Aller au contenu

Station Anse-à-l'Orme (SADB) - Discussion


Messages recommendés

On 2021-03-14 at 12:01 PM, SameGuy said:

Kirkland has begun the prep work to upgrade the eastern (ie westbound) Chemin Ste-Marie overpass to the Kirkland station, to accommodate active transit and accessibility needs. The only other thing we’ve read so far is that piece about Mayor Belvedere of Pointe-Claire insisting that the planned replacement St-Jean overpass includes significant safety and accessibility upgrades for pedestrians, cyclists and people with special mobility needs. Nothing (or nothing concrete) about Alston/Stillview, des Sources, or Baie-d’Urfé/Anse.

Me thinks we're going to get a whole lot of 2 things: "nah" and "ting".

  • Like 2
Lien vers le commentaire
Partager sur d’autres sites

  • 2 années plus tard...
  • 1 mois plus tard...
  • 1 mois plus tard...
  • 8 mois plus tard...
Il y a 13 heures, Monsieur_MA a dit :

La voici en un seul morceau (sans poteau) avec un peu de Photoshop.

image.png.d4aae09014c072af06e23c30285f1d9d.png

Est-ce que le photoshop était pour enlever les fils électriques?
Belles photos!

Lien vers le commentaire
Partager sur d’autres sites

Il aurait été possible de retirer le filage électrique mais je m'étais concentré sur l'assemblage. Il s'agit en fait de caténaires qui font partie intégrante des installations.

Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Créer...