Recommended Posts

Remember that Tunnel building on De Maisonneuve? This picture is from 1992. Any idea when this building was torn down?

 

WOW, incredible. I had already forgotten about this building. I remember driving under this thing everytime I went to concordia!

 

I think it was torn down in 2001?? Yes, the Lépines Towers stand there now!

Modifié par Habsfan

Partager ce message


Lien à poster
Partager sur d’autres sites

Here's one from 1970. As we can see, there is a different building on the land the Roc Fleuri has been built on as well. The white building has a different facade on the front, but the same one facing westward.

 

3640401903_dc9ff00caa.jpg

 

Click on the image for full-size.

 

A similar angle today: (from wikipedia)

800px-De_Maisonneuve_Ouest.jpg

Modifié par MTLskyline

Partager ce message


Lien à poster
Partager sur d’autres sites

Yes i remember that, when I was a kid, I was fascinated how we could drive right under a building lol...

 

I may have pics of the demolition in my archives.

Partager ce message


Lien à poster
Partager sur d’autres sites

What happened to this building? Even in the photos from 1992 and 1970, there is a awful looking white/grey paneling on the wall facing De Maisonneuve. I've had class in there before. It's quite nice inside.

 

I'm guessing that it was a side affect of the creation of De Maisonneuve Boulevard? They must have widened the street and sliced part of that building off to make room.

 

3559639309_f1af77031b_b.jpg

De Maisonneuve / Drummond

Modifié par MTLskyline

Partager ce message


Lien à poster
Partager sur d’autres sites

Le Drummond Court building, dont une partie abritait l'ancien YMCA, a été démoli à l'automne 2000.

 

C'est mentionné sur le site de Pomerleau.

 

Le Mirror en avait aussi parlé en 1999.

 

But the Drummond Court passageway was something of an accident. The 75-year-old building's main floor originally took up the entire space now claimed by de Maisonneuve. In the 1960s, when the metro was under construction and de Maisonneuve was being widened, the city tried--and failed--to expropriate the building. A compromise was reached: the building would give up half its ground floor, but would remain standing above the boulevard.
Modifié par monctezuma

Partager ce message


Lien à poster
Partager sur d’autres sites
What happened to this building? Even in the photos from 1992 and 1970, there is a awful looking white/grey paneling on the wall facing De Maisonneuve. I've had class in there before. It's quite nice inside.

 

I'm guessing that it was a side affect of the creation of De Maisonneuve Boulevard? They must have widened the street and sliced part of that building off to make room.

 

Exactly, the building was disfigured when de Maisonneuve was enlarged.

It's a shame because the Eastern and Western facades are really nice looking.

Partager ce message


Lien à poster
Partager sur d’autres sites

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !

Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.

Connectez-vous maintenant

  • Contenu similaire

    • Par IluvMTL
      Nom: Le Drummond
      Hauteur en étages: 24
      Hauteur en mètres:
      Coût du projet:
       
      Promoteur: Samcon
      Architecte:
      Entrepreneur général:
      Emplacement:
       
      Début de construction:
      Fin de construction:
       
      Site internet: http://www.samcon.ca/drummond/
       
      Lien webcam: http://www.samcon.ca/condo/142-drummond.html?gclid=Cj0KEQjwz-i3BRDtn53Z5Z7t4PUBEiQA23q2ALukNatNh9-vDAFYuckz5BppIm8lzcDZMusYcG6lS-0aAmMA8P8HAQ
       
      Autres informations:
       
      * Possibilité d'une 2ème phase au nord
       
      Rumeurs:
       
      Aperçu artistique du projet:
       

       
      Maquette:
       
      Autres images:
       
      Vidéo promotionnelle:
    • Par Ju HG
      Hôtel 1000-1006 de la Montagne et Appartements 947 Lucien-L'Allier - 26, 41 étages

      Condos Laurent & Clark - 20 étages

       
      Condos Babylone - 26 - 37 étages

       
      Condominium Maritime Montréal - 39 étages

       
      Quad Windsor -

       
      Tour Peel - 20 étages

       
      Tour des Canadiens 3 - 37 ou 49 étages

       
       
       
       
      Tour Bleury - 25 étages

       
       
       
    • Par Mondo_Grosso
      En navigant le site web de Samcon, dans la section "PROJETS À VENIR", on apercevoit que le Drummond aura une phase 3. Il n'y a pas de détails en ce moment, mais bon.
       
       

    • Par mtlurb
      Nom: Tour Deloitte
      Hauteur en étages: 26
      Hauteur en mètres: 135
      Coût du projet: 100 000 000,00$
       
      Promoteur: Cadillac Fairview
      Architecte: KPF et Groupe IBI DAA
      Entrepreneur général: PCL Constructors / Construction C.A.L.
      Emplacement: http://www.mtlurb.com/forums/attachment.php?attachmentid=4423&d=1340458961
       
      Début de construction: Octobre 2012
      Fin de construction: Juin 2015
       
      Site internet: http://latourdeloitte.ca/
       
      Lien webcam:
       
      Autres informations:
       
      * Louée à 70.3% (septembre 2013)
      * 48 000m2 (514 000p2) de superficie de bureaux
      * Édifice LEED platine
      * Le locataire principal sera la firme Deloitte pour 160 000p2
      * Rio Tinto Alcan sera locataire des étages 18 à 26
      * Signature, 32-foot-high lobby facing the historic Windsor Court
      * Outdoor courtyard with a skating rink, public seating and park area qui sera nommé "Cour Rio Tinto Alcan"
      * Bush shed (a heritage-designated remnant of Windsor Station's original rail platforms) will be incorporated into the window line of the courtyard-level lobby
      * 135 mètres
       
      Rumeurs:
       
      Aperçu du projet:
       

       
      9 autres images: http://mtlurb.com/forums/showthread.php?p=146231#post146231
       
      Vidéo promotionnelle:
    • Par IluvMTL
      Nom: Hilton Hampton Inn & Suites – Montreal
      Hauteur en étages: 12 ou 13 étages
      Hauteur en mètres:
      Coût du projet: 
      Promoteur: Quintcap
      Architecte:
      Entrepreneur général:
      Emplacement: sur le côté ouest de la rue Drummond, entre le boulevard René-Lévesque et la rue Sainte-Catherine
      Début de construction: 
      Fin de construction: 
      Site internet:
      Lien webcam: 
      Autres informations: Le projet aura une bannière Hilton Hampton Inn & Suites, le projet prévoit la reconstruction d'une façade patrimonial  http://ville.montreal.qc.ca/documents/Adi_Public/CA_Vma/CA_Vma_ODJ_ORDI_2013-02-12_19h00_FR.pdf
      Rumeurs: 
      Aperçu artistique du projet: 
      Rendu de 2013:

      Maquette: 
      Autres images: 
      Vidéo promotionnelle: