New...