Recommended Posts

Pinned posts

Carré Saint-Laurent

Carré Saint-Laurent.jpg

Citation

Nom: Carré Saint-Laurent
Hauteur en étages: 10,20
Hauteur en mètres:
Coût du projet: 160 M$
Promoteur: Société de Développement Angus
Architecte: Provencher Roy & Ass.
Entrepreneur général:
Emplacement: ilot Saint-Laurent / Sainte-Catherine / Clark / René-Lévesque
Début de construction: Début 2017
Fin de construction:
Site internet: http://www.sda-angus.com/
Autres informations: Superficie totale du projet de 47 500 mètres carrés, 900 fonctionnaires provinciaux occuperont 14 000 mètres (bail de 25 ans), une quarantaine de commerces alimentaires au rdc, le premier étage aura une vocation culturelle, un hôtel est prévu dans la tour nord, certification LEED NE, le Cléopatra sera conservé. La tour sur Sainte-Catherine est prévue dans une deuxième phase.
Maquette:
Autres images:
carrésaintlaurent.jpg
Vidéo promotionnelle:

 

Partager ce message


Lien à poster
Partager sur d’autres sites
il y a 27 minutes, denpanosekai a dit :

I'm sorry but I have the same question as Blitz and I don't see how that answers it. Someone please indulge me.

Like rocco said, it's being built in two phases

http://www.cbc.ca/news/canada/montreal/montreal-st-laurent-boulevard-makeover-1.3737054

The first phase of the project will be a six or seven-storey office building on the southern end of the block, near the Monument-National, which will house hundreds of employees from Quebec's immigration department.

The second phase, on the northern end of the block, will be a twelve-storey building for a hotel or private housing. Only the first two floors will be built in the first phase. 

Partager ce message


Lien à poster
Partager sur d’autres sites
il y a une heure, yarabundi a dit :

Excellente densité pour ce secteur de la ville. 

Ce sera excellent quand ce sera bâti au complet! J'espère que ça restera pas inachevé trop longtemps.

Partager ce message


Lien à poster
Partager sur d’autres sites
5 hours ago, nephersir7 said:

Like rocco said, it's being built in two phases

http://www.cbc.ca/news/canada/montreal/montreal-st-laurent-boulevard-makeover-1.3737054

The first phase of the project will be a six or seven-storey office building on the southern end of the block, near the Monument-National, which will house hundreds of employees from Quebec's immigration department.

The second phase, on the northern end of the block, will be a twelve-storey building for a hotel or private housing. Only the first two floors will be built in the first phase. 

I pray that they don't do like Icone phase 2 and forget it! This tower will be excellent for the area, even if it is only a modest 12 floors.

Partager ce message


Lien à poster
Partager sur d’autres sites

J'ai un bon feeling pour ce projet. Toujours déçu qu'on est scrappé les pierres des façades sur St-Laurent, mais jusqu'ici ce qui prend forme me plaît.

Partager ce message


Lien à poster
Partager sur d’autres sites

Le 18 avril : 

Il va y avoir plus d'ouverture que prévu au niveau de l'intégration de l'ancienne façade.

 

9E3A0727-A498-4E05-8338-9623270EA855.jpeg

56100334-C511-4E04-8F02-4917D3ECF324.jpeg

418-A-21237-00-SAINT-LAURENT-PATRIMOINE-2017-04-19-10-1024x622.jpg

418_PATRIMOINE-01-1024x602.jpg

Modifié par deeworks

Partager ce message


Lien à poster
Partager sur d’autres sites
il y a 38 minutes, deeworks a dit :

Il va y avoir plus d'ouverture que prévu au niveau de l'intégration de l'ancienne façade.

Voici trois photos datées de l'ancienne façade, à titre de rappel.

Août 2011.png

Avril 2014.png

Août 2014.png

Partager ce message


Lien à poster
Partager sur d’autres sites
Il y a 12 heures, deeworks a dit :

Le 18 avril : 

Il va y avoir plus d'ouverture que prévu au niveau de l'intégration de l'ancienne façade.

 

9E3A0727-A498-4E05-8338-9623270EA855.jpeg

56100334-C511-4E04-8F02-4917D3ECF324.jpeg

418-A-21237-00-SAINT-LAURENT-PATRIMOINE-2017-04-19-10-1024x622.jpg

418_PATRIMOINE-01-1024x602.jpg

On appelle ça comment? Du pseudo façadisme en surimpression ? Ils sont mieux de nous surprendre avec leur concept ! Je déplore encore amèrement le gâchis des pierres des anciennes façades, notamment pour l'immeuble voisin du Monument national. Je ne sais pas ce que ça aurait donné avec les pierres conservées, mais ça m'enrage tout de même. Donc, surprenez-nous, parce qu'avec la gestion calamiteuse du dossier de l'entreposage des pierres, vous avez une obligation de bon résultat.

En passant, je ne pense pas qu'on parle d'intégration de l'ancienne façade en l'état mais plutôt de rappel. Hormis cette question des pierres et des façades, ce que je vois jusqu'ici est très prometteur.

Modifié par santana99

Partager ce message


Lien à poster
Partager sur d’autres sites

La proposition voulait que les pierres récupérées soient réinstallées, mais que les pierres manquantes où irrécupérables ne seraient pas remplacées. Ça faisait donc des façades avec beaucoup de trous.  

De mon côté, c'est la façade de l'ancien Musée Eden que j'espère revoir reconstituée le plus fidèlement possible. 

au 1206-1212 boulevard St-Laurent.

1975-1980v. StL Eden.jpg

2010v. Eden musée g.jpg

Partager ce message


Lien à poster
Partager sur d’autres sites

Je viens de réaliser que les étages reconstitués seront très peu vitré, chaque ancienne ouverture/fenêtre semble bouchée de briques neuves.  :o

Partager ce message


Lien à poster
Partager sur d’autres sites

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !

Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.

Connectez-vous maintenant

  • Contenu similaire

    • Par Marc90
      Une petite vision volumétrique très sommaire pour l'emplacement d'un potentiel gratte-ciel "slim" à Montréal, dans l'axe de McGill College, derrière le Reine-Elizabeth. Il deviendrait un élément phare du Skyline depuis la future place McGill et depuis le Mont-Royal. Il impliquerait de transformer (et démolissant) l'hideux parking de la Gare Centrale et le building Stantec pour faire une place + parc sur Robert-Bourassa, améliorant le verdissement du secteur. L'intervention permettrait de dégager le bâtiment originel de la Gare Centrale et la façade De La Gauchetière de la Place Bonaventure. La rue DLG serait beaucoup plus accueillante, pouvant à terme devenir un lien piéton ou partagé complet depuis le Quartier Chinois jusqu'au Centre Bell, incluant les interventions liées aux futurs HEC Centre-Ville. 

    • Par IluvMTL
      Proposition:  
      A feasibility study to consider the addition of a tramway line or bus route on McTavish Street to facilitate access to the Belvedere Kondiaronk/Chalet and other areas up the hill from downtown, especially for seniors and the mobility/physically challenged, but also to serve other users.
      Objective
      Making the Mont-Royal and other points up the hill more accessible 
      As it now stands, as far as reaching the lookout or chalet is concerned, the Peel steps and various inclines encountered are out of the question for many, including families. The closest alternate route by public transit is via Guy, plus 2 buses and a walk. That is not very convenient for many. Another important consideration is that there are no elevators in the Guy metro for people who need them.  The McTavish tramway could let people off in the Allan Memorial Institute parking lot, a few steps from the  Route Olmstead which has a much gentler slope for going the rest of the way to the lookout. If a bus route is the option selected, the service could be seasonal, or only in service on week-ends, holidays and special events. Advantages
      A tramway would be an enticement to visit the mountain, and more often, since it would be much simpler and quicker for tourists and montrealers to reach the lookout. It would also ensure that the chalet be better utilized since it would be so much easier to get to, no matter the season. More concerts and special events could be held there throughout the seasons. Since the McTavish line tramway would run though the McGill Campus, it would also be a N-S shuttle of sorts, getting McGill students and employees between the various campus buildings and the REM/Metro/downtown. This line could also be used for residents in the Square Mille, McGill Ghetto as well people going to games at Molson stadium or the other McGill athletic facilities. Being part of the Fleuve-Montagne makes it an natural draw for tourists and this line is only steps away from the main tourist office on Square Dorchester as well as Sainte-Catherine and may major hotels. People could also transfer to the ave des Pins bus for other points east and west. The line is a short hop from McGill Metro, the REM and Central Station, making it part of the hub. The route could be extended further southward to the Tourist office at Dorchester or  widened to cover a broader area if need be. This line would be an alternative to the bus lines that run north, on Guy and du Parc. Easier public access means fewer private cars and tour busses traveling to the mountain, and fewer vehicles on the road. The Kondiaronk summit on Mont-Royal is a major tourist attraction, Let's facilitate access for all groups.
      McTavish Tramway Route (in orange)

    • Par Gilbert
      Bonjour à tous et bienvenue dans cette nouvelle section du forum!
       
      Une section qui vous est entièrement destiné. En effet, vous pouvez nous montrer ici VOS propres projets pour la grande ville de Montréal.
      Comment voyez-vous le Montréal du futur? Quels projets voudriez-vous qu’il y ait?
      Simplement quelques petites restrictions (plus «recommandations» que «restrictions», pour que la section soit tout simplement plus amusante à regarder;) ) :
       
      1- Les projets devront être accompagné d'un appui visuelle
       
      Tout simplement que ce soit plus agréable. Un projet avec un rendu est toujours plus attirant à la critique.
      Exemple: Prenez comme exemple une des propositions de tour pour le Silo no5, même si elle aurait 50 étages, personnes n'en parle vraiment, parce que nous ne savons pas de quoi elle aurait l'air.
      Autre exemple : La tour d'Aluminium, dont tout le monde connaissait comme n'étant qu'une vision, mais qui a tout de même réussi à remplir 4 pages de son fil en deux jours! Si j'avais seulement parlé d'une vision de tour de 240 mètres sans rendus, personnes n'aurait répondu à mon fil!
       
       
      2- Les projets doivent venir de vous
       
      Simplement pour ne pas se retrouver avec des projets annulés. Ce fil n’est pas un fil nostalgique de projet abandonné.
      Aussi, simplement pas prendre de projets existant ailleurs et simplement le mettre, juste pour que Montréal reste la ville unique qu’elle est.
       
       
      Instrument conseillé pour l’appui visuel :
       
      Google sketchup
      Le logiciel est juste…INCROYABLE!
      Il est gratuit, complet (pour les débutant) et surtout…facile à utilisé.
      Je l’ai téléchargé pendant le temps des fêtes et j’ai déjà créé quelques petites choses pour ce fil!
      Vous pouvez le télécharger ici : https://www.sketchup.com/fr
       
       
      Logiciels Adobe
      (Photoshop, illustrator, etc.)
      Quand on les connaît bien, c’est quand même assez facile de travailler avec eux.
       
      ------------------------------------------------------------------------------------------------
       
      Maintenant, à vous de créer vos propres projets! Comment voulez vous que Montréal ressemble?
      P.S. Ce fil est pour les commentaires, les annonces, etc.
    • Par IluvMTL
      http://plus.lapresse.ca/screens/6ae8dd35-0e0b-48e3-b1cb-dec9a5e92473%7CHFo3prp1wfb0.html
       
      Édition du 8 août 2015,
       
      UNE NOUVELLE BRASSERIE À MONTRÉAL
       
      À titre de président du conseil de Molson Coors, Geoff Molson aura une fin d’année bien remplie alors qu’il confirme que l’entreprise brassicole est à compléter une étude qui déterminera si elle construira une nouvelle usine ou rénovera ses installations de la rue Notre-Dame.
       
      Une chose est certaine : le statu quo n’est plus possible et, selon Geoff Molson, la brasserie bicentenaire devrait normalement déménager dans des installations le plus modernes possible. On parle d’investissements qui pourraient dépasser les 300 millions.
       
      « Il faut moderniser notre production et surtout augmenter notre capacité d’embouteillage. Notre brasserie de Montréal ne peut pas produire de la bière en cannettes, et c’est une tendance lourde du marché que l’on observe aux États-Unis. »
       
      — Geoff Molson
       
      « On pourrait construire une nouvelle usine sur nos terrains à proximité de notre centre de distribution de la rue Dickson et vendre nos installations de la rue Notre-Dame à une tierce partie, à la condition que l’on ouvre le site sur le fleuve.
       
      « Ce serait une façon extraordinaire de faire exploser le Vieux-Port de Montréal et de donner, à partir du pont Jacques-Cartier, une belle vitrine sur le fleuve à la population de Montréal », évoque Geoff Molson.
       
      Chose certaine, il n’est pas question que Molson Coors quitte le site qui a vu naître les activités du groupe il y a 230 ans sans y laisser une marque commémorative indélébile.
       
      « On pourrait y construire une microbrasserie, ce qui laisserait l’empreinte de Molson sur le site et perpétuerait l’activité qu’on y pratique depuis plus de deux siècles », propose le président du conseil de Molson Coors.
       
      On saura au début de 2016 si le conseil d’administration disposera de la proposition et de la vision que vient de partager avec nous son président.
       
      sent via Tapatalk
    • Par IluvMTL
      http://ville.montreal.qc.ca/portal/page?_pageid=7317,79867570&_dad=portal&_schema=PORTAL

      COMITE CONSULTATIF D'URBANISME
      13 septembre 2018
      3001459117 et 3001431020
      4.6.39

      DEMANDE  DE CERTIFICAT  D'AUTORISATION DE  DEMOLITION ET DEMANDE DE PERMIS DE CONSTRUCTION
      639-643,rue Notre-Dame Ouest
      La demande  vise a autoriser Ia demolition du batiment ainsi que Ia construction  d'un  hotel de  5  etages  comprenant   21  chambres   et  un restaurant au rez-de-chaussee.
      Le toil,  les  planchers  ainsi que  toute Ia structure  du batiment  existant seront  demolis.    
      Les fac;ades avant  et  arriere  seront  conservees, mais plus de 40% du volume hors-sol sera demoli, done le projet doit etre traite comme   une   demolition   et  une   nouvelle   
      construction.   II  s'agit   d'un immeuble  de 3 etages hors sol, avec une fac;ade de pierre grise, construit en 1891.  Les 2e et 3e etages ainsi que son couronnement  ant conserve leur integrite.  La vitrine commerciale  du rez-de-chaussee ainsi que Ia fac;ade arriere ant ete largement modifiees.