Recommended Posts

amNY.com

 

Extreme Commuter: From Montreal to Queens

 

By Justin Rocket Silverman, amNewYork Staff Writer

[email protected]

January 28, 2008

[/url]

This Extreme Commuter rides a plane the way most of us ride the subway.

 

Professor Adnan Turkey lives in Montreal but teaches computer science at DeVry Institute of Technology in Long Island City. He's been making that commute once a week for nine years, 45 weeks a year.

 

Although the flight itself is only about 75 minutes long, getting to and from the airport makes it impractical to make the ride daily. Price is a factor, too. Flying directly from Montreal is too expensive even once a week, so for half the ticket price he drives across the border to fly out of Burlington, Vt.

 

So every Monday at noon he leaves his house in Canada and makes that 2-hour trip to Vermont. He puts the car in long-term parking ($6 a day) and flies to New York, where he will sleep in a small rented apartment and teach until Thursday afternoon. Then he takes the flight and drives back home.

 

Door-to-door it's about seven hours each way.

 

"After working many years in Canada, I thought, 'why not come to New York City?'" he asks. "It's just next door and it's the capital of the world."

 

Adnan knows of no other commuters on the Montreal/New York City run, and says many of the border guards laugh in amazement when he states his business in the U.S.

 

Although the weekly $150-round trip JetBlue ticket, and the monthly rent in New York takes a bit out of his income (he won't say how much), Adnan says he has no plans to ask his wife, also a university teacher, and two college-age daughters to move to New York. Besides, money has never been his primary interest.

 

"Education is a noble mission, so salary is not the No. 1 concern, at least for me," he says. "When I see the next generation of students learning and becoming skilled, that's my job satisfaction."

 

Know an Extreme Commuter? Transit reporter Marlene Naanes wants to hear the story. Email her at [email protected]

 

Copyright © 2008, AM New York

http://www.amny.com/sports/football/giants/am-commuter0128,0,4574142,print.story

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

  • Similar Content

    • By mtlurb
      Prolongement de la ligne bleue vers l'est

      Prolongement de la ligne bleue vers l'est. La mise en chantier est prévue en 2022, pour une livraison en 2026. Connexion avec le SRB Pie-IX, stationnement de 1200 places aux Galeries d'Anjou. Coût évalué à 3.9 milliards de dollars.
      Le projet en chiffres 
      5 nouvelles stations de métro accessibles, pour une longueur de tunnel de 5,8 km 2 terminus d’autobus et 1 stationnement incitatif de 1 200 places 1 tunnel piétonnier souterrain assurant le lien avec le futur SRB Pie-IX Plusieurs infrastructures opérationnelles : 6 structures auxiliaires renfermant des équipements nécessaires à l’exploitation, 1 poste de district, 1 garage de métro, 1 centre d’attachement hébergeant des véhicules d’entretien des voies et 1 centre de service pour l’entretien des infrastructures Budget estimé de 3,9 G$ Échéancier préliminaire
      Début 2019 : début de la conception des plans et devis.  Printemps 2019 : approbation du mode de réalisation, du plan budgétaire et de l’envergure du projet. Fin 2019 : début de travaux préparatoires sur certains sites. Début 2020 : démarrage des processus de changement de zonage et de consultations publiques.   2021 : dépôt du dossier d’affaires, lancement de la construction des nouvelles infrastructures. 2026 : inauguration du nouveau tronçon.
    • By IluvMTL
      Port de Montréal
       
      Installations

       
      Accueil À propos du Port Carrières Nous joindre Médias English  
       
      ENTREPRISES
       
      LE PORT, PARTENAIRE D'AFFAIRES
      Nos avantages Plateforme intermodale Ouvert toute l'année Sûreté au port Statistiques Représentation - Europe / É-U / Asie Contacts à l'Administration portuaire Services fréquemment demandés Liens utiles aux entreprises Appels d'offres Magazine Port Info  
       
      OPÉRATIONS
      Arrivées et départs des navires Services programmés de conteneurs Pratiques et procédures Permis et autres documents MARSEC Avis aux usagers Services aux navires TarifsPassPortRéseau de caméras Internet    
      INFORMATIONS SUR LE PORT
      Répertoire du Port Carte des installations Carte du Port de Montréal Carte d'accès au siège socia lRoutes d'accès aux terminaux Information aux camionneurs Carte régionaleLois et règlements Conditions générales d’occupation FAQ    
       
      COMMUNAUTÉ
       
      PRÉSENTATION DU PORT
      Commerçant maritime mondial Le Port en chiffres Statistiques Moteur de développement économique Le Port au fil de son histoire Niveaux d'eau Maison des marins Présentation et discours Publications Carnet de bord – Le magazine des amis du port Devenez un ami du port PhotosVidéos  
      ENGAGEMENT SOCIAL
      Développement durable Environnement  
       
      PROJETS
      Travaux secteurs Maisonneuve et Viau  
       
      CROISIÈRES
       
      CROISIÈRES INTERNATIONALES
      Arrivées et départs des navires Montréal, destination touristique Accès à la gare maritime FAQ Photos Vidéos Liens utiles  
      CROISIÈRES INTÉRIEURES
      Liens utiles  
       
      BATEAUX DE PLAISANCE
      Liens utiles
    • By mtlurb
      350 Maisonneuve
       
      Architectes: Menkès, Shooner, Dagenais, Letourneux
      Fin de la construction:2009
      Utilisation: Hôtel/Résidentiel
      Promoteur: SacresaCanada, Iber Management ( Espagne).
      Emplacement: Quartier des Spectacles, Montréal
      98 mètres (296 pieds) - 28 étages
      Description:
      - Le complexe en «L», comprendra environ 300 unités.

      Plus d'infos et d'images: http://www2.ville.montreal.qc.ca/ldvdm/jsp/ocpm/ocpm.jsp?laPage=projet14.jsp
      1b1.pdf
    • By alihoufani
      J'ai remarqué qu'on voit Montréal sur le menu du nouveau remake de Resident Evil 2. C'est un pur hasard parce que le jeu est fait au Japon et il ne se passe pas à Montréal, mais j'aime bien le background. 

    • By p_xavier
      https://www.tvanouvelles.ca/2019/01/04/en-route-vers-une-prochaine-station 
      Quelques erreurs dans le texte mais ça résume bien les projets STM en 2019.