Recommended Posts

American Airlines from 05JUL17 is expanding Montreal service, including restoration of previously cancelled frequencies. Planned operation as follow.

 

Dallas/Ft. Worth – Montreal Increase from 1 to 2 daily

AA3560 DFW1230 – 1711YUL E75 D

AA3387 DFW1902 – 2344YUL E75 D

 

AA3533 YUL0629 – 0940DFW E75 D

AA3560 YUL1751 – 2103DFW E75 D

 

Miami – Montreal 2nd daily flight reinstated

AA1151 MIA1036 – 1415YUL 738 D

AA2652 MIA1925 – 2301YUL 738 D

 

AA2438 YUL0600 – 0944MIA 738 D

AA1151 YUL1505 – 1856MIA 738 D

 

http://www.routesonline.com/news/38/airlineroute/272238/american-enhances-montreal-flights-from-july-2017/

Share this post


Link to post
Share on other sites

This is great news.  Slowly but surely we're building up a very substantial feeder network for our international operations.  This will help solidify the hub.

Excellent!

Share this post


Link to post
Share on other sites
8 hours ago, FlyboyMTL said:

This is great news.  Slowly but surely we're building up a very substantial feeder network for our international operations.  This will help solidify the hub.

Excellent!

Is it not the opposite? I believe that we are feeding American Airline's hub at DFW instead...

Share this post


Link to post
Share on other sites
il y a 35 minutes, LaRonde a dit :

Is it not the opposite? I believe that we are feeding American Airline's hub at DFW instead...

Goes both way.

Share this post


Link to post
Share on other sites
3 minutes ago, Malek said:

Goes both way.

I mean if it was Air Canada, I would understand how the flights would feed our international network. However, American Airlines does not have any international destinations out of YUL and there is a limited amount of airlines under Oneworld at our airport. Therefore, how is our hub being fed in that case?

Share this post


Link to post
Share on other sites

You're absolutely right. THis provides very little value to the Montreal hub and more to the Dallas hub.

Share this post


Link to post
Share on other sites

Atta boy Mark. I was getting worried that you were going to miss a chance for negative input...but you came through. Well done!!

Share this post


Link to post
Share on other sites
8 minutes ago, mont royal said:

Atta boy Mark. I was getting worried that you were going to miss a chance for negative input...but you came through. Well done!!

You seemed to have missed the point as per usual my dear friend Mont Royal.

 

Share this post


Link to post
Share on other sites

It actually gives more options for Montreal travellers.

My guess is probably others will follow as well, Delta will probably add an extra flight as well. As for United, they don't really need to, since Air Canada is opening up routes pretty much everywhere these days. That's why United is the only US-3 that does not fly a mainline aircraft at YUL.

Edited by ERJ-Boy

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Similar Content

    • By SkahHigh
      Fil de discussion sur les ouvrages d'art (viaducs, structures aériennes, etc.) de l'antenne Deux-Montagnes du REM.

    • By ScarletCoral
      J'ai compilé la liste des pages contenant les différents documents présentés lors de assemblées publiques de consultation tels que les documents du PPCMOI

      Pas tous les arrondissements sont aussi assidus à publier les documents contenant les rendus des projets à l'étude. Certains ont juste une page d'information sur le CCU
      Les meilleurs sont : CDN-NDG, le Plateau-Mont-Royal, Le Sud-Ouest, Mercier-Hochelaga-Maisonneve, Ville-Marie et Verdun
      Ahuntsic-Cartierville : http://ville.montreal.qc.ca/portal/page?_pageid=7957,142581083&_dad=portal&_schema=PORTAL Anjou Côte-des-Neiges - Notre-Dame-de-Grâce : http://ville.montreal.qc.ca/portal/page?_pageid=7497,142955988&_dad=portal&_schema=PORTAL Lachine LaSalle Le Plateau-Mont-Royal : http://ville.montreal.qc.ca/portal/page?_pageid=7297,74659611&_dad=portal&_schema=PORTAL Le Sud-Ouest : http://ville.montreal.qc.ca/portal/page?_pageid=7757,84961577&_dad=portal&_schema=PORTAL L’Île-Bizard–Sainte-Geneviève : Procès-verbaux du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=8497,142762272&_dad=portal&_schema=PORTAL Mercier–Hochelaga–Maisonneuve : http://ville.montreal.qc.ca/portal/page?_pageid=9417,114239587&_dad=portal&_schema=PORTAL Montréal-Nord Outremont : http://ville.montreal.qc.ca/portal/page?_pageid=8517,95571727&_dad=portal&_schema=PORTAL#documents Pierrefonds-Roxboro : Ordres du jour du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=8377,142652423&_dad=portal&_schema=PORTAL Rivière-des-Prairies–Pointe-aux-Trembles : http://ville.montreal.qc.ca/portal/page?_pageid=7697,83667580&_dad=portal&_schema=PORTAL Rosemont–La Petite-Patrie Saint-Laurent : Dates des séances publiques du CCU : http://ville.montreal.qc.ca/portal/page?_pageid=7937,87207739&_dad=portal&_schema=PORTAL Saint-Léonard : dernière mise à jour en 2017 : https://ville.montreal.qc.ca/portal/page?_pageid=7157,142045745&_dad=portal&_schema=PORTAL Verdun : http://ville.montreal.qc.ca/portal/page?_pageid=8637,96045934&_dad=portal&_schema=PORTAL Ville-Marie : http://ville.montreal.qc.ca/portal/page?_pageid=7317,127951572&_dad=portal&_schema=PORTAL Villeray–Saint-Michel–Parc-Extension
    • By mtlurb
      STM: Prolongement du métro: Ligne 02 orange vers le nord-ouest

      Discussion et actualités sur le prolongement de la Ligne 02 orange vers le nord-ouest. Plan: ligne-2.pdf
      Présentation du 26 février 2020 au comité exécutif de la Ville de Montréal : https://ville.montreal.qc.ca/documents/Adi_Public/CE/CE_DA_ORDI_2020-02-26_08h30_Presentation_Prolongation_de_la_ligne_Orange_Ouest.pdf
    • By mtlurb
      Prolongement de la ligne bleue vers l'est

      Prolongement de la ligne bleue vers l'est. La mise en chantier est prévue en 2022, pour une livraison en 2026. Connexion avec le SRB Pie-IX, stationnement de 1200 places aux Galeries d'Anjou. Coût évalué à 3.9 milliards de dollars.
      Le projet en chiffres 
      5 nouvelles stations de métro accessibles, pour une longueur de tunnel de 5,8 km 2 terminus d’autobus et 1 stationnement incitatif de 1 200 places 1 tunnel piétonnier souterrain assurant le lien avec le futur SRB Pie-IX Plusieurs infrastructures opérationnelles : 6 structures auxiliaires renfermant des équipements nécessaires à l’exploitation, 1 poste de district, 1 garage de métro, 1 centre d’attachement hébergeant des véhicules d’entretien des voies et 1 centre de service pour l’entretien des infrastructures Budget estimé de 3,9 G$ Échéancier préliminaire
      Début 2019 : début de la conception des plans et devis.  Printemps 2019 : approbation du mode de réalisation, du plan budgétaire et de l’envergure du projet. Fin 2019 : début de travaux préparatoires sur certains sites. Début 2020 : démarrage des processus de changement de zonage et de consultations publiques.   2021 : dépôt du dossier d’affaires, lancement de la construction des nouvelles infrastructures. 2026 : inauguration du nouveau tronçon. Information : http://www.stm.info/fr/a-propos/grands-projets/grands-projets-metro/prolongement-ligne-bleue
      Consultations publiques : http://www.stm.info/fr/consultations/prolongement-de-la-ligne-bleue
        
       
    • By SkahHigh
      Fil de discussion sur les travaux du tunnel Mont-Royal dans le cadre du REM.