theWestisDead
Membre-
Compteur de contenus
91 -
Inscription
-
Dernière visite
Informations sur le membre
-
Location
st. lambert
-
Intérêts
history
-
Occupation
student
theWestisDead's Achievements
-
I think they really need to come up with a global plan for the building. This gradual, piecemeal replacement of concrete with windows makes Place Bonaventure look even worse.
-
May 29
-
ville-marie Holiday Inn Montréal Centre-Ville - 37 étages (2017)
theWestisDead a répondu à un sujet de mtlurb dans Complétés
I don't understand why this project is being built here, I thought the YUL project was going to take up the whole block. Is YUL still going to build twin towers with the Holiday Inn tower sitting right next to it? This seems rather poorly planned. -
ville-marie Tour Deloitte - 26 étages (2015)
theWestisDead a répondu à un sujet de mtlurb dans Complétés
Is it just me or has construction on this tower really slowed down? It seems like each new floor takes forever and maybe one window get installed per week. Or maybe I would just really like to see the finished product! -
I don't get it, I thought Ogilvy's had been trying to buy-out Wanda's forever for their huge development and now some random condo developer is going to get the site and build some ugly tower instead?
-
Walter sur Atwater - 6 étages (2014)
theWestisDead a répondu à un sujet de ça coute cher dans Complétés
Why is this still in the Approved section and not Under Construction? Nice little project in any case, definitely a solid addition to the area. -
All that grey brick looks terrible! So cheap... They really ruined what could have been a great project. They should have at least kept the darker colour like in the renders or used more brown brick to keep the 'vintage' look.
-
griffintown Les Bassins du Nouveau Havre (Projet global)
theWestisDead a répondu à un sujet de Miska dans En Construction
I'm sure more complicated demolitions than this have been accomplished without any problems, you just have them implode and collapse in on themselves. The only problem would be a huge dust cloud but even that would be a relatively minor inconvenience. -
Hôtel de la Montagne - 21 étages (1975-2014)
theWestisDead a répondu à un sujet de eastender85 dans Immeubles détruits
Its installing new air ventilation units on the roof.- 171 réponses
-
- 1975-2014
- aujourdhui
- (et 5 en plus)
-
griffintown Les Bassins du Nouveau Havre (Projet global)
theWestisDead a répondu à un sujet de Miska dans En Construction
I wonder if those graffiti covered silos will be demolished eventually. -
ville-marie 21e Arrondissement - 9, 10, 14, 14, 14 étages (2020)
theWestisDead a répondu à un sujet de IluvMTL dans Complétés
Are there any updates on this project, units sold, start of construction? -
That giant black wall really adds a lot to the skyline doesn't it? Beautiful modern architecture, harmonious with its surroundings, yup a real masterpiece for Montreal.
-
The same problem with all the Griffintown condos...
- 425 réponses
-
- appartements
- architecte
- (et 15 en plus)
-
Fermeture du Delta Centre-Ville le 31 Octobre 2013
theWestisDead a répondu à un sujet de WestAust dans L'actualité
Student housing does not fit with this property AT ALL...Its a long, uphill walk to McGill and Concordia and being right on the border of Old Montreal and Downtown its perfectly positioned to be a prestige property that attracts business clientele and tourists not frat parties and low-income students (of which i'm one). The building should be renovated top to bottom and remain a hotel with improved services and attractions. This is really poor planning all around. -
ville-marie Condominiums Maritime Montréal - 39 étages
theWestisDead a répondu à un sujet de swansongtoo dans Projets Annulés
I'm really glad this was cancelled, I think they need o tear down the whole site and start from scratch rather than preserve a tacky, 60s-era revolving restaurant. If that's what counts as heritage these days then I think we need to rethink what it means.