Search the Community

Showing results for tags 'building'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Real estate projects
    • Proposals
    • Going up
    • Completed
    • Mass Transit
    • Infrastructures
    • Cultural, entertainment and sport projects
    • Cancelled projects
  • General topics
    • City planning and architecture
    • Economy discussions
    • Technology, video games and gadgets
    • Urban tech
    • General discussions
    • Entertainment, food and culture
    • Current events
    • Off Topic
  • MTLYUL Aviation
    • General discussion
    • Spotting at YUL
  • Here and abroad
    • City of Québec
    • Around the province of Québec.
    • Toronto and the rest of Canada
    • USA
    • Europe
    • Projects elsewhere in the world
  • Photography and videos
    • Urban photography
    • Other pictures
    • Old pictures

Calendars

There are no results to display.

There are no results to display.

Blogs

There are no results to display.

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About Me


Biography


Location


Interests


Occupation


Type of dwelling

Found 255 results

  1. Je vais déménager à Manhattan au mois d'Août. Je garde un pied-à-terre à Vancouver et reviens fréquemment à Montréal. Je viens de voir cette nouvelle toute fraiche. Je vais habiter tout juste à côté de Washington Square, et ce nouveau développement m'intéresse au plus haut point. J'esssaierai de vous en faire part régulièrement. Voici l'article du Wall Street Journal: First Look at NYU Tower Plan University Wants 38-Story Building on Village Site; Critics Fret Over Pei Design By CRAIG KARMIN New York University on Thursday expects to unveil its much-anticipated design plans for the proposed 38-story tower in Greenwich Village, one of the most ambitious projects in the school's controversial 25-year expansion plan. Before and after: The space between two towers designed by I.M. Pei, above, would be filled by a new tower, in rendering below, under NYU's plan. The tower, sight-unseen, is already facing backlash from community groups who say the building would interfere with the original three-tower design by famed architect I.M. Pei. Critics also say the new building would flood the neighborhood with more construction and cause other disruptions. The concrete fourth tower with floor-to-ceiling glass windows would be built on the Bleecker Street side of the site, known as University Village. It would house a moderate-priced hotel on the bottom 15 floors. The 240-room hotel would be intended for visiting professors and other NYU guests, but would also be available to the public. The top floors would be housing for school faculty. In addition, NYU would move the Jerome S. Coles Sports Center farther east toward Mercer Street to clear space for a broader walkway through the site that connects Bleecker and Houston streets. The sports complex would be torn down and rebuilt with a new design. Grimshaw Architects The plan also calls for replacing a grocery store that is currently in the northwest corner of the site with a playground. As a result, the site would gain 8,000 square feet of public space under the tower proposal, according to an NYU spokesman. NYU considers the new tower a crucial component of its ambitious expansion plans to add six million square feet to the campus by 2031—including proposed sites in Brooklyn, Governors Island and possibly the World Trade Center site—in an effort to increase its current student population of about 40,000 by 5,500. The tower is also one of the most contentious parts of the plan because the University Village site received landmark status in 2008 and is home to a Pablo Picasso statue. The three existing towers, including one dedicated to affordable public housing, were designed by Mr. Pei in the 1960s. The 30-story cast-concrete structures are considered a classic example of modernism. Grimshaw Architects, the New York firm that designed the proposed tower, says it wants the new structure to complement Mr. Pei's work. "It would be built with a sensitivity to the existing buildings," says Mark Husser, a Grimshaw partner. "It is meant to relate to the towers but also be contemporary." Grimshaw Architects NYU says the planned building, at center of rendering above, would relate to current towers. He said the new tower would use similar materials to the Pei structures and would be positioned at the site in a way not to cut off views from the existing buildings. Little of this news is likely to pacify local opposition. "A fourth tower would utterly change Pei's design," says Andrew Berman, executive director of the Greenwich Village Society for Historic Preservation. He says that Mr. Pei designed a number of plans about the same time that similarly featured three towers around open space, such as the Society Hill Towers in Philadelphia. Watch a video showing a rendering of New York University's proposed 38-story tower, one of the most ambitious projects in the university's vast 2031 expansion plan. The tower would be located near Bleecker Street in Manhattan. Video courtesy of Grimshaw Architects. Residents say they fear that the new tower would bring years of construction and reduce green spaces and trees. "We are oversaturated with NYU buildings," says Sylvia Rackow, who lives in the tower for public housing. "They have a lot of other options, like in the financial district, but they are just greedy." NYU will have to win permission from the city's Landmark Commission before it can proceed. This process begins on Monday when NYU makes a preliminary presentation to the local community board. Jason Andrew for the Wall Street Journal NYU is 'just greedy,' says Sylvia Rackow, seen in her apartment. Grimshaw. While the commission typically designates a particular district or building, University Village is unusual in that it granted landmark status to a site and the surrounding landscaping, making it harder to predict how the commission may respond. NYU also would need to get commercial zoning approval to build a hotel in an area designated as residential. And the university would have to get approval to purchase small strips of land on the site from the city. If the university is tripped up in getting required approvals, it has a backup plan to build a tower on the site currently occupied by a grocery store at Bleecker and LaGuardia, which would have a size similar to the proposed tower of 270,000 square feet. http://online.wsj.com/article/SB10001424052748704198004575311161334409470.html?mod=WSJ_hpp_MIDDLENexttoWhatsNewsForth
  2. This beautiful 1911 building has been under renovation for a year, transforming its 3 top floors into luxurious rental apartments (entrance at 1405 Bishop). The project is called "Bishop Lofts" although these seem like regular apartments. Buffalo Jeans will occupy most of the ground floor retail space, with a Mochico shoe store as neighbor.
  3. Je ne savais pas trop où mettre ce sujet, il y a un fil sur les rénovation, mais je crois qu'il devrait avoir une catégorie complète la dessus. Alors je lance cette proposition au admin. faire revivre le Cinema V sur la rue Sherbrooke en centre culutrel. The Gazette Source There's new hope for old building, Empress Cultural Centre executive says Will we ever see a sequel to landmark movie house? Its exterior is adorned with the faces of Egyptian nobility, enshrining a grandiose Hollywood pedigree, yet the former Cinema V movie house on Sherbrooke St. and Old Orchard Ave. in Notre Dame de Grâce seems unloved these days, and even more entombed in snow that the rest of us. The art deco building, first opened in 1927 as the Empress Theatre, was last used as a cinema in 1992. Following last month's $225,000 grant from the Côte des Neiges/Notre Dame de Grâce borough, the Empress Cultural Centre, as it is now called, might become the new home to the Black Theatre Workshop and the McGill Conservatory's Community Program, part of the Schulich School of Music at McGill University. The $6.5-million project includes a 300-seat theatre, rehearsal space and two medium-size halls for music, dance and theatre lessons. If Quebec kicks in the rest of the funding, the grand reopening could be in 2010. But will it actually happen? Businessperson and microbrewer Peter McAuslan is on the board of the Empress Cultural Centre. Gazette: Why should this plan succeed any more than previous ones? McAuslan: Because we finally have credible partners like the Black Theatre Workshop and the McGill Conservatory of Music. Until now, we had raised between $200,000 and $300,000 ourselves, but that was pretty much it. Now, the city has matched it (and a technical plan for the project has been agreed upon). The Black Theatre Workshop (as a performance production company) can apply for the grant from Quebec. Gazette: Some board members really went out on a limb (at one point cashing in their RRSPs to pay some back taxes on the property). Why was it so important to them? McAuslan: It's an elegant building and it's important to Montreal. The architects (Alcide Chaussé and Emmanuel Briffa) really reflected the public's fascination with art deco and with Egypt after King Tut's tomb was discovered in the 1920s. People came there to see movies and escape the blues of the Depression. It really became part of the fabric of the N.D.G. community, even more so later with the Cinema V. It's a place in time. Gazette: Why go to so much trouble relocating cultural groups? Aren't they just fine where they are? McAuslan: There is a huge synergy when you move several cultural groups, like music and theatre, into a shared space. The crossover between the disciplines is a benefit to everyone. This is the way of the future for the arts, trying to integrate instead of staying separate. In a shared space, other (smaller) arts groups also get access they wouldn't have otherwise. There will be vernissages and spinoffs. The centre will become part of the lifeblood of the local community, and not be shaped by a massive bureaucracy. N.D.G. is a very grassroots-oriented place. Gazette: Why is it taking so long? McAuslan: There has always been money available from governments, but there is a Byzantine application process and I don't really understand it. Now, we have people (involved in the project) who do understand how the machine works. You know, the Empress has never been designated as a heritage building. It's just had some good people, including the city (which bought it in 1999 for $571,000, and granted ownership to the corporation that became the Empress Cultural Centre) looking out for it. It's taking a long time, like many other arts projects in the city. But it is grinding its way to reality.
  4. Hi, I'm trying to find information about the patrimonial buildings of ''New City Gas of Montreal'' located inside Ottawa, Ann, Dalhousie and Wellington streets. Will there be any construction in the future? How high can the build? Any plans already available? Thank you for any info you might have!
  5. Read more: http://www.montrealgazette.com/Empress+Theatre+will+house+movie+theatre+commercial+offices/7199253/story.html#ixzz25hrcSoJI Nice to see that this landmark will be saved. I will for sure go check it out, when it is all renovated.
  6. 10 décembre 2013 Merci à MTLskyline pour cette découverte : http://forum.skyscraperpage.com/showthread.php?t=146803&page=120
  7. Repairs to Hélène de Champlain building force eatery to shut Restaurant's owner plans to close it down when lease expires at end of 2009 ALAN HUSTAK, The Gazette Published: 8 hours ago The building that houses the Hélène de Champlain restaurant on Île Ste. Hélène needs massive repairs, and the restaurant will close for good in 16 months when its lease expires. Pierre Marcotte, the French- language television personality who has leased the red sandstone building from the city since 1983, says the property needs between $3 million and $5 million in repairs. "We have no choice but to close," he said. "The city has decided not to renew its lease after 2009 in order to undertake the repairs. That could take a year or more to complete. The electrical and heating systems are outdated, and major repairs to the building itself are necessary." Initially meant to be a sports pavilion, the island chalet was built during the Depression as a Quebec government make-work project. It was designed by Émile Daoust to resemble a Norman château, and the grounds were landscaped by Frederick Todd. It was turned over to the city in 1942 and in 1955 became a municipal restaurant, but didn't get a liquor licence until 1960. In 1966, Mayor Jean Drapeau had the building redone as the official residence for Expo 67's Commissioner-General, Pierre Dupuy. It also had a hall of honour next to the main dining room that was used by Drapeau as a reception centre for visiting dignitaries and heads of state. The reception for French President Charles de Gaulle was held in the chalet after he delivered his controversial "Vive le Québec libre" speech. Even though the restaurant proved to be a money-loser, Drapeau kept its five dining rooms open until 1977, when they were closed because of a labour dispute. They reopened in 1981. Marcotte said he does not plan to renew his lease, and no one is certain what will happen to the building once the repair work is done. In the past, there has been talk of converting the site into a hotel for high rollers at the Montreal Casino. [email protected] thegazette.canwest.com
  8. Downturn Ends Building Boom in New York Charles Blaichman, at an unfinished tower at West 14th Street, is struggling to finance three proposed hotels by the High Line. NYtimes By CHRISTINE HAUGHNEY Published: January 07, 2009 Nearly $5 billion in development projects in New York City have been delayed or canceled because of the economic crisis, an extraordinary body blow to an industry that last year provided 130,000 unionized jobs, according to numbers tracked by a local trade group. The setbacks for development — perhaps the single greatest economic force in the city over the last two decades — are likely to mean, in the words of one researcher, that the landscape of New York will be virtually unchanged for two years. “There’s no way to finance a project,” said the researcher, Stephen R. Blank of the Urban Land Institute, a nonprofit group. Charles Blaichman is not about to argue with that assessment. Looking south from the eighth floor of a half-finished office tower on 14th Street on a recent day, Mr. Blaichman pointed to buildings he had developed in the meatpacking district. But when he turned north to the blocks along the High Line, once among the most sought-after areas for development, he surveyed a landscape of frustration: the planned sites of three luxury hotels, all stalled by recession. Several indicators show that developers nationwide have also been affected by the tighter lending markets. The growth rate for construction and land development loans shrunk drastically this year — to 0.08 percent through September, compared with 11.3 percent for all of 2007 and 25.7 percent in 2006, according to data tracked by the Federal Deposit Insurance Corporation. And developers who have loans are missing payments. The percentage of loans in default nationwide jumped to 7.3 percent through September 2008, compared with 1 percent in 2007, according to data tracked by Reis Inc., a New York-based real estate research company. New York’s development world is rife with such stories as developers who have been busy for years are killing projects or scrambling to avoid default because of the credit crunch. Mr. Blaichman, who has built two dozen projects in the past 20 years, is struggling to borrow money: $370 million for the three hotels, which include a venture with Jay-Z, the hip-hop mogul. A year ago, it would have seemed a reasonable amount for Mr. Blaichman. Not now. “Even the banks who want to give us money can’t,” he said. The long-term impact is potentially immense, experts said. Construction generated more than $30 billion in economic activity in New York last year, said Louis J. Coletti, the chief executive of the Building Trades Employers’ Association. The $5 billion in canceled or delayed projects tracked by Mr. Coletti’s association include all types of construction: luxury high-rise buildings, office renovations for major banks and new hospital wings. Mr. Coletti’s association, which represents 27 contractor groups, is talking to the trade unions about accepting wage cuts or freezes. So far there is no deal. Not surprisingly, unemployment in the construction industry is soaring: in October, it was up by more than 50 percent from the same period last year, labor statistics show. Experience does not seem to matter. Over the past 15 years, Josh Guberman, 48, developed 28 condo buildings in Brooklyn and Manhattan, many of them purchased by well-paid bankers. He is cutting back to one project in 2009. Donald Capoccia, 53, who has built roughly 4,500 condos and moderate-income housing units in all five boroughs, took the day after Thanksgiving off, for the first time in 20 years, because business was so slow. He is shifting his attention to projects like housing for the elderly on Staten Island, which the government seems willing to finance. Some of their better known and even wealthier counterparts are facing the same problems. In August, Deutsche Bank started foreclosure proceedings against William S. Macklowe over his planned project at the former Drake Hotel on Park Avenue. Kent M. Swig, Mr. Macklowe’s brother-in-law, recently shut down the sales office for a condo tower planned for 25 Broad Street after his lender, Lehman Brothers, declared bankruptcy in September. Several commercial and residential brokers said they were spending nearly half their days advising developers who are trying to find new uses for sites they fear will not be profitable. “That rug has been pulled out from under their feet,” said David Johnson, a real estate broker with Eastern Consolidated who was involved with selling the site for the proposed hotel to Mr. Blaichman, Jay-Z and their business partners for $66 million, which included the property and adjoining air rights. Mr. Johnson said that because many banks are not lending, the only option for many developers is to take on debt from less traditional lenders like foreign investors or private equity firms that charge interest rates as high as 20 percent. That doesn’t mean that all construction in New York will grind to a halt immediately. Mr. Guberman is moving forward with one condo tower at 87th Street and Broadway that awaits approval for a loan; he expects it will attract buyers even in a slowing economy. Mr. Capoccia is trying to finish selling units at a Downtown Brooklyn condominium project, and is slowly moving ahead on applying for permits for an East Village project. Mr. Blaichman, 54, is keeping busy with four buildings financed before the slowdown. He has found fashion and advertising firms to rent space in his tower at 450 West 14th Street and buyers for two downtown condo buildings. He recently rented a Lower East Side building to the School of Visual Arts as a dorm. Mr. Blaichman had success in Greenwich Village and the meatpacking district, where he developed the private club SoHo House, the restaurant Spice Market and the Theory store. He had similar hopes for the area along the High Line, where he bought properties last year when they were fetching record prices. An art collector, he considered the area destined for growth because of its many galleries and its proximity to the park being built on elevated railroad tracks that have given the area its name. The park, which extends 1.45 miles from Gansevoort Street to 34th Street, is expected to be completed in the spring. Other developers have shown that buyers will pay high prices to be in the area. Condo projects designed by well-known architects like Jean Nouvel and Annabelle Selldorf have been eagerly anticipated. In recent months, buyers have paid $2 million for a two-bedroom unit and $3 million for a three-bedroom at Ms. Selldorf’s project, according to Streeteasy.com, a real estate Web site. “It’s one of the greatest stretches of undeveloped areas,” Mr. Blaichman said. “I still think it’s going to take off.” In August 2007, Mr. Blaichman bought the site and air rights of a former Time Warner Cable warehouse. He thought the neighborhood needed its first full-service five-star hotel, in contrast to the many boutique hotels sprouting up downtown. So with his partners, Jay-Z and Abram and Scott Shnay, he envisioned a hotel with a pool, gym, spa and multiple restaurants under a brand called J Hotels. But since his mortgage brokers started shopping in late summer for roughly $200 million in financing, they have only one serious prospect for a lender. For now, he is seeking an extension on the mortgage — monthly payments are to begin in the coming months — and trying to rent the warehouse. (He currently has no income from the property.) It is perhaps small comfort that his fellow developers are having as many problems getting loans. Shaya Boymelgreen had banks “pull back” recently on financing for a 107-unit rental tower the developer is building at 500 West 23rd Street, according to Sara Mirski, managing director of development for Boymelgreen Developers. The half-finished project looked abandoned on two recent visits, but Ms. Mirski said that construction will continue. Banks have “invited” the developer to reapply for a loan next year and have offered interim bridge loans for up to $30 million. Mr. Blaichman cuts a more mellow figure than many other developers do. He avoids the real estate social scene, tries to turn his cellphone off after 6 p.m. and plays folk guitar in his spare time. For now, Mr. Blaichman seems stoic about his plight. At a diner, he polished off a Swiss-cheese omelet and calmly noted that he had no near-term way to pay off his debts. He exercises several times a week and tells his three children to curb their shopping even as he regularly presses his mortgage bankers for answers. “I sleep pretty well,” Mr. Blaichman said. “There’s nothing you can do in the middle of the night that will help your projects.” But even when the lending market improves — in months, or years — restarting large-scale projects will not be a quick process. A freeze in development, in fact, could continue well after the recession ends. Mr. Blank of the Urban Land Institute said he has taken to giving the following advice to real estate executives: “We told them to take up golf.” Correction: An article on Saturday about the end of the building boom in New York City referred incorrectly to the family relationship between the developers William S. Macklowe, whose planned project at the former Drake Hotel is in foreclosure, and Kent M. Swig, who shut down the sales office for a condominium tower on Broad Street after his lender, Lehman Brothers, declared bankruptcy. Mr. Swig is Mr. Macklowe’s brother-in-law, not his son-in-law.
  9. L'entreprise Temlam et sa filiale Jager Building Systems ont déclaré faillite lundi, mettant ainsi en péril 300 emplois. Pour en lire plus...
  10. En 2011m, il y a eu un désencrassage majeur pour cet édifice de McGill. Nous n'avions pas de fil sur le sujet. Avant : Après :
  11. Stewart Museum shuts for $4.5-million refit To reopen in 2010; military drills continue The Gazette Published: 9 hours ago The Stewart Museum in the Old Fort on Île Ste. Hélène has closed for 18 months for a $4.5-million renovation program. The museum, which attracts about 60,000 visitors a year, is housed in a 188-year-old building that needs to be upgraded to meet 21st-century standards. "It means bringing the building up to scratch," said Bruce Bolton, executive director of the Macdonald Stewart Foundation, which rents the facility from the city. The work will include the installation of elevators, new windows and a sprinkler system. Another $500,000 will be spent to refurbish the permanent collection of artifacts, which hasn't been touched since 1992. The city has leased the property to the Macdonald Stewart Foundation since 1963 for use as a military and maritime museum. In 1985 it became the Macdonald Stewart Museum, and in the '90s became simply the Stewart Museum in the Old Fort. The museum is expected to re-open in May 2010. When it does, it will offer a revised educational program of activities. "In the past we offered quite a few group activities, perhaps too many, so we plan to clean up the act," said Sylvia Neider Deschênes, the museum's communications chief. The museum will be closed, but the military drills in the parade square will continue. "We will not touch the two ceremonial military regiments, the Compagnie franche de la Marine and the 78th Fraser Highlanders," Neider Deschênes said. "That's one program that sets us apart from other museums. We're adamant about keeping them. All the military animation programs will run next summer."
  12. When the Milan Expo opens next year, the centerpiece building will be a masterpiece of sustainable engineering. Designed around the idea of an urban forest, the new Palazzo Italia will generate its own electricity, and will be clad in materials specifically designed to clean the surrounding air. The designers, Nemesi & Partners, are using photocatalytic cement - basically, concrete that's been mixed with titanium oxide. When the building material comes into contact with ultraviolet light, the titanium oxide reacts with nitrogen dioxide in the air, converting the pollutant to a salt that can easily be washed away. The building will open in time for the Expo's launch next May, and we're already planning to book a trip over so that we can spend a day sniffing the air next to the building.
  13. This is the same building as Angela Pizza. Walked by today, noticed some heavy renovations going on at "ground" floor level. All graffitis cleaned up. Peeked inside and saw plenty of ladders and fresh new walls. I think this is a handsome rugged building that deserves a facelift. Gives me NYC vibes. It's been abandoned for as long as I can remember though I think there was a dental clinic in there at some point. Googled a bit for 1668 Maisonneuve and found this listing as well as this Altus profile. [sTREETVIEW]https://maps.google.com/maps?q=maisonneuve+at+st-mathieu,+montreal&hl=en&ll=45.494924,-73.580168&spn=0.001765,0.004106&sll=45.55097,-73.702207&sspn=0.225754,0.525627&hnear=Maisonneuve+Blvd+W+%26+St+Mathieu+St,+Montreal,+Quebec,+Canada&t=m&z=19&layer=c&cbll=45.495001,-73.58008&panoid=-CcEf2QVZaTxF67hFVvEag&cbp=12,152.08,,0,-17.9[/sTREETVIEW]
  14. BMW Welt by Coop Himmelb(l)au wins best of Production at WAFl Awards 2008 BMW Welt, literally “the World of BMW”, is a hybrid exhibition and automobile delivery centre designed by Austrian practice Coop Himmelb(l)au. The multi-functional centre is divided in 5 key areas: Premiere, at the center of BMW Welt, where the vehicles are handed over to customers on rotating platforms, from where they can drive out of the building via a generously sized ramp; Lounge, integrated into the roof and virtually suspended over the delivery area, supported only by the utility service shafts and a column; Forum, located in the north wing of the building, a state of the art Auditorium for up to 1200 people; Tower, in the southwest, a multifunctional area with restaurants, exhibition, sales floors and administrative offices; Double Cone, resting on eleven columns, a full-service event realm extending over several levels, including a stage with its own catering infrastructure, rotating platforms and infrastructure connections for events. Wolf D. Prix, co-founder and design principal of Coop Himmelb(l)au described the project: "The concept behind the design envisions a hybrid building representing a mixture of urban elements. Not an exhibition hall, not an information and communication centre, not a museum, but instead all of these things, along a passage organized under one roof and horizontally and vertically layered. A conjoining of urban marketplace and stage for presentations”. The WAF judges chose it as the winner amongst 12 shortlisted entries in the Produciton category and defined the scheme as “deeply indebted to Le Corbusier´s enquiring mind and dedication to experimental culture” adding that “Wolf D. Prix pursues new meanings and forms in architecture.” Incidentally BMW Welt represents the zenith of Wolf D. Prix’s fascination with turning clouds into architecture, as his words testify: "From the very start we’ve wanted to build cloud architectures and cities that change like banks of clouds.” The centre was also one of the 10 RIBA European Awards winners in 2008. Laura Sal http://www.worldarchitecturenews.com/index.php?fuseaction=wanappln.projectview&upload_id=10552
  15. City planners take new look at urban vistas Frances Bula, Special to the Globe and Mail, March 30th, 2009 --------------------- Vancouver’s famous view corridors have prompted more anguished howls from architects than almost anything else I can think of over the years. Now, the city is looking at re-examining them. (And, as the sharp-eyed people at skyscraper.com have noted, the posting for people to run the public consultation went up on city website Friday. You can see their comments on the whole debate here.) You can get a flavour of the arguments from my story in the Globe today, which I’ve reproduced below. --------------------- Vancouver is legendary as a city that has fought to prevent buildings from intruding on its spectacular mountain backdrop and ocean setting. Unlike Calgary, which lost its chance to preserve views of the Rockies 25 years ago, or Toronto, which has allowed a highway plus a wall of condo towers to go up between the city and its lake, Vancouver set an aggressive policy almost two decades ago to protect more than two dozen designated view corridors. But now the city is entertaining re-examining that controversial policy, one that has its fierce defenders and its equally fierce critics, especially the architects who have had to slice off or squish parts of buildings to make them fit around the corridors. And the city’s head planner is signalling that he’s definitely open to change. “I’ve got a serious appetite for shifting those view corridors,” says Brent Toderian, a former Calgary planner hired two years ago, who has been working hard to set new directions in a city famous for its urban planning. “The view corridors have been one of the most monumental city-shaping tools in Vancouver’s history but they need to be looked at again. We have a mountain line and we have a building line where that line is inherently subjective.” The issue isn’t just about preserving views versus giving architects free rein. Vancouver has used height and density bonuses to developers with increasing frequency in return for all kinds of community benefits, including daycares, parks, theatres and social housing. A height limit means less to trade for those amenities. Mr. Toderian, who thinks the city also needs to establish some new view corridors along with adjusting or eliminating others, says a public hearing on the issue won’t happen until the fall, but he is already kicking off the discussion quietly in the hope that it will turn into a wide-ranging debate. “The input for the last few years has been one-sided, from the people who think the view corridors should be abolished,” he said. “But we’re looking forward to hearing what everyone thinks. Most people who would support them don’t even think about them. They think the views we have are by accident.” The view-corridor policy, formally adopted in 1989, was the result of public complaints over some tall buildings going up, including Harbour Centre, which is now, with its tower and revolving restaurant, seen as a defining part of the Vancouver skyline. But then, it helped spur a public consultation process and policy development that many say confused the goal of preserving views with a mathematical set of rules that often didn’t make sense. One of those critics is prominent architect Richard Henriquez, who said the corridors don’t protect the views that people have consistently said they value most from the city’s many beaches and along streets that terminate at the water. Instead, he says many of the view corridors are arbitrarily chosen points that preserve a shard of view for commuters coming into town. That has resulted in the city losing billions of dollars of potential development “for someone driving along so they can get a glimpse of something for a second.” And, Mr. Henriquez argues, city residents have a wealth of exposure to the city’s mountains throughout the region. “Downtown Vancouver is a speck of urbanity in a sea of views,” said Mr. Henriquez, who is feeling the problem acutely these days while he works on a development project downtown where the owners are trying to preserve a historic residential hotel, the Murray, while building an economically feasible tower on the smaller piece of land next to it. The view corridor means the building has to be shorter and broader and is potentially undoable. His project is one in a long list of projects that have been abandoned or altered because of view corridor rules in Vancouver. The Shangri-La Hotel, currently the tallest building in the city at 650 feet, is sliced diagonally along one side to prevent it from straying into the view corridor. At the Woodward’s project, which redeveloped the city’s historic department store, one tower had to be shortened and the other raised to fit the corridor. And architect Bing Thom’s plan for a crystal spire on top of a development next to the Hotel Georgia was eventually dropped because city officials refused to budge on allowing the needle-like top to protrude. But one person wary about the city tinkering with the policy is former city councillor Gordon Price. “When people talk about revisiting, it just means one thing: eroding,” said Mr. Price, still a vocal advocate on urban issues. “People may only get this fragment of a view but it’s very precious. And those fragments will become scarcer as the city grows. The longer they remain intact, the more valuable they become.” It’s a debate that’s unique to Vancouver. Mr. Toderian said that when he was in Calgary, there was no discussion about trying to preserve views from the downtown to the Rockies in the distance. --------------------- cet article n'est pas tres recent, mais je sais pas s'il avait deja ete poste sur ce forum. meme s'il y a des differences, a mon avis beaucoup de ces arguments pourraient s'appliquer aussi pour Montreal. est-ce qu'on devra attendre une autre vague de demande bousillee pour relancer le debat ?
  16. Statoil Fuel & Retail sells its Schweigaardsgate 16 property in Oslo 13 February 2013 – Statoil Fuel & Retail, a wholly-owned subsidiary of Alimentation Couche-Tard Inc. (Couche-Tard), sells its property at Schweigaardsgate 16, Oslo, Norway, together with the company’s planned European headquarters, to Entra Eiendom AS. Responsibility for building the headquarters is transferred to Entra Eiendom as part of the agreement. Statoil Fuel & Retail signs a long-term lease of the premises. “We are pleased with the agreement,” says Sonja Horn, project owner, Statoil Fuel & Retail. “Entra Eiendom is a solid, professional real estate developer who will add value both to the project and the local community. We look forward to moving into a modern, environmentally-friendly and flexible building, tailored to our needs.” Statoil Fuel & Retail’s strategy is to create value through real estate asset management. It is not strategically important for the company to own its planned European headquarters and the sale releases capital to be reinvested in the company’s core business. Statoil Fuel & Retail was acquired by Canadian company Couche-Tard before the summer of 2012. The company’s European headquarters will continue to be in Oslo and the new office building at Schweigaardsgate 16 will be shared with the company’s Norwegian business unit. The project to build the planned eight-storey building has the ambition to achieve “excellent” status according to the BREEAM classification system. To maintain the best possible sunlight conditions for Teaterplassen, the neighbouring square, some of the originally-designed volume has been redistributed, making the building appear to step down towards the square. The quality of the square will be improved when the building is finished. It will become about 25 percent larger than it is today and a new passage through the building will connect Teaterplassen with the adjacent Stasjonsalmenningen. Statoil Fuel & Retail has received the required building and demolition permits from the Norwegian Planning and Building Services (Plan- og bygningsetaten). Demolition of the existing building on the property begins this week. The company plans to move into its new headquarters in the first half of 2015. Statoil Fuel & Retail sells its Schweigaardsgate 16 property in Oslo
  17. http://montreal.ctv.ca/servlet/an/local/CTVNews/20100505/mtl_building_100505/20100505/?hub=MontrealHome Surprise surprise.
  18. http://montrealgazette.com/news/local-news/good-architecture-pays-french-expert <header class="entry-header" style="margin: 0px; padding: 0px; border: 0px; font-stretch: inherit; font-size: 15px; line-height: 24px; font-family: BentonSans-Regular, Arial, Helvetica, sans-serif; vertical-align: baseline; color: rgb(0, 0, 0);">The good, the bad and the ugly: French expert assesses Montreal architecture MARIAN SCOTT, MONTREAL GAZETTE More from Marian Scott, Montreal Gazette Published on: April 13, 2016 | Last Updated: April 13, 2016 7:00 AM EDT </header><figure class="align-none wp-caption post-img" id="post-783124media-783124" itemprop="associatedMedia" itemscope="" itemid="http://wpmedia.montrealgazette.com/2016/04/montreal-que-april-6-2016-emmanuel-caille-is-an-edito.jpeg?quality=55&strip=all&w=840&h=630&crop=1" itemtype="http://schema.org/ImageObject" style="margin: 0px 0px 2em; padding: 0px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; overflow: hidden; color: rgb(255, 255, 255); float: none;"><figcaption class="wp-caption-text" itemprop="description" style="margin: -1px 0px 0px; padding: 10px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; zoom: 1; text-align: right; background: rgb(12, 12, 12);"> Emmanuel Calle, editor of the French architecture magazine "d'a", at the Canadian Centre for Architecture. Caille shared his thoughts on Montreal's architecture. MARIE-FRANCE COALLIER </figcaption></figure>SHAREADJUSTCOMMENTPRINT What would an international expert think of Montreal’s recent architecture? To find out, the Montreal Gazette took French architecture critic Emmanuel Caille on a walking tour of downtown and Griffintown. He also visited the $52.6-million indoor soccer stadium that opened last year in the St-Michel district. Caille, the editor of the Paris-based architecture magazine “d’a”, was in town to take part in a panel discussion last week on architectural criticism, organized by the Maison de l’architecture du Québec and the Royal Architectural Institute of Canada (RAIC). Caille’s verdict on our fair city ranged from a thumbs-up for the pricey new soccer stadium to shocked incredulity over a new hotel annex to the Mount Stephen Club, a historic mansion at 1440 Drummond St. <figure id="attachment_783141" class="wp-caption post-img size_this_image_test align-center" itemprop="associatedMedia" itemscope="" itemid="photo url" itemtype="http://schema.org/ImageObject" style="margin: 0px auto 15px; padding: 0px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; overflow: hidden; color: rgb(255, 255, 255); float: none; max-width: 100%; width: 1000px;"><figcaption class="wp-caption-text wp-caption" style="margin: -1px 0px 0px; padding: 10px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; zoom: 1; text-align: right; background: rgb(12, 12, 12);"> The Mount Stephen Club. DARIO AYALA / MONTREAL GAZETTE </figcaption></figure>Built from 1880-83 for Lord Mount Stephen, the first president of the Canadian Pacific Railway, it has been in the news recently after suffering structural damage during construction of the annex. Caille, an architect as well as an editor, did not comment on the structural problems, but he did give a visual assessment of the hotel addition, an 11-storey cement-panel structure tucked behind the mansion. “It’s quite brutal in the city,” he said. From de Maisonneuve Blvd., the hotel addition presents a view of three blank walls with a shed-style roof. “It’s astonishing. It’s bizarre,” he said. Caille was also perplexed by the front façade, dotted with small windows of different sizes. “What is not obvious is what relationship there is between this building and the mansion. I don’t see any,” he added. The hotel addition shows why projects should not be conceived in isolation, Caille said. City planners should have put forward a vision for the entire block, which includes an outdoor parking lot on de la Montagne St. that would have made a better site for a high rise, he said. Interesting alleyways and outdoor spaces could have been included, he said. “Everybody is turning their back to one another,” he said of how the different properties on the block don’t relate to each other. At the Ritz-Carlton hotel on Sherbrooke St., Caille said a glass condo addition completed in 2013 is a good example of how to update a historic building for modern use. But he criticized white PVC windows on the hotel’s Sherbrooke St. façade for their thick frames and mullions, which don’t suit the building. “That’s horrible,” he said. “Windows are the eyes of a building. When women use an eye pencil to emphasize their eyes, it changes everything.” <figure id="attachment_783158" class="wp-caption post-img size_this_image_test align-center" itemprop="associatedMedia" itemscope="" itemid="photo url" itemtype="http://schema.org/ImageObject" style="margin: 0px auto 15px; padding: 0px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; overflow: hidden; color: rgb(255, 255, 255); float: none; max-width: 100%; width: 997px;"><figcaption class="wp-caption-text wp-caption" style="margin: -1px 0px 0px; padding: 10px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; zoom: 1; text-align: right; background: rgb(12, 12, 12);"> Construction workers work on the District Griffin condo project in Griffintown. DARIO AYALA / MONTREAL GAZETTE </figcaption></figure>In Griffintown, Caille was unimpressed by the banal architecture of condo towers that have sprouted in recent years in the former industrial district, which is undergoing rapid transformation. But the former Dow Planetarium at 1000 St-Jacques St. W. caught his eye. Built in 1966, it closed in 2011. The city turned it over to the Université du Québec’s École de technologie supérieure in 2013. ÉTS announced it would transform the building into a “creativity hub” but so far the building has sat vacant. Caille said the domed landmark has great potential to be recycled for a new vocation. “When a building is dirty and dilapidated, people don’t see its beauty. You have to see the beauty underneath the neglect,” he said. Today there is a consensus that older heritage buildings should be preserved but it’s still difficult to rally public opinion behind buildings from more recent eras, like the 1960s, Caille said. <figure id="attachment_783147" class="wp-caption post-img size_this_image_test align-center" itemprop="associatedMedia" itemscope="" itemid="photo url" itemtype="http://schema.org/ImageObject" style="margin: 0px auto 15px; padding: 0px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; overflow: hidden; color: rgb(255, 255, 255); float: none; max-width: 100%; width: 1000px;"><figcaption class="wp-caption-text wp-caption" style="margin: -1px 0px 0px; padding: 10px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; zoom: 1; text-align: right; background: rgb(12, 12, 12);"> The 26-storey Deloitte Tower between Windsor Station and the Bell Centre. DARIO AYALA / MONTREAL GAZETTE </figcaption></figure>The Deloitte Tower, a new 26-storey glass office tower between the Bell Centre and Windsor Station, is nothing to write home about, in Caille’s opinion. “It’s developer architecture,” he said. “There’s nothing interesting about it.” Built by developer Cadillac Fairview, it is part of the $2-billion, nine-tower Quad Windsor project. That includes the 50-storey Tour des Canadiens, which will be Montreal’s tallest condo tower for about a year, until the even taller nearby L’Avenue tower is completed. Most people don’t notice the difference between good and bad architecture when a building is new, Caille said. But over time, the defects of bad buildings grow increasingly obvious, while the good ones become beloved monuments, he said. “People go to New York to see the architecture of the 1920s and 30s,” he said, referring to landmarks like the 1931 Empire State Building and 1928 Chrysler Building. “Good architecture always pays off in the long term.” Unfortunately, much development is driven by short-term considerations, he said. While a developer can walk away from a mediocre building once it’s sold, city-dwellers are stuck with it, he said. “For him, it’s no problem. But for the city, it’s a tragedy,” he said. “Today’s architecture is tomorrow’s heritage,” he noted. Caille is a strong proponent of architectural competitions, which he sees as a way to seek out the best talents and ideas. “It forces people to think and it shows that for every problem, there are many solutions. It’s a way of accessing brainpower,” he said. <figure id="attachment_783196" class="wp-caption post-img size_this_image_test align-center" itemprop="associatedMedia" itemscope="" itemid="photo url" itemtype="http://schema.org/ImageObject" style="margin: 0px auto 15px; padding: 0px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; overflow: hidden; color: rgb(255, 255, 255); float: none; max-width: 100%; width: 1000px;"><figcaption class="wp-caption-text wp-caption" style="margin: -1px 0px 0px; padding: 10px; border: 0px; font-style: inherit; font-variant: inherit; font-weight: inherit; font-stretch: inherit; font-size: inherit; line-height: inherit; font-family: inherit; vertical-align: baseline; zoom: 1; text-align: right; background: rgb(12, 12, 12);"> Kids arrive at the the new soccer complex at the Complexe environnemental St-Michel. PHIL CARPENTER /MONTREAL GAZETTE </figcaption></figure>The St-Michel soccer stadium has been criticized for its high price tag but Caille hailed it as an example of excellent design. The ecological building designed by Saucier & Perrotte has three glass walls overlooking a park in the St-Michel environmental complex. Caille said the stadium could be a catalyst for improvements in the hardscrabble north-end neighbourhood. During Tuesday’s panel discussion, Paul Goldberger, a Pulitzer Prize-winning former architecture critic for the New York Times and the New Yorker, said that unlike other types of journalists, architectural critics rarely have an immediate impact on public opinion. “Architectural criticism must take a very long view,” he said. “One learns to think of one’s influence as more gradual, as shifting tastes and judgment over time.” Goldberger, author of books including Why Architecture Matters, published in 2009, has written that the critic’s job is not to push for a particular architectural style, but rather to advocate for the best work possible. He said the time in his career when architectural criticism enjoyed greatest prominence was following Sept. 11, 2001, during discussions over the rebuilding of the World Trade Center. “It was a time when architectural criticism really was, I think, front and centre in the public discourse,” he said. “There it was so clear that an issue of architecture was intimately connected to significant world affairs and one did not have to struggle to help people understand the connection between architecture and the rest of the world,” said Goldberger, who now writes for Vanity Fair and teaches at The New School in New York. In a 2011 review of the new World Trade Center for the New Yorker, Goldberger said the design by architect Daniel Libeskind “struck a careful balance between commemorating the lives lost and reestablishing the life of the site itself.” The panel discussion followed the awarding of two $1,000 prizes to young writers for architectural writing on the topic of libraries. The winning entries by Marie-Pier Bourret-Lafleur and Kristen Smith will be published respectively in Argus and Canadian Architect magazines. [email protected] Twitter.com/JMarianScott
  19. Je ne peux que sourire quand je vois ce building... WestAust pourrait changer sa paire de culottes!
  20. http://www.montrealgazette.com/Canada+driversdeserve+Roads+Czar/4434450/story.html I am not thinking highly of a federal office to solve problems. That said, the monies recieved from at least the federal gasoline and diesel excise tax & GST on gasoline should be invested in roads and highways and not the BS black hole it goes into currently (notwithstanding various federal-aid highway projects which seem to be common, like A-30, A-85, Montreal bridges, Calgary & Edmonton ring roads, NB Route 2 etc, the total investment is still much less than the excise revenues).
  21. La succursale va fermer. C'est incroyable. On dirait presque un canular. Perte immense pour le patrimoine de Montréal... *** Royal Bank abandons historic 360 St. Jacques building June 23, 2010. 1:57 pm • Section: Metropolitan News The Royal Bank of Canada is closing its historic branch in Old Montreal, in what was once the tallest building in the British Empire and the bank’s head office. The image above, from Google Earth, shows the building (in the middle, foreground) and the skyscrapers that followed it. The bank has more on the history of the Montreal landmark here and here. And check out this city of Montreal history. This story appeared in the Granby Leader-Times on March 4, 1927: http://blogs.montrealgazette.com/2010/06/23/royal-bank-abandons-historic-360-st-jacques-building/