I don't know why but I have a feeling that Valérie decided to put this on hold to "rethink" the project.. more time and money wasted. Havent we waited long enough for this? Get construction going already!

  • Like 1
  • Confused 1
Lien vers le commentaire
Partager sur d’autres sites

24 minutes ago, joaosax said:

I don't know why but I have a feeling that Valérie decided to put this on hold to "rethink" the project.. more time and money wasted. Havent we waited long enough for this? Get construction going already!

What makes you say that?  Haven't the contracts been issued? Hasn't the work started?

http://m.portailconstructo.com/actualites/debut_travaux_pour_projet_esplanade_clark

Début des travaux pour le projet de l’esplanade Clark

13 septembre 2017

Début des travaux pour le projet de l’esplanade Clark

La Ville de Montréal a procédé ce lundi 11 septembre 2017 à la première pelletée de terre du projet de l’esplanade Clark.

Le projet comprend l’aménagement d’une place publique et la construction d’un pavillon multifonctionnel. Ce nouveau lieu sera constitué d’une partie gazonnée et d’une place publique minérale. Il accueillera des spectacles pendant la saison des festivals et une patinoire réfrigérée en hiver.

 

Le projet, dont le coût s’élève à 67,1 millions de dollars, inclut aussi le réaménagement de la rue Clark, la réfection de la chaussée et du trottoir sud de la rue De Montigny, ainsi que divers travaux d’aménagement dans les phases précédentes du pôle Place des Arts.

 

Vue aérienne du projet de l'esplanade Clark - Photo de la Ville de Montréal

 

Les étapes du projet

Des travaux d’excavation et de décontamination se dérouleront de septembre à décembre 2017 sur le terrain situé entre les rues Sainte-Catherine, Clark et De Montigny.

 

À partir du printemps 2018 et jusqu’à l’automne 2019, le pavillon multifonctionnel et la place publique seront réalisés. On procédera aussi à l’installation du mobilier urbain et au verdissement. Des travaux d’aménagement des rues Clark et De Montigny, incluant notamment le remplacement et la modernisation des infrastructures souterraines et la plantation d’arbres, seront également effectués au cours de cette période.

 

Rappelons que les travaux de l’esplanade Clark se feront dans le cadre du Fonds Chantiers Canada-Québec, volet Grands projets. Ce projet, dont le concept a été dévoilé le printemps dernier, représente la dernière étape de la réalisation du Quartier des spectacles. Il sera suivi par le réaménagement de la rue de Bleury.

 

Source : Ville de Montréal

Fichier attaché Taille
projet-esplanade-clark_actu2.jpg 107.36 Ko
projet-esplanade-clark_actu2-p.jpg 26.3 Ko
  • Thanks 1
Lien vers le commentaire
Partager sur d’autres sites

il y a 22 minutes, joaosax a dit :

Yup but the site has been abandoned since last December... No workers in sight.

Ill try to call the city to see what's the status. This is what it currently looks like:

 

5a7296cf5aba5_Quartierdesspectaclesenchantieren2018-01.jpg.47118a915d5246da92d235a03382a893.jpg

 

Ils attendent probablement le dégel avant de poursuivre les travaux, non?

Lien vers le commentaire
Partager sur d’autres sites

Hum peut-etre, but seeing the construction nearby for Laurent-Clark, they never stopped digging even during the colder months. Not sure if for this project they were on a tight budget and decided to stop during winter.

Oh well, hopefully you are right!

Lien vers le commentaire
Partager sur d’autres sites

Digging is less of an issue than pouring concrete in winter conditions.

You need to protect and heat the ground or formwork before you pour, then you need to add special additives to the concrete mix to protect it from freezing while it sets and finally you need to protect and heat the concrete while it cures (anywhere from two to seven days). 

The associated costs can add up very quickly... 

Modifié par budgebandit
  • Thanks 1
Lien vers le commentaire
Partager sur d’autres sites

Ne dit-on pas dans l'article plus haut: À partir du printemps 2018 et jusqu’à l’automne 2019, le pavillon multifonctionnel et la place publique seront réalisés. On procédera aussi à l’installation du mobilier urbain et au verdissement. Des travaux d’aménagement des rues Clark et De Montigny, incluant notamment le remplacement et la modernisation des infrastructures souterraines et la plantation d’arbres, seront également effectués au cours de cette période.

A ce que je sache le printemps n'est pas encore arrivé et mieux vaut attendre des conditions climatiques favorables pour que les travaux avancent normalement. Alors la patience est de mise comme dans tout projet public.

Lien vers le commentaire
Partager sur d’autres sites

34 minutes ago, crosbyshow said:

Automne 2019...  Ben long..... il me semble que cela aurait pu être réalisable à temps pour Juin 2019 et ainsi pouvoir en profiter lors de la saison des festivals de l'été prochain.

Automne 2019 est code pour printemps 2020. Si on est vraiment chanceux, on va peut-être avoir la patinoire pour Noël 2019.

Modifié par jerry
Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.


Countup


  • Les dernières mise à jour

    1. 3 587

      Série de vieilles photos de Montréal

    2. 3 587

      Série de vieilles photos de Montréal

    3. 80

      Rénovation de l'Hôtel de ville de Montréal

    4. 80

      Rénovation de l'Hôtel de ville de Montréal

×
×
  • Créer...