Aller au contenu

Tour Deloitte - 26 étages (2015)


mtlurb

Messages recommendés

  • Administrateur

Nom: Tour Deloitte

Hauteur en étages: 26

Hauteur en mètres: 135

Coût du projet: 100 000 000,00$

 

Promoteur: Cadillac Fairview

Architecte: KPF et Groupe IBI DAA

Entrepreneur général: PCL Constructors / Construction C.A.L.

Emplacement: http://www.mtlurb.com/forums/attachment.php?attachmentid=4423&d=1340458961

 

Début de construction: Octobre 2012

Fin de construction: Juin 2015

 

Site internet: http://latourdeloitte.ca/

 

Lien webcam:

 

Autres informations:

 

* Louée à 70.3% (septembre 2013)

* 48 000m2 (514 000p2) de superficie de bureaux

* Édifice LEED platine

* Le locataire principal sera la firme Deloitte pour 160 000p2

* Rio Tinto Alcan sera locataire des étages 18 à 26

* Signature, 32-foot-high lobby facing the historic Windsor Court

* Outdoor courtyard with a skating rink, public seating and park area qui sera nommé "Cour Rio Tinto Alcan"

* Bush shed (a heritage-designated remnant of Windsor Station's original rail platforms) will be incorporated into the window line of the courtyard-level lobby

* 135 mètres

 

Rumeurs:

 

Aperçu du projet:

 

del.jpg

 

9 autres images: http://mtlurb.com/forums/showthread.php?p=146231#post146231

 

Vidéo promotionnelle:

Modifié par SkahHigh
Lien vers le commentaire
Partager sur d’autres sites

  • Administrateur
  • Administrateur

yes and no, but this will also mean that some vacant and underperforming buildings/lots will be sold to people who want to develop them, not like the CP who just lay them there underused.

Lien vers le commentaire
Partager sur d’autres sites

Images

 

cf.jpg

 

Sanstitre-1.png

 

Posté par Lefcoaster sur SSP

Tour de bureau de 27 étages, 133 mètres

 

ps2e.png

 

ps3l.png

 

ps4q.png

 

ps5o.png

 

Small pic, but I figured I might as well share it anyways

 

main.php?g2_view=core.DownloadItem&g2_itemId=10864

 

Le petit preview du PDF:

 

8327598_179x239.png

 

(edit: arrg encore devancé d'une minute par MartinMtl! Je vais te laisser mettre les images :P)

 

La base sera très impressionnante!!!

 

windsor.png

Modifié par monctezuma
Lien vers le commentaire
Partager sur d’autres sites

  • 5 mois plus tard...

Habs owner buys Windsor Station

Thu, 2008-01-10 06:10.

Richard Deschamps

CJAD news has learned Canadiens owner George Gillett has purchased historic Windsor Station.

There's no word on the purchase price, or what he plans to do with it.

 

Windsor Station served as the city's main train station until the late 1970s, when Central Station took over. It continued to serve as a commuter train terminal, until the Bell Centre was built in the 1990s. It was then replaced by what's now known as the Lucien L'Allier station.

Lien vers le commentaire
Partager sur d’autres sites

CJAD news has learned Canadiens owner George Gillett has purchased historic Windsor Station.

There's no word on the purchase price, or what he plans to do with it.

 

Son of a bitch!!!:yikes: I wonder what Uncle George will do with Windsor Station?

 

This might not be a bad thing!

Lien vers le commentaire
Partager sur d’autres sites

I think that George Jr. and GEG in general have had a positive impact on the city of Montreal. In that respect, whatever Gillett decides to do with Windsor Station will most likely be good news.

 

I agree...I just hope that the Nimby's won't come out in full force to hinder his plans!

Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.


Countup


×
×
  • Créer...