I was wondering if this facelift of the Bell Center was cancelled or some aspects of it were removed. Apparently there is supposed to be a video screen installed outside of the Bell Center but I don't think its there.
https://www.cbc.ca/news/canada/montreal/bell-centre-pedestrian-zone-plan-1.3270492