Nom: Laur&nt Clark
Hauteur en étages: 20, 25
Hauteur en mètres:
Coût du projet:
Promoteur: Rachel Julien
Architecte: Menkes Shooner Dagenais Letourneux
Entrepreneur général:
Emplacement: 1 de Maisonneuve Ouest
Début de construction:
Fin de construction:
Site internet: http://laurent-clark.com
Lien webcam:
Autres informations:
Rumeurs:
Aperçu artistique du projet: 

laurent-clark.jpg

Maquette:
Autres images:
Vidéo promotionnelle: 

Partager ce message


Lien à poster
Partager sur d’autres sites

Architectes: ?

Fin de la construction:?

Utilisation: Résidentiel

 

Emplacement: Quartier des spectacles, Montréal

 

 

slebkc3.png

 

214670.jpg

 

Photos de la maquette du projet, comprenant également la phase 2

3260853183_a5651097df_b.jpg

3260853031_1879bd713e_b.jpg

 

Les travaux devraient débuter pour la construction des stationnements lorsque ceux de la phase 1 seront tous vendus, et la construction de la tour lorsque que la presque totalité de la phase 1 sera vendue.

 

Finalement entré chez moi avec une vue magnifique sur les parcs et la Place des Arts. Selon le garde de sécurité, nous sommes environs 10 qui ont déjà aménagé. Le reste devrait suivre d'ici juillet.

 

Ce que j’ai entendu dire pour la phase 2 est que le creusage devrait débuter cet automne pour commencer les stationnements et quand ce sera fait, les préventes de la phase 2 commenceront en 2011.

 

 

 

http://www.loftsdesarts.com

 

La maquette et l'évocation devraient changer d'ici au lancement officiel de la phase 2 en raison du réalignement du boulevard Maisonneuve qui ne sera plus courbé à cet endroit.

Modifié par monctezuma

Partager ce message


Lien à poster
Partager sur d’autres sites

aside:

 

overall, it's really hard to believe that the city could have allowed the core to get so bad. honestly, i've been to detroit, and there's a strong resemblance. within a scant 10 square blocks, we have:

 

1. the monstrous habitations jeanne-mance

2. the disgraceful stretch of main between st norbert all the way to gauchetiere and over that god damned ville-marie past craig.

3. the ilot st dominque/berger.

4. boulevard rene-levesque.

5. rue clark.

6. that piece of shit federal building that was built over the square.

7. the empty lots and surface parking throughout.

8. the hasty demolition of the "best buy" site, a stupid project that was rushed through for the worst of reasons.

9. the heinous street presence of the complex desjardins.

 

the only thing the area didn't have was the ilot voyageur and the "pepsi" forum.

 

now, for a city with extremely limited means and almost no office or condo market, getting the province on board for the balmoral developments and the street realignments is smart. it gets some of the worst of it taken care of, puts some people to work, and could well kick start further developments in the area. i just hope to god that 22-2 and that erstwhile hydro quebec project are built out because really, with the way these jokers have run the show over the last couple decades, there's no chance at all that we'll see the area restored organically.

 

also, a further aside: wtf - why is there no movement or even talk of tearing down the habitations jeanne-mance? the mayor ought to be raising the devil over that development. a wholesale rezoning project could add a thousand new market units there (in addition to the new social units to modern code), finance social housing throughout the city, and revitalize an entire section of the city ...and do so just as the city takes on the 90% burden.

Partager ce message


Lien à poster
Partager sur d’autres sites
also, a further aside: wtf - why is there no movement or even talk of tearing down the habitations jeanne-mance? the mayor ought to be raising the devil over that development. a wholesale rezoning project could add a thousand new market units there (in addition to the new social units to modern code), finance social housing throughout the city, and revitalize an entire section of the city ...and do so just as the city takes on the 90% burden.

 

I'm working on a realistically plausible vision for Jeanne-Mance.

 

I'll make a post about it soon with pics and renderings.

 

My plan is, basically: Bulldoze the whole area, reconnect the street grid, build high-density mixed-use all over the place, with some green spaces here and there.

Partager ce message


Lien à poster
Partager sur d’autres sites
aside:

 

overall, it's really hard to believe that the city could have allowed the core to get so bad. honestly, i've been to detroit, and there's a strong resemblance. within a scant 10 square blocks, we have:

 

1. the monstrous habitations jeanne-mance

2. the disgraceful stretch of main between st norbert all the way to gauchetiere and over that god damned ville-marie past craig.

3. the ilot st dominque/berger.

4. boulevard rene-levesque.

5. rue clark.

6. that piece of shit federal building that was built over the square.

7. the empty lots and surface parking throughout.

8. the hasty demolition of the "best buy" site, a stupid project that was rushed through for the worst of reasons.

9. the heinous street presence of the complex desjardins.

 

the only thing the area didn't have was the ilot voyageur and the "pepsi" forum.

 

now, for a city with extremely limited means and almost no office or condo market, getting the province on board for the balmoral developments and the street realignments is smart. it gets some of the worst of it taken care of, puts some people to work, and could well kick start further developments in the area. i just hope to god that 22-2 and that erstwhile hydro quebec project are built out because really, with the way these jokers have run the show over the last couple decades, there's no chance at all that we'll see the area restored organically.

 

also, a further aside: wtf - why is there no movement or even talk of tearing down the habitations jeanne-mance? the mayor ought to be raising the devil over that development. a wholesale rezoning project could add a thousand new market units there (in addition to the new social units to modern code), finance social housing throughout the city, and revitalize an entire section of the city ...and do so just as the city takes on the 90% burden.

 

Nice first post . ( At least nice first post I read from you!)

Partager ce message


Lien à poster
Partager sur d’autres sites

J'ai surtout hâte de voir la réaction du privé au QdS.

 

À date, seul le Louis-Bohème peut être considéré comme un projet privé qui est venu en raison du QdS.

 

Le Concorde, le 400 Sherbrooke et les Lofts des Arts étaient tous des projets qui étaient en branle avant l'annonce du QdS.

 

Sinon, la Maison du Jazz, le 2-22, l'OSM et la Place des Arts + infrastructures sont que du public.

Partager ce message


Lien à poster
Partager sur d’autres sites

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !

Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.

Connectez-vous maintenant

  • Contenu similaire

    • Par LeTravailleur
      ESPACE MONTMORENCY
       
      Emplacement : Laval-des-Rapides, Laval
       
      Adresse : Boul. Le Corbusier, Laval, QC
       
      Superficie : 1 470 132 pi.ca.
       
      Catégorie : Usages mixtes
       
      Description : Situé à Laval, le projet Espace Montmorency est un concept audacieux dans le domaine de développement d’espaces à bureaux.
      Développé en collaboration avec le Fonds immobiliers de solidarité FTQ, et Claridge, Espace Montmorency est inspiré par des modèles révolutionnaires. Espace Montmorency est un projet immobilier emblématique qui se déroulera en 4 phases et regroupera une dizaine d’immeubles qui pourront atteindre 20 étages à leur point culminant, offrant plus de 1 million de pieds carrés d’aire louable.
      Nous proposons un modèle de conception qui favorise la multiplication des occupants. Le bâtiment sera composé de plusieurs unités de bureaux avec terrasses, cela permettra également de créer plus d'espace pour les réunions sociales.
      Directement relié à la station Métro Montmorency, le projet est situé à 20 minutes du centre-ville de Montréal via un accès souterrain. Avec la Place Bell au sud ; Urbania au nord ; Espace Montmorency contribuera à la création du nouveau centre-ville de Ville de Laval.
      Le projet vise une certification LEED Or.
       
      Source : http://groupemontoni.com/nos-projets-en-cours/campus-ftq-espace-montmorency/
       
       
       

       

       

       

       

       

       

       

       
      Images : Sid Lee Architecture
    • Par WestAust
      Nom: QUAD Windsor
      Hauteur en étages:
      Hauteur en mètres:
      Coût du projet:
      Promoteur: Cadillac Fairview
      Architecte: Adrian Smith + Gordon Gill Architecture
      Entrepreneur général:
      Emplacement: 600 et 750 Peel
      Début de construction:
      Fin de construction:
      Site internet:
      Lien webcam:
      Autres informations: 
      Rumeurs:
      Aperçu artistique du projet:

      Maquette:
      Autres images:
      Vidéo promotionnelle: 
    • Par ScarletCoral
      Quand je suis passée à côté cet après-midi, ça creusait dans une partie du stationnement coin William/Prince
       

    • Par JPG
      Inverness
      Nouveau projet en construction, situé à proximité des métros Villa-Maria et Vendôme, des rues Sherbrooke, Victoria et Monkland, de l'hôpital CUSM, à une distance de marche de Westmount, parcs et écoles.
      Nom du projet: Inverness
      Adresse: 3475 avenue Prud'homme, Notre-Dame-de-Grâce
      Usage: résidentiel / 11 logements
      Architecte: ADHOC Architectes
      Paysage et design urbain: Turquoise Design
      Promoteur: KnigthsBridge
      Particularités: Mixité de typologies incluant des 3 1/2, 4 1/2 et 5 1/2. Une architecture contemporaine au jeu de maçonnerie élaboré. La certification LEED est visée.
      Pour plus de détails cliquez ici -> Inverness
       


    • Par loulou123
      remplacé par un message d'entête plus à jour